INTEGRATED SUBSYSTEM BUILD & TEST ANDRE PELLETREAU, JEREMY WILLMAN, KAI MASLANKA, VINCENT STOWBUNENKO, & KERRY OLIVEIRA.

Slides:



Advertisements
Similar presentations
Variable Frequency Drives Bypass Options
Advertisements

GASMET DX4040 Antti Heikkilä.
Lab7: Introduction to Arduino
DATA ACQUISITION SmartLog X3 DescoEMIT.com Rev:
Troubleshooting Training Course.  Visual and General Test  Perform System Test (Mode  Perform System Test)  Identify The Error  If you need Technical.
What is Arduino?  Arduino is a ATMEL 168 micro-controller kit designed specially for small projects  User friendly IDE(Integrated Development Environment)
AC-SSC-1 Installation and operation manual
COMPUTER PROGRAMMING I Essential Standard 5.02 Understand Breakpoint, Watch Window, and Try And Catch to Find Errors.
InnoSys Process Sequence. End Effector Components End Effector Prox Switch Load Cell Wire Conduit Crows Foot Nut Runner.
1 Embedded Stroke Evaluation System Amanda Sweeney, 4ECE Supervisor: Martin Glavin.
Basic fill color R 100 G 160 B 200 Accent 1 ”Logo Blue” R 0 G 39 B 118 Yellow (highlight) R 252 G 217 B 0 Accent 2 R 118 G 118 B 118 OP300 Technical training.
Make the most of your energy Looking for accurate electric energy metering and simple, easy installation? PowerLogic ® Energy Meter December 2008 Energy.
Copyright 2014 Kenneth M. Chipps Ph.D. Network Management Using Sensors to Monitor Network Equipment Rooms Last Update
Team Manager - Travis Blais Project Manager - Jordan Shields Manufacturing Leader - Evan Lumby Software Leader - Samuel Slezak Maval Visit Summary (October.
DEBUGGING TECHNIQUES. Wiring Type of wire to use Solid core for breadboard Multiple-strand for flying leads and connections to power supply unit (PSU)
Chapter 22 All About SCSI.
The IDE (Integrated Development Environment) provides a DEBUGGER for locating and correcting errors in program logic (logic errors not syntax errors) The.
A6: Team Rallye Potable Water Still Presented by: Full Group November 15, 2006.
Students: Asulin Ofir Heller Itai Supervisor: Mony Orbach In association with: June 16, summer 2006.
Coordinate Based Tracking System
16/27/2015 3:38 AM6/27/2015 3:38 AM6/27/2015 3:38 AMTesting and Debugging Testing The process of verifying the software performs to the specifications.
Cambodia-India Entrepreneurship Development Centre - : :.... :-:-
For Electric Vehicle Team Members Pramit Tamrakar- Electrical Engineering Jimmy Skadal- Electrical Engineering Hao Wang- Electrical Engineering Matthew.
Made in United States of America EMIT SIM emit.descoindustries.com Rev:
Watt Watch Hassan Alabudib Yirui Huang Peng Chen Kamal Sabi Marisol Lozano Roman.
Random access memory is a form of computer data storage. A random-access device allows stored data to be accessed directly in any random order.
SudokuEHG Michelle Brown Matt Haggenmiller Thomas Troch CE Design Projects Design Review December 12, 2007.
Silicon Labs ToolStick Development Platform
Group Members: Brad Cox Kevin Burkett Tera Cline Arthur Perkins CS10 Battery Management System.
A* candidate for the power supply Wiener MPOD-LV crate w/ remote control only (except for local on/off switch) Type “EC LV” Front or rear connections (reverse.
Computer Programming and Basic Software Engineering 4. Basic Software Engineering 1 Writing a Good Program 4. Basic Software Engineering.
WORKFLOW IN MOBILE ENVIRONMENT. WHAT IS WORKFLOW ?  WORKFLOW IS A COLLECTION OF TASKS ORGANIZED TO ACCOMPLISH SOME BUSINESS PROCESS.  EXAMPLE: Patient.
1 QUICK TECH HELP HARDWARE. 2 HARDWARE TROUBLE SHOOTING. S. no. PROBLEMSREMEDY 1Non start of Computer  Check whether Floppy is left in Floppy drive Check.
Setting up the Ricoh C305 Press F5 to start the Presentation
Individual Subsystem Testing Report New Jersey Space Grant Consortium with Rutgers University Stevens Institute of Technology 2/13/2012.
Module 6: Debugging a Windows CE Image.  Overview Debug Zones IDE Debug Setup IDE Debug Commands Platform Builder Integrated Kernel Debugger Other Debugging.
3-Phase Submersible Motor Control
Microcontrollers Module 3: Digital Display. 7 – Segment Display A seven-segment display (SSD), or seven- segment indicator, is a form of electronic display.
Eye Tracking and its Application in MRI and EEG Settings
Trey Herrington Electrical Engineer - Backup Power Supply - Backup Power Supply - PCB Design - PCB Design Samantha Prine Electrical Engineer -Enclosure.
Trey Herrington Electrical Engineer - Backup Power Supply - Backup Power Supply - PCB Design - PCB Design Samantha Prine Electrical Engineer -Enclosure.
Subsystem Design Review P16203 Andre Pelletreau, Kerry Oliviera, Jeremy Willman, Vincent Stowbunenko, Kai Maslanka.
Hardware Introduction – Standard vs Q.i
TEST PROCEDURE Testing the Controller Board, Power Supply Board, and Unit as a Whole.
Smart Power Supply Test Bench P16203 ANDRE PELLETREAU, KERRY OLIVIERA, JEREMY WILLMAN, RADOSLAW MASLANKA, VINCENT STOWBUNENKO.
CSC 1201 LAB RULES Nouf Aljaffan (C) CSC 1201 Course at KSU.
Section 1: Mission Overview Mission Statement Mission Objectives Expected Results System Modifications Functional Block Diagrams 2.
Wheelchair Navigation Aid Technical Content Review By Rob Riel.
A Quick Introduction to Arduino and Sensors Philip C. Fulmer, PhD, CHP Francis Marion University Florence, SC.
AAPT workshop W03 July 26, 2014 Saint Cloud State University, MN, USA
© Janice Regan, CMPT 300, May CMPT 300 Introduction to Operating Systems Operating Systems Overview: Using Hardware.
REDA Production Systems
Debugging using By: Samuel Ashby. What is debugging?  A bug is an error in either a program or the hardware itself.  Debugging is first locating and.
Software Troubleshooting Eliminate possible programming and timing errors by stopping all programs ( and ). Use the Executive program terminal and send.
ProCal Calibration Lifecycle Setting Up and Performing a Calibration.
Background Customer Requirements Final Test Fixture Subsystems P16203: Smart Power Supply Test Bench CUSTOMER: Bear Power Supplies, Phelps, NY PROBLEM:
Arduino based Automatic Temperature Controlled Fan Speed Regulator.
Development of T3Maps adapter boards
Instrumented Walker Skyler Bullington Tommy Frankenberger Larson Stacy
Computer Programming I
Subsystem Build & Test Andre Pelletreau, Jeremy Willman, Kai Maslanka,
‘SONAR’ using Arduino & ultrasonic distance sensor
Testing Key Revision Points.
MSD P15280 RIT HOT WHEELZ TEST BENCH
ECE 3567 Microcontroller Lab
Splash.
Team P16228: Magnetically Levitated Propeller
Presentation transcript:

INTEGRATED SUBSYSTEM BUILD & TEST ANDRE PELLETREAU, JEREMY WILLMAN, KAI MASLANKA, VINCENT STOWBUNENKO, & KERRY OLIVEIRA

MECHANICAL ENCLOSURE STATUS UPDATE Aluminum enclosure assembled Aluminum enclosure assembled Hinges, fans, fan screen attached Hinges, fans, fan screen attached Scatter shield cut and assembled Scatter shield cut and assembled AC voltage monitor, emergency stop and LCD screen mounted AC voltage monitor, emergency stop and LCD screen mounted Scatter shield hinge/lock holes drilled Scatter shield hinge/lock holes drilled Phase 5 plans: Attach locks and scatter shield Attach locks and scatter shield Mounting of testing boards Mounting of testing boards Accessories (grommets, rubber feet, u channels, etc) Accessories (grommets, rubber feet, u channels, etc)

LOAD BOARD – CONSTANT CURRENT - CURRENT REMAINS CONSTANT OVER WIDE RANGE OF LOAD VOLTAGES PWM ValueCurrent (mA)Voltage

LOAD BOARD – CONSTANT CURRENT -CURRENT STAYS CONSTANT AFTER DISABLING THEN RE-ENABLING THE CONTROLLER BOARD PWM ValueCurrent (mA)Voltage

