LED1 LED2 LED8 LED9 LED7 LED6 LED5 LED4 CON1 CON4 CON2 CON3 CON5 CON6 A00380 Control Board LED10 JP12 JP10 JP11 LED11 LED12 LED13 LED14 A00380 LED’S.

Slides:



Advertisements
Similar presentations
Basic Jens Neigaard.
Advertisements

Slide 1 Comarra Limited Slide 1 VCL - MegaConnect - Jr., T1 DACS Slide 1Comarra Limited Slide 1 COMARRA Telecom Transmission Solutions 16 Port,
Orion Telecom Networks Inc VCL-E3 OLTE 34Mbps Optical Line Transmission Equipment Slide 1 Updated : January 1st, , Avenue of Fountains,
Orion Telecom Networks Inc VCL-E1 DACS 8 Port, E1 Digital Access Cross Connect Switch Slide 1 Updated : January 1st, , Avenue of Fountains,
EMerge Browser Managed Security Platform Module 2 Hardware install.
GS3055-I GSM Universal Wireless Alarm Communicator
Orion Telecom Networks Inc Slide 1 16 Port, E1 Digital Access Cross Connect Switch VCL-MegaConnect - Jr. E1 DACS Updated : March, , Avenue.
PXL-500/-510 Tiger Controller II
PICNIC Demo Module 2 IP-based utility outlets 陳育瑋、方煒 台大生機系.
Introduction System Schematic ~ LON-FO NC EC200 LOOPS 2-4 FIBRE OPTIC
EUT 1040 Lecture 10: Programmable Logic Controllers.
GST FIRE ALARM SYSTEM INTERNATIONAL BUSINESS DEPARTMENT , GST BEIJING
File/ 1 Primary colours Secondary colours Remember to change file name 28pt Ariel bold 18pt Ariel bold l Distributed PID Control and I/O What is.
Overview of New System Beta Team from Wilsonville 1425 Wilsonville Robotics – Code Xero 2550 Oregon City Robotics.
CR1000s are only one part of a data acquisition system. To get good data, suitable sensors and a reliable data retrieval method are required. A failure.
Ethernet Hardware Cabling –Twisted Pair 100 Meter length limit Point to Point –Fiber Expense Point to Point 2000 meter length limit.
DP Cabinet.
Training.
CR1000s are only one part of a data acquisition system. To get good data, suitable sensors and a reliable data retrieval method are required. A failure.
EUT 1040 PLC Timers and Motor Protection. Industrial Communications RS-422 (EIA 422): Asynchronous Serial Communications, similar in many respects to.
MUST HAVE SHOULD HAVE COULD HAVE Module # 010. Qi Hardware Objectives Recognize hardware Know how to interface to field equipment Know the 4 different.
SF-3000 Installation Manual. 2 Back of SF CON400) USB connector - User can use USB memory stick after connect USB connector of key PCB. CON500)
1  Module Type Overview  Construction  Characteristics  Installation principles  Details PD 600-Series.
ZIGBEE Network Introduction Integrated with Zigbee or Bluetooth products Operation voltage : DC 7V ~ 40V. RS232 Interface Meets or Exceeds TIA/EIA-232-F.
SmartLine Startup.
ST/PRM3-EU | | © Robert Bosch GmbH reserves all rights even in the event of industrial property rights. We reserve all rights of disposal such as copying.
INTRUSION ALARM TECHNOLOGY
E VERY L IFE H AS A P URPOSE… Chillgard ® L Series Refrigerant Monitors.
ST/PRM3-EU | | © Robert Bosch GmbH reserves all rights even in the event of industrial property rights. We reserve all rights of disposal such as copying.
SCADA and Telemetry Presented By:.
Baseboard Aavikkomursu 7.2. Aavikkomursu Micro- controller Extension port for programming microcontroller and sensor input Resistor RS485 interface chip.
Subnetting AND = AND = COMPARED (MINUS) TO =
