LCLS-II Introduction. LCLS-II Project Plan and Scope Overview 13 September 2013.

Slides:



Advertisements
Similar presentations
DOE Office of Science Budget Overview
Advertisements

Research Instrumentation Special Interest Group Sensors & Instrumentation Knowledge Transfer Network Report on American Light Source Facilities Oliver.
Superconducting Undulator R&D Proposal for LCLS-II Paul Emma (SLAC) Superconducting Undulator R&D Review Jan. 31, 2014 please MUTE your microphones or.
LCLS-II Scientific Opportunities Workshops LCLS-II Status David Schultz 9-12 February 2015.
Superconducting Particle Accelerator Forum of the Americas December 11, 2013 Dr. Patricia M. Dehmer Acting Director, Office of Science, U.S. Department.
James B. Murphy, Director BES Scientific User Facilities Division
Upcoming Review of the Hall D Photon Beam and Tagger Richard Jones, University of Connecticut, for the GlueX collaboration GlueX Collaboration Meeting.
1 Enhancements to the Linac Coherent Light Source.
Richard M. Bionta XTOD October 12, 2004 UCRL-PRES-XXXXX X Ray Transport, Optics, and Diagnostics, Overview Facility Advisory Committee.
John N. Galayda LCLS FAC 20 April Linac Coherent Light Source Overview and Charge Facility Advisory Committee John.
Opening Comments and Charge 19 January 2004 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear.
John Arthur PIXEL Project April 7, 2005 Status of the Proposed PIXEL Project John Arthur SSRL/SLAC Photon Instrumentation.
LCLS Undulator Systems TDR Charge Linac Coherent Light Source Stanford Linear Accelerator Center Technical Review, March 3, 2004.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Slide 1 George R. Neil Associate Director Jefferson Lab Jefferson Avenue Newport News, Virginia VUV Program Directors Review Plans for a VUV.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Status of LCLS A. Brachmann, SLAC National Accelerator Laboratory.
W.S. Graves, ASAC Review, Sept 18-19, 2003 Accelerator Overview Goals for proposal Description of technical components: injector, linac, compressors, etc.
SuperConducting Undulator (SCU) R&D Motivation and Status P. Emma For the SCU R&D collaboration: ANL, LBNL, SLAC June 27, 2014.
24 April 2015 FY 2016 Budget Request to Congress for DOE’s Office of Science Dr. Patricia M. Dehmer Acting Director, Office of Science
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
Low Emittance RF Gun Developments for PAL-XFEL
Keith O. Hodgson SSRL Director Brief Update on the Linac Coherent Light Source - LCLS February 26, 2002 Basic Energy Sciences Advisory Committee Undulator.
W.J. Foyt LUSI DOE Review July 23, 2007 Project Management 1 Project Management W. J. Foyt Project Scope Timeline Cost Estimate.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
LCLS-IISC Parameters Tor Raubenheimer. 2 Operating modes keV (120 Hz) keV (100 kHz) keV (100kHz) 4 GeV SC Linac Two sources:
W.S. Graves ASAC Review Sept 18-19, 2003 R&D at Bates William S. Graves MIT-Bates Laboratory Presentation to MIT X-ray laser Accelerator Science Advisory.
LCLS_II High Rep Rate Operation and Femtosecond Timing J. Frisch 7/22/15.
Brief Introduction to (VUV/)Soft X-ray FELs R. P. Walker Diamond Light Source, UK ICFA Workshop on Future Light Sources March 5 th -9 th, 2012 Thomas Jefferson.