LOAD BOARD – CONSTANT CURRENT -CURRENT STAYS CONSTANT AFTER RECOMPILING AND RERUNNING CODE PWM ValueCurrent (mA)Voltage

LOAD BOARD – CONSTANT CURRENT -CURRENT STAYS CONSTANT AFTER RECOMPILING AND RERUNNING CODE VoltageCurrent (mA)Voltage

RELAY BOARD AND AUTOTRANSFORMERS Relay Board is complete Relay Board is complete Using jumper wire to bypass 2 connectors for ease of testing, will incorporate in final testing. Using jumper wire to bypass 2 connectors for ease of testing, will incorporate in final testing. Autotransformers tested and wired up properly. Ready for use in final test phase. Autotransformers tested and wired up properly. Ready for use in final test phase. Note: 264 VAC transformer actually outputting 275 at no load. Safe to assume this will lower when load is applied? Note: 264 VAC transformer actually outputting 275 at no load. Safe to assume this will lower when load is applied?

CONTROLLER BOARD TESTING Electrical testing complete Electrical testing complete Wire harnesses partially assembled Wire harnesses partially assembled Software testing to begin this weekend Software testing to begin this weekend Need to get Bear Supply (12V 36W) Need to get Bear Supply (12V 36W)

SOFTWARE PROGRESS Debug mode ready for hardware testing Debug mode ready for hardware testing Great debugging tool: Visual Studio w/ Arduino extension Great debugging tool: Visual Studio w/ Arduino extension Unlike regular Arduino IDE, breakpoints CAN be set and executed while running the Arduino board Unlike regular Arduino IDE, breakpoints CAN be set and executed while running the Arduino board Easily watch variables Easily watch variables Most error codes done Most error codes done About half of them are working About half of them are working LCD display working LCD display working

DEBUGGING MODE Software code is separated into sections and now can be individually disabled/enabled, including: Software code is separated into sections and now can be individually disabled/enabled, including: Procedures Procedures Loops Loops Individual functions Individual functions Other features including an option to print messages to Serial instead of printing to LCD Other features including an option to print messages to Serial instead of printing to LCD

ERROR CODES Vincent defined termination point error messages Vincent defined termination point error messages TERMINATED AT: TERMINATED AT: SETUP SETUP CONTROLLER CALIBRATION CONTROLLER CALIBRATION POWER SUPPLY TEST POWER SUPPLY TEST CONTROLLER TEST CONTROLLER TEST ASSEMBLED UNIT TEST ASSEMBLED UNIT TEST PROCEDURE NOT FOUND PROCEDURE NOT FOUND Error Reasons defined as well ERROR: 24 V NOT FUNCTIONAL NO VOLTAGE AT OUTPUT CALIBRATION DATA DOES NOT MATCH OUTPUT VOLTAGE NOT WITHIN 10% OF 55 V AT NO LOAD OUTPUT VOLTAGE NOT WITHIN 10% OF 55 V AT FULL LOAD HIGH VOLTAGE AND CURRENT OUTPUT NOT WITHIN TOLERANCE 24 VOLTAGE OUTPUT WITH NO LOAD NOT WITHIN TOLERANCE 24 VOLTAGE OUTPUT WITH FULL LOAD NOT WITHINT TOLERANCE ERROR OR NO REPLY FROM CONTROLLER NO SD CARD INSERTED SD CARD UNREADBLE INVALID BARCODE SCAN FAILED – RESCAN NO RECORD EXISTS RTC FAILURE ENCLOSURE OVERHEATED CLOSE LID FOR TEST WARNING WARNING EMERGENCY STOP

RS-232 TESTING Tested Converter Tested Converter Connected to terminal Connected to terminal Receiving & sending commands Receiving & sending commands PLANNED TO PERFORM ITEMS BELOW PLANNED TO PERFORM ITEMS BELOW Sent simple commands to controller board Sent simple commands to controller board Unlock code Unlock code Voltage & current settings Voltage & current settings Enable & disable commands Enable & disable commands Ensured commands are measuring correct output Ensured commands are measuring correct output

IMAGINE RIT PROGRESS Poster Progress Poster Progress Reformatted and cleaned up Reformatted and cleaned up Waiting on finished product picture and testing results to finish – 80% done Waiting on finished product picture and testing results to finish – 80% done Paper Progress Paper Progress Paper about 80% complete Paper about 80% complete Results Results Conclusion Conclusion

PROBLEM TRACKING

REST OF THE SEMESTER…