Arctic Control Introduction V 1.0. Arctic Control The Arctic Control is a device with integrated wireless communications for controlling medium-voltage.
1 Applied Control Systems Technology. 2 Pin configuration Applied Control Systems.
Doc. Ver. : V1.10 Feb., R&D Center Union Community Co., Ltd. Doc. Ver. : V1.10 Feb., R&D Center Union Community Co., Ltd. Installation &
Matrix and Interfaces overview.  Digital Matrix with 15 user slots capable of 480 ports full-duplex communication ports housed in a 6RU frame. The.
Single Loop Analogue addressable fire control Panel
Star I Controller Input/Output Numbering on Controller and MIRO Devices.
ECP Extinguishing Control Panel. Extinguishing Control Panel General overview Technical overview.
BOOT MODE 1 BOOT MODE 2 BIOS COMMUNICATION DEFAULT CONTROLLER INVERT RELAY OPERATION ENABLE COMM FAIL RELAY CONTROL RELAY OFF / ON COMM.
TYPICAL SCADA SYSTEM FIELD UNIT SCADA H/W & S/W C TX O RX M E M Q N P
GS3055-I GSM Universal Wireless Alarm Communicator
NFS System Components & Installation.
Hardware Training Product: ITMS2.
Electric Circuits Series and Parallel Circuits. Light a bulb  You are given: Wires, a bulb and a battery. Your job is to: Light the bulb.
The 3 parts of an electronic system are :
2 December, 2015 New Conventional Fire Control Panel.
EPack relaunch. Schneider Electric 2 -Industrial – Eurotherm – 16/12/2015 ●1. Reduce your equipment costs.
EeePC – Ubuntu Running pvMon USB cable Phidget I/O Controller Photovoltaic panel Power/System Connections I V PV charger Cont. Phidget I/O Controller +12.
New product introduction:
NEPTUNE Power Low Voltage Circuit Fall 2003 Quarterly Meeting Tim McGinnis Sept 11-12, 2003.
06/18/04 1 Analog Audio Hardware and Operations. 06/18/04 2 Module 5 Objectives Upon completion of this module, the student will be able to:  Explain.
# No Function Privacy Mode On/Off No Function * Play Message Alarm Pullcord LED Indicator (Central) Red Alarm Call Flashing RedExtracare Mode GreenPrivacy.
Tynetec manufacture One main type of Pendant Receivers for the Advent xt system: Network Receiver169MHz & 433MHz.
Top 10 Differentiators.
A Competitive Overview Jon Cramer and Steve Floth Regional Sales Managers.
Door Controller Device. 2 Door Controller Device (DCD) The DCD is the “Remote Brains” of the system. It is the controller device located at each access.
Relay Controller Device. 2 Relay Controller Device (RCD) If additional relays are needed beyond the two that are available on the DCD, then a RCD can.
24v 12v 0v Tx+ Tx- SPK1 SPK2 MIC PA 1 PA 2 Use CW1308 Twisted Pair or Tunstall Telecom Cable (use 0.8mm pair for 24v & 0v) Minimum Cabling requirements.
Lecture 10: Programmable Logic Controllers
Site Controller Unit and Trunk Interface Unit
I-Station Hardware, Installation & maintenance
Connections Topology of Apollo ACS.
SKYLINE SKYLINE HAS CHANGED THE WAY THE POLEBOX CARD SHOULD BE WIRED AND ALL FUTURE NEW INSTALLS WILL BE DONE THIS WAY. IF YOU GO TO A SITE TO WORK ON.
Network Solutions Rev J. 11/8/2018.
Gadget Hub Power (mains) Controller.
PLC’s Are ... Similar to a Microcontroller: Microprocessor Based
Module 1 – Power Supply AMC APS-PBC-60
EUT 1040 Lecture 10: Programmable Logic Controllers Unrestricted.
Honeywell Fire Systems Group RFX SLC L1: Det.159 Mod. 159 SLC L2: Det.159 Mod. 159 SLC L3 ~ L10 EIA 485 EIA 232 RDP Up to 32 Noti-Fire-Net Onyxworks.
Presentation transcript:

LED1 LED2 LED8 LED9 LED7 LED6 LED5 LED4 CON1 CON4 CON2 CON3 CON5 CON6 A00380 Control Board LED10 JP12 JP10 JP11 LED11 LED12 LED13 LED14 A00380 LED’S LED1Spare RS485 LED2Spare RS485 LED3BT Line Seize LED4Any Alarm Relay 1 LED5Fire Alarm Relay 2 LED6DTMF Relay 3 LED7BT Line Fault LED8Network RS485 LED9Network RS485 LED10Speak/Listen LED1124v Supply Healthy LED1212v Supply Healthy LED135v Supply Healthy LED 143v3 Supply Healthy LED3

LED1 LED2 LED8 LED9 LED7 LED6 LED5 LED4 CON1 CON4 CON2 CON3 CON5 CON6 A00380 Control Board LED10 JP12 JP10 JP11 LED11 LED12 LED13 LED14 A00380 Board Connectors CON1Local Programming Port CON2BT Line In CON3Earth CON4Ethernet Port CON5Dect Line Out CON6Audio to Termination Board A00380 Power Connections JP1027v Input from PSU JP1124v Battery JP12Power Out to Termination Board LED3

A00381 Termination Board F1 F2 F3 F4 F5 F6 LED3 LED4 LED5 LED6 LED7 LED8 24v 12v 0v + - SP1 SP2 MIC PA1 PA2 RS485 NETWORK 1 NETWORK 2 NETWORK 3 EN AUD 0v PA1 PA2 IP4 0v OP1 OP2 OP3 OP4 LED9 RS232 DATA LED2 LED1

A00381 Termination Board F1 F2 F3 F4 F5 F6 24v 12v 0v + - SP1 SP2 MIC PA1 PA2 RS485 EN AUD 0v PA1 PA2 IP4 0v OP1 OP2 OP3 OP4 FIRE ALARM N/O CLEAN CONTACT LED3 LED4 LED7 LED6 LED5 LED8 LED9 RS232 DATA LED2 LED1

A00381 Termination Board F1 F2 F3 F4 F5 F6 24v 12v 0v + - SP1 SP2 MIC PA1 PA2 RS485 EN AUD 0v PA1 PA2 IP4 0v OP1 OP2 OP3 OP4 LED3 LED4 LED7 LED6 LED5 LED8 LED9 RS232 DATA LED2 LED1 OP1ANY SUBS ALARM/BEACON OP2RELAY ACTIVE ON FIRE ALARM OP3BT LINE SELECT OP4BT LINE FAULT

A00381 Termination Board F1 F2 F3 F4 F5 F6 24v 12v 0v + - SP1 SP2 MIC PA1 PA2 RS485 EN AUD 0v PA1 PA2 IP4 0v OP1 OP2 OP3 OP4 LED3 LED4 LED7 LED6 LED5 LED8 LED9 RS232 DATA LED2 LED1 A00381 ONBOARD FUSES F11.6A24V NETWORK F21.6A12V NETWORK F31.6A24V NETWORK F41.6A12V NETWORK F51.6A24V NETWORK F61.6A12V NETWORK There is Fuse protection on the 12v & 24v DC supplies on each of the 3 Network connections. The LED’s alongside each fuse will extinguish if a fuse is blown.

A00381 Termination Board F1 F2 F3 F4 F5 F6 24v 12v 0v + - SP1 SP2 MIC PA1 PA2 RS485 EN AUD 0v PA1 PA2 IP4 0v OP1 OP2 OP3 OP4 LED3 LED4 LED7 LED6 LED5 LED8 LED9 RS232 DATA LED2 LED1 A00381 ONBOARD LED’s LED1 24V HEALTHY SUPPLYLED7 24V NETWORK 3 LED2 12V HEALTHY SUPPLYLED8 12V NETWORK 3 LED3 24V NETWORK 1LED9 RS232 DATA LED4 12V NETWORK 1 LED5 24V NETWORK 2 LED6 12V NETWORK 2

24v 12v 0v Tx+ Tx- SPK1 SPK2 MIC Use CW1308 Twisted Pair or Tunstall Telecom Cable (use 0.8mm pair for 24v & 0v) Minimum Cabling requirements for Standard Advent ‘xt’