John N. Galayda LCLS Accelerator Readiness December 2, LCLS Overview December 2, 2008 Project Construction Status.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview Satoshi Ozaki Director, Accelerator Systems Division NSLS-II Project March 27, 2007.
LCLS-II Capabilities & Overview LCLS-II Science Opportunities Workshop Tor Raubenheimer February 10 th, 2015.
DOE Stanford Site Office Office of Science U.S. Department of Energy 1 U.S. Department of Energy’s Office of Science Office of Science Review of the LCLS.
Max Cornacchia, SLAC LCLS Project Overview BESAC, Feb , 2001 LCLS Project Overview What is the LCLS ? Transition from 3 rd generation light sources.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
Workshop Overview, Charge and Deliverables Joachim Stöhr.
LCLS Facility Planning for LCLS-II. 2 LCLS vs. LCLS-II NowHXU - CuSXU - CuHXU - SCSXU - SC Photon Energy Range (eV)
Power Upgrade Project SNS September 21-22, TBM Cost Estimate Cost Estimate Schedule Approach Tom Mann October 27, 2005.
LCLS-II Design and FEL R&D
SCU 3-Lab Review Meeting, Dec. 16, 2014 SCU Presentations Today Intro. & Performance Motivations (P. Emma, SLAC, 20+5) Conceptual Cryostat Design: Option-A.
The Next Generation Light Source Test Facility at Daresbury Jim Clarke ASTeC, STFC Daresbury Laboratory Ultra Bright Electron Sources Workshop, Daresbury,
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Status Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Accelerator.
J. Corlett. June 16, 2006 A Future Light Source for LBNL Facility Vision and R&D plan John Corlett ALS Scientific Advisory Committee Meeting June 16, 2006.
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
G. Penn SLAC 25 September 2013 Comments on LCLS-IISC Design.
LCLS-II Project Overview David Schultz LCLS-II Deputy Project Director March 19, 2012.
LCLS 2009 NSLS-II 2015 APS 1995 BES Light & Neutron Sources SPEAR ALS 1993 HFIR 2008 SNS
1 0.1-nm Hard X-ray XFEL  Project Period: 2011 ~ 2015  Total Budget: 400 M$  10-GeV Electron Linac (Normal Conducting S-band, 60 Hz)  Total Length:
Cost and Schedule Paul Weinman Pacific Northwest National Laboratory.
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
1 NGLS Outline and Needs in Superconducting RF Materials Development John Corlett SRFMW, July 16, 2012 Office of Science.
Jefferson Lab Overview
LCLS-II Cost Details E. Daly / C. Hovater / M. Wiseman with help from Accel Ops and Engineering 03-AUG-2017.
Status and Interest of the X-ray FEL SINAP
Experimental Facilities Planning
Gu Qiang For the project team
LCLS Instrument Development
LCLS-II-HE FEL Facility Overview
Preparations for a Lehman Review
LCLS-II-HE FEL Facility Overview
A Cold SCU Phase-Shifter
WBS 5.0 LCLS Strategic Projects Division
Advanced Research Electron Accelerator Laboratory
Brief Introduction to (VUV/)Soft X-ray FELs
Electron Beam Systems ETC and Methodology
Project Management Issues John N. Galayda, SLAC April 24, 2002
Experimental Program and Endstations System (WBS ) J
PIXEL Project Status John Arthur Photon Instrumentation for
Preliminary Project Execution Plan
SNS-PPU upgrades the existing accelerator structure
Presentation transcript:

LCLS-II Introduction

LCLS-II Project Plan and Scope Overview 13 September 2013

3 Outline LCLS-II Background BESAC Recommendations LCLS-II Project Definition Operating Parameters and Source Considerations Project Timetable Partner Laboratory Integration LCLS-II Overview

Slide 4 LCLS II Scope of Work  Injector at sector 10 (120Hz)  Two variable gap undulators  Soft x-ray instrument  302 m undulator tunnel  94mx15m experiment hall LCLS-II Overview Schedule CD-04/2010 CD-110/2011 CD-3a3/2012 CD-22012* CD-3b2014 CD * Ready for CD-2 8/2012 – Trapped by “no new starts” provision in FY13 Continuing resolution

5 LCLS-II Key Performance Parameters Performance MeasureObjective KPP Electron Beam Energy13.5 GeV Photon Beam Tuning Range250-13,000 eV Additional Space for InstrumentsSpace for 6 Experiment Stations Facilities Gross Square Feet~90,000 GSF LCLS-II Overview 250eV - 2,000 eV source: Spectroscopy at moderate peak power High-field physics at high peak power Nonlinear optical soft XR wavelengths 2,000-13,000 eV source: Single-shot imaging at ~1nm to ~0.1nm resolution

6 FEL Science – The BESAC recommendations : High repetition rate; at least keV; high pulse energy 5-20 keV C K edge keV 0.2 keV 5.0 keV Cu L III edge keV Gd M V edge keV Ru L III edge keV S K edge keV de novo phasing using Single Wavelength Anomalous Diffraction from Sulfur: 4-5 keV High repetition rate lower peak power science: at least 0.2-5keV Time resolved RIXS High T C Superconductors Catalysis (CO on Ru) Coherent X-ray Imaging of magnetic domain in Gd/Fe Non-periodic imaging: 2-5 keV Correlated Electron Systems Sulfur spectro-microscopy in bio/environmental science LCLS-II Overview

7 5 keV 20 keV High energy per pulse science keV Fe K edge keV Cu K edge keV Ir L III edge keV Se K edge keV Si(777) backscatter keV Energy Loss (eV) Iridates: model strongly correlated materials Time resolved Resonant solution scattering Co K edge keV Magnetic polarities of a cobalt alloy Charge-stripe ordering in LSCO superconductor Serial Femtosecond Crystallography de novo phasing using Multiple Wavelength Anomalous Diffraction from Selenium Phonons in superconductivity High magnetic fields KeV disentangle competing orders Solute-solvent interactions in photo-excited reactions FEL Science – The BESAC recommendations : High repetition rate; at least keV; high pulse energy 5-20 keV LCLS-II Overview

The LCLS-II Project Definition (8/16/2013) AcceleratorSuperconducting linac: 4 GeV Undulators in LCLS-I Tunnel New variable gap (north) New variable gap (south) InstrumentsUse existing instruments (instrument and detector upgrades needed to fully exploit) Cost (TPC)TBD with SC/BES keV (120 Hz) keV (100 kHz) keV (100kHz) 4 GeV SC Linac NEHFEH 8 LCLS-II Overview

9 High repetition rate beam available to all instruments with two variable gap undulators Catalysis Pump-Probe High T C Superconductors Time resolved RIXS Iridates: model strongly correlated materials Time resolved RIXS de novo phasing using Single Wavelength Anomalous Diffraction from Sulfur: 4-5 keV Serial Femtosecond Crystallography Time resolved Resonant solution scattering keV (120 Hz) keV (100 kHz) keV (100kHz)  Instrument upgrades and R&D needed to fully exploit high rep rate LCLS-II Overview

10 Operating modes keV (120 Hz) keV (100 kHz) keV (100kHz) 4 GeV SC Linac North and south undulators always operate simultaneously in any mode UndulatorSC Linac (up to 100kHz)Cu Linac (up to 120Hz) North keV South keVup to 18 keV higher peak power pulses Cu Linac Concurrent operation of 1-5 keV and 5-18 keV is not possible LCLS-II Overview

11 Preliminary Operating Parameters LCLS-II Overview Preliminary LCLS-II Summary Parameters v0.78/30/13 North Side SourceSouth Side Source Running modeSC Linac Cu Linac Repetition rateup to 1 MHz* 120 Hz Electron Energy4 GeV 14 GeV Photon energy keV1-5 keV1-20 keV Max Photon pulse energy (mJ) (full charge, long pulse) up to 2 mJ* up to10 mJ Peak Spectral Brightness (10 fs pulse) (low charge, 10pC) 3.9x10 30 **12x10 30 **247x10 30 ** Peak Spectral Brightness (100fs pulse) (full charge, 100pC) 3.0x10 30 **6.9x10 30 **121x10 30 ** * Limited by beam power on optics **N_photons/(s*mm^2*mrad^2*0.1% bandwidth)

