Newport Beach City Council Meeting January 22, 2013 Agenda Item No. 16.

Slides:



Advertisements
Similar presentations
FAA Project - Bidding Phase FAA Recommends.. Consider how you would like to bid the project early on in the design. Due to possible budget constraints.
Advertisements

Planning & Community Development Department Scott Fazekas & Associates Inc. Contract Amendment for Building Plan Review City Council Meeting April 28,
Pasadena Water and Power Contract with R C Foster Corporation to Provide Seismic Upgrades to Sheldon Reservoirs 1 and 2 City Council March 12, 2012.
Construction Cost Estimating Class #2: Bidding Process Prof. Ralph V. Locurcio, PE.
1 Wastewater Capital Improvement Program (CIP) Large Users Meeting March 15, 2010.
Bids ranged from $992,264 to $1,999,305 JO-SH General Engineering was apparent low bidder Lash Construction 2 nd $1,156,453 Construction to start.
Additive Alternates on ODOT let Projects -A discussion- Joe Anthony Supervisor, Construction Cost Section Office of Estimating.
AWARD OF CONTRACT FOR CONSTRUCTION OF MASTER DRAINAGE FACILITY LINES D & D1 CIP NO City Council Meeting December 20, 2011.
Marcy Mealy Procurement Specialist CDBG Program
Westbrook Village Verdict Storm Drainage & Waterline Improvements Contract Amendment for GMP No.1 Pulice Construction, Inc. ITEM 10C April 21, 2009.
STATE ROAD 100 CORRIDOR COMMUNITY REDEVELOPMENT AGENCY Bulldog Drive Improvements Right-of-Way and Design September 21, 2010 Presentation for SR 100 CRA.
David McGiven FAC: Construction April 2006 Facility Advisory Committee (FAC) Construction Procurement David.
Environmental Assessment Public Information Meeting – September 2010 Realignment of a Portion of a Utah Lake Drainage Basin Water Delivery System (ULS)
Pasadena Water and Power Department INCREASE CONTRACT 20,013 WITH VCI TELCOM FOR CONSTRUCTION OF UNDERGROUND SYSTEM IN LOS ROBLES BY $300,000 August 9,
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
March 9, 2011 Report on Construct & Equip Wells (Moniter, 6400 South, 1330 East)
Planning Department Zoning Code Amendment: Change Hearing Body from Hearing Officer to Planning Commission for Major Projects over 75,000 square feet City.
Aerojet Environmental Update Carmichael Town Hall Meeting March 12, 2008 Michael Girard Aerojet Environmental Site Remediation (916)
Signal Optimization Study Community Development Department.
AWARD OF CONTRACT FOR CONSTRUCTION OF CALIFORNIA OAKS ROAD AT I-15 INTERCHANGE CIP NO City Council Meeting January 18, 2011.
City of Palm Coast, Florida City Council Meeting October 2, 2012.
Wastewater Treatment Plant # 2 Engineering Services Council Workshop July 8, 2014.
February’s Accomplishments Met extensively with FTA staff and received the Record of Decision from FTA Finalized Negotiations with the top ranked Design.
Municipal Assistance Bureau Recommended Bid Analysis Procedures June 24, 2014.
Project Goals o Meet Strategic Action Plan Performance Measure Strategy 4.1.1: Utilize nature’s water supply resources effectively for water supply o.
Department of Public Works FY Capital Improvement Program (CIP) Budget Adoption April 27, 2015.
1 MnDOT Metro District Proposed Transportation Improvement Program (TIP) Amendment Metropolitan Council January 17, 2007.
C-4 Canal Bank Improvements Belen Phase 2 Flood Protection Berm & Wall John Mitnik, P.E. Engineering & Construction Bureau Chief John Mitnik, P.E. Engineering.
PA-1 Surface Water Control Structure Replacement Final Payment.
TOWN OF EDENTON NEW POLICE DEPARTMENT.
OTC Pres: Bid & Award Phase 4 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Eryca McCartin, Office.
Belle Terre Parkway ITB-CP Bidding and Contracting Presentation for the CITY OF PALM COAST January 8, 2008 Prepared by CPH ENGINEERS, INC.
Item 6b. Project Vicinity Park Ave Bridge Existing Park Avenue Bridge.
Hurricane Ike Recovery Projects CDBG Funding Galveston City Council Workshop  Sept. 17, 2015.
EASTERN MUNICIPAL WATER DISTRICT County Water Company Consolidation Project Greg Kowalski, P.E. Senior Civil Engineer April 1, EXHIBIT.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Recycled Water Pipeline Joe Mouawad Sr. Director of Engineering September 2, 2015.
Wastewater Treatment Plant No. 2 Construction Contract City Council Workshop February 9, 2016.
SEWER TRUNK LINE REHABILITATION PROJECT (Alexandria Place, Black Oak and Navy Drive) COUNCIL AGENDA ITEM 14.1.
1 EASTERN MUNICIPAL WATER DISTRICT Cactus II Feeder Transmission Pipeline Joe Mouawad, PE Sr. Director of Engineering September 2, 2015.
Las Cruces International Airport RESOLUTION A: A RESOLUTION APPROVING THE AWARD OF A CONTRACT FOR DESIGN THROUGH BIDDING PHASE SERVICES FOR AN.
1 Department of Public Works 08/09 Capital Improvement Program City of Newport Beach.
WATER SYSTEM WORKSHOP February 27, 2012
Approve Change Order No. 4 for the Caylor Wholesale Meter Modification Item 4B.
Avondale City Center & American Sports Centers Amendment No. 2 Sports Facility Construction City Council January 4, 2010.
Pier Partial GMP Proposal for Marine Structural June 1, 2017
Reject all bids for Citywide Tree Trimming Services and authorize increases to Contracts No. 21,628 and No. 21,629 with George Salinas Tree Preservation,
January 18, 2017 City of San Diego
Authorization to Enter Into Contract with Four Consultants for General Plan Implementation Services City Council February 6, 2017.
Stockton Event Center Audit Recommendations and City Response
Sun City Lift Station Odor Control Improvements
City of San Jacinto 7th Street Pavement Repairs
Light Rail Transit Project
Robinson Park Recreation Center Renovation
Quail Valley Subarea 9, Phase 1 Sewer Award of Construction Contracts
Well 38 Drilling & Testing Amendment
Audie Murphy Road Sewage Lift Station Award of Construction Contracts
Case Road Sewer Joe Mouawad, P.E. October 27, 2016.
OMI - THAMES WATER, INC ANNUAL SETTLEMENT STATEMENT CONTRACT YEAR 3
107th & 110th Avenue North Public Utilities Renewal Projects
Adoption of the FY Capital Improvement Program Budget & Amendments to FY 17 CIP May 8, 2017.
Memorandum of Understanding with GE Osmonics, Inc
College II Tank Interior Recoating Award of Construction Contracts
Reach 4 Air Valve Replacements Award of Construction Contracts
AUTHORIZE AN INCREASE TO THE CITYWIDE CONTRACT WITH OFFICE DEPOT, INC
Procurement.
AUTHORIZATION TO ENTER INTO A PURCHASE ORDER CONTRACT WITH ONESOURCE DISTRIBUTORS TO FURNISH AND DELIVER ELECTRIC UTILITY PARTS AND MATERIALS August 28,
Gunnerson Street Safety Project
Meadow Lake Boulevard Street Extension Project
Delta Water Supply Project
Contract Award for the Colorado Street Bridge Suicide Mitigation Enhancements Project City Council May 20, 2019 Item # 7.
Presentation transcript:

Newport Beach City Council Meeting January 22, 2013 Agenda Item No. 16

Background Water Master Plan identified the need for new water transmission main from Big Canyon Reservoir to Corona del Mar area. Reasons for new pipeline: Improve supply pressure Increase fire flows Provide pipeline redundancy Improve operation and service reliability

Aerial showing pipeline alignment

Pipeline Alignment 30-inch transmission main: Pacific View Drive: POC to San Miguel Drive San Miguel Drive: Pacific View Dr. to MacArthur Blvd. MacArthur Blvd.: San Miguel Dr. to East Coast Hwy. 24-inch transmission main: East Coast Hwy.: MacArthur Blvd. to Fernleaf Ave. Carnation Ave.: East Coast Hwy. to Bayside Dr. Jack and Bore under East Coast Hwy. at Carnation Ave. 16-inch transmission main: Dahlia Ave.: East Coast Hwy. to 5 th Ave. 5 th Ave.: Dahlia Ave. to Fernleaf Ave. Relocate Pressure Regulator structure at East Coast Hwy. and Dahlia Ave.

SAN MIGUEL DRIVE

MACARTHUR BOULEVARD

MACARTHUR BOULEVARD AND EAST COAST HIGHWAY

CARNATION AVENUE

Typical Type of Pipe

Project Schedule Award Contract January 22, 2013 Contractor Preparation/pipe orderJan – April 2013 Construction StartApril/May 2013 Construction CompleteSummer 2014 Traffic Handling Plans include construction in multiple stages to avoid disrupting traffic as much as possible.

Bid Results Opened bids on January 10, 2013 at 10:00 AM Total of 11 bids received Lowest four Bids as follows: T.E. Roberts, Inc.$4,402, Vido Artukovich and Sons, Inc.$4,624, CCL Contracting, Inc.$4,877, GRFCO, Inc.$4,938, Engineers Est. (Psomas and Assoc.)$4,373,000.00

Bid Protest Received bid protest from Vido Artukovich and Sons, Inc. on January 16, 2013 Reasons given for protest: Low bid is unbalanced Low bidder does not possess necessary experience Staff checked low bidder’s references and does not consider low bid unbalanced Staff reviewed bid protest with City Attorney’s office and does not recommend declaring low bidder non- responsive and not a responsible bid.

Recommendations Approve project plans and specifications Award contract for Corona del Mar Water Transmission Pipeline Improvements – Contract No to low bidder T.E. Roberts, Inc. for total bid price of $4,402, Establish contingency amount of $440, (10%) Approve Budget Amendment appropriating $973, from Water Enterprise Fund to CdM Transmission Main CIP Account.

Public Works Department A Well-Engineered Machine Protecting and Providing Quality Public Improvements and Services