24v 12v 0v Tx+ Tx- SPK1 SPK2 MIC PA 1 PA 2 Use CW1308 Twisted Pair or Tunstall Telecom Cable (use 0.8mm pair for 24v & 0v) Minimum Cabling requirements for Advent ‘xt’ (with All Call)

Advent ‘xt’ (with All Call) Terminated on A00381 Advent xt Termination Board

Use 1 Pair CW1308 for 0V (if possible) A00381 Termination Board

White/Brown Brown/White 1 Pair for 0v (if possible) White/Orange Orange/White Blue/White White/Blue White/Green Green/White White/Grey Grey/White Red/Blue CW1308 Cable Example

+-+- Differential Receiver Balanced Pair The Differential Receiver determines the potential between the Two cables. If any interference is present on either of the Cables, it will be coupled onto the other. The receiver will then be able to determine the potential between the cables & give a smooth correct output. Why twisted / balanced pair cable MUST be used ?

+-+- Differential Receiver NOT Balanced Pair If Twisted/Balanced pair cable is NOT being used, any interference that is present on either of the cables will NOT be coupled onto the other. The receiver will then be UNABLE to Determine the potential between the two cables and will give a poor output. Why twisted / balanced pair cable MUST be used ?

Advent xt Intercom Unique Intercom 8 Bit Binary Address DIL SWITCH No ON = Binary Code

Advent xt Intercom Additional Intercom Equipment Via Options Dil Switch (SW4) 1I/O UnitDisabledEnabled 2Door Entry ModeDisabledEnabled 3Door Entry InterfaceTelephoneIntercom 4PIR DetectorDisabledDisabledEnabled 5Slave IntercomDisabledEnabled 6SpareN/AN/A 7Not UsedN/AN/A 8Not UsedN/AN/A Switch No. Function OFF ON

Examples of Advent xt Cabling MUST HAVE End of line Intercom Voltages at end of Line Intercoms should be > 18v

Examples of Advent xt Cabling MUST HAVE End of line Intercom Data or Audio CANNOT be looped back to CCU Incorrect way to cable Voltages at end of Line Intercoms should be > 18v

Examples of Advent xt Cabling End of line Intercoms Multiple Legs Voltages at end of Line Intercoms should be > 18v

Examples of Advent xt Cabling End of line Intercom One Leg Voltages at end of Line Intercoms should be > 18v

Examples of Advent xt Cabling Branched Legs DO NOT CABLE THIS WAY (if a re-cable or New Build) Incorrect way to cable

Pullcord Cabling on Advent xt Intercoms Daisy Chain Configuration (when using this configuration a 4K7 Resistor must be fitted in the End of line Pullcord) 4K7 Lounge Bedroom Bathroom Kitchen

Pullcord Cabling on Advent xt Intercoms Star Configuration (Wired back to Intercom Individually) (when using this configuration a 4K7 Resistor must be fitted in each Pullcord) Bedroom BathroomKitchenLounge 4K7

Pullcord Cabling on Advent xt Intercoms 4K7 9 0v NOTE: If there are NO Pullcords fitted A 4K7 Resistor MUST be terminated across Terminals 0v & 9 of the Intercom.

ZXT300 Status Module Cabling on Advent xt

Advent xt Current Consumption of 24v Network Devices 24v Network DeviceStandbyActive Intercom Unit2mA10mA Ceiling Pullcord with 24v LED0mA10mA Door Entry Telephone5mA15mA Manager/Lift Callpoint2mA10mA Digital Door Panel20mA200mA Network Receiver10mA10mA Status Module12mA12mA

Additional Input Devices on Advent xt Intercom v Com Intercom Termination Board PA2 PA1 18K 47K 18K 47K Carbon Monoxide Natural Gas Client Wandering Hypothermia Please Note: The Intercom CANNOT have the facility to have Additional Hardwired Inputs if Combined Door Entry is to be fitted

Additional Output Devices on Advent xt Intercom v Com Intercom Termination Board To allow the N/O Clean Contact to be activated LK1 inside Intercom must be fitted in position ‘B’ N/O CLEAN CONTACT O/P Please Note: The Intercom CANNOT have the facility to use its N/O Contact if Combined Door Entry is to be fitted