12 We Need the Help of Partner Labs for LCLS-II Overview Superconducting linac and cryosystems High brightness, high repetition rate gun/injector New soft x-ray undulator and A hard x-ray undulator that replaces the existing LCLS undulator

13 The Next Steps for SLAC to Engage Partners Visit the prospective partner labs: LBNL 5 Sept. FNAL 10 Sept. ANL 11 Sept. JLAB 13 Sept Share parameter list Ask for preliminary information on scope, schedule, cost Ask readiness assessment for each element from the lab Ask for development: scope, schedule, cost Share information during workshop Refine project plan LCLS-II Overview

14 Potential Areas of Collaboration with Partner Labs SLACLBNLFNALJLABANLCornell Wisconsin InjectorXXX UndulatorXX SC linac prototypeXXX SC LinacXX SC cryo lineXX Cryo plantXX LLRFXXXX RF systemsX Beam PhysicsXX Instruments/ Detectors XX PM/IntegrationX InstallationXXX CommissioningX LCLS-II Overview

15 Timeline for the next 6 month  Next 6 weeks: Partner lab visits Oct : Workshop at SLAC with all partner labs to freeze preliminary design, scope, prototype development plan  Development basis of estimate documents, integrated schedule, integrated cost estimates.  Negotiate with partner labs and review on scope, schedule and cost.  In parallel: Start prototype developments and procurements November 25: integrated scope-schedule-cost assembled  Revise documents Directors review Dec Adjust arrangements based on review outcome, if necessary  Revise documents Lehman review Jan , 2014 Adjust arrangements based on review outcome, if necessary

16 SLAC Points of Contact DOE September 3, 2013 TeleVideo For ongoing exchange of information Leading to definition of the collaboration Labs’ scopes of work Personnel and RRAA Exchange of technical/cost/schedule information FEL/Accelerator PhysicsTor InjectorJohn Undulators & photon systemsMichael LinacMarc CryoplantRobert Law Business SystemsCindy Cost/Schedule/EVMSRichard M QA & System IntegrationLori J

17 Integration Between SLAC and Partner Labs SLACPartner Laboratory Interface with DOE: BES & SC Accountable for performance of the entire project including oversight of partner labs’ performance Baseline, EVMS & contingency control Overall project management Responsible for management of work on agreed-upon scope Meeting project requirements for subsystems Effective, efficient management of project activities to meet overall goals System design and integration Setting performance specifications Performance verification Building construction Integration / QA / Safety / Schedule Construction overhead rate agreement Designing/detailing to specification Procuring / Manufacturing Delivering Conformance Interlab QA Construction overhead rate agreement Installation Testing + Commissioning & Operation Supporting installation Supporting commissioning Basic Roles and Responsibilities: LCLS-II Overview

18 Project Collaboration DOE September 3, 2013 TeleVideo The Project (SLAC, partner labs and all) must function as a SINGLE organization with a SINGLE set of priorities The Project must face and resolve challenges to the success of the project in all areas (cost/schedule/technical) This requires commitment to the Project’s goals at SLAC and at partner labs This requires the collaborating labs have confidence that the burden of solving problems is shared fairly This requires that each of the collaborating labs accept responsibility for achieving best all-around performance through good management, planning and execution

19 Project Collaboration Technical teams discuss and agree to (if possible): PM/PLM software packages Procurement database Staffing profiles, org charts, time sheet verification etc Lab Senior Management discuss and agree to: High Level time line Establishment of Lab Directors council Roles and responsibilities between partner labs Construction overhead rates Senior team leaders in each lab

20 DOE September 3, 2013 TeleVideo Summary Envisioned facility fulfills all BESAC Light source subcommittee recommendations New Scientific Capabilities Leverages Existing SLAC infrastructure Partner laboratories

21 Discussion LCLS-II Overview

22 Back-Up LCLS-II Overview