Transmission Access Workshop 8 March 2012. Workshop agenda 1.Introduction 2.Allocative Efficiency - initial allocation ● Is the length of property right.

Slides:



Advertisements
Similar presentations
GAMBIA COMPETITION COMMISSION GAMBIA COMPETITION COMMISSION Levelling the Field for Development BY : EXECUTIVE SECRETARY 5 TH JUNE 2013.
Advertisements

Cross-Border Infrastructure: A Toolkit Tariff and Rate Setting Session on Regulation & Accountability Max Bradford Castalia The views expressed here are.
North / North West Region Regional Gas Initiative Regulatory Co-ordination Workshop 8 th February 2007.
A 2030 framework for climate and energy policies Energy.
European Commission Slot allocation at Community airports Infrastructures and Airports Unit Klaas Pel.
The work of European energy regulators on generation adequacy FTS-CEER workshop on Regulatory Aspects of Power Capacity Markets 7 February 2012.
Pamela Taylor, Ofgem Gas Target Model, 3 rd stakeholder workshop 11 th April 2011, London Connecting markets.
7 th IG meeting, South Gas Regional Initiative Madrid, 10 th July 2008 Consultation on Requirements for Gas Interconnection Capacity between Spain and.
Transmission; Foundation of a Power Market 12 May 2006.
North American Natural Gas Infrastructure Needs Donald F. Santa, Jr. President Interstate Natural Gas Association of America The Independent Petroleum.
A Primer on Electric Utilities, Deregulation, and Restructuring of U.S. Electricity Markets W.M. Warwick July 2000 Revised May 2002.
Towards Regional Independent Operators – a main driver for successful market integration.
Ranci Highways Nov.261 Highways: Cost and Regulation in Europe Università degli studi di Bergamo November 26 th -27 th, 2004 Applying a Price Cap: RAB.
Markus Krug, Co-Chair CEER Workstream 20 th Madrid Forum 26 September 2011 Harmonised transmission tariff structures Framework Guideline.
1 The Regulatory Approach to Fostering Investment David Halldearn Ofgem 28 September 2006.
Energy Risk Management – 3 October 2006 Increasing interactions with global energy markets - the impact on the GB gas market Jo Witters Wholesale Markets,
Capacity trade and transfer mechanism and the next AMSEC auction Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 9 May 2007.
RENEWABLE ENERY & BIOMASS COGENERATION TRAINING – KENYA BY LEWIS B. MHANGO.
Achieving a sound investment climate – the role of regulators Boaz Moselle Joint-Chair, CEER Gas Working Group Managing Director – Corporate Strategy Ofgem.
National Petroleum Council Study Balancing Natural Gas Policy: Fueling the Demands of a Growing Economy September 2003.
Investment in Gas Infrastructure A regulator´s view Nina GRALL Seminar on Gas Industry Restructuring in SEE 4/5th October 2005, Belgrade.
PETROLEUM PIPELINES BILL MANNY SINGH Director : Petroleum Policy Department of Minerals and Energy 9 TH June 2003 Presentation to the NCOP.
ENERGY REGULATORY AND MARKET DEVELOPMENT FORUM November 4, 2010 The Honorable Philip D. Moeller Commissioner Federal Energy Regulatory Commission “ENERGY.
The 3rd package for the internal energy market Key proposals EUROPEAN COMMISSION Heinz Hilbrecht Directorate C - Security of supply and energy markets.
2014 Reports to the Minister Markets Team Ken Michael Room, 25 September 2014 Ensuring quality services for a reasonable price 1 Workshop.
Review Group 291 – Balancing Arrangements Default Cashout Workshop 3 – 21 st June 2010.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Directorate General for Energy and Transport European Commission Directorate General for Energy and Transport Regulation of electricity markets in the.
Natural Gas – Some Regulatory Issues Oil & Gas Industry Practice.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
Economic Environment of Business Privatisation and Deregulation: The case for and against.
The Operation of the Electricity Markets Brent Layton Talk at EMA Central Electricity Forum 6 th April 2006.
Commission For Energy Regulation Padraig Fleming Manager, Distribution & Retail 22 nd July 2004.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
The Eurasian Electricity Market – Ideas for Intergovernmental Co-Operation/Waern1 -The Eurasian Electricity Market - Ideas for Intergovernmental Co-Operation?
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Energy Market Issues for Biomethane Projects Workshop - 31 October 2011 RIIO-GD1 Environmental Incentives.
Review Group -140 Thoughts on additional information requirements.
Gas Regional Initiative W orkstream regulatory co-ordination, subfocus investment Workshops Bonn, 8 February 2007 Draft 2.
Briefing for financial market analysts 30 April 2013 Draft report on the effectiveness of information disclosure regulation at Auckland Airport.
BIDDER’S CONFERENCE: Eskom Grid Connection Process and related matters Date: 16 August 2012.
Gas storage: GB experience and future trends Sonia Brown Director, European Strategy and Environment GSE Conference - May 2007.
Gas Transmission and Capacity Pricing Workshop 11 April 2013.
Gas Transit Workshop Brussels, 24th January 2007 Milan Sedlacek, SPP - preprava, Slovak Republic Gas transit regulation ( Slovakia as a country with standard.
Work Plan and Key Deliverables 2 November WORK PLAN.
Workshop on transportation routes Region South-South East 24th November 2006, Vienna.
Brussels NETWORK USERS WORKSHOP Brussels – 15 Nov TRANSMISSION TARIFFS Bernard Brelle, Vice-President, Gas Transmission Europe.
Role of Financial Markets and Institutions
The Role of TSO. Madrid, 7-8 Feb The Role of TSO2 The roles of industry players First vision of role of TSO in GTE position paper Industry players.
System Operator information transparency. As Transmission System Transporter National Grid Gas undertakes responsibility for safe, effective and efficient.
Nominations James Mellsop Director 4 December 2012 Presentation to PEA.
ГММ -1( а ) Li Jianfei. By 2040, the world and, in particular, countries which have large and technologically advanced economies – such as the USA,
Gas Transmission Charging Review: Final Capacity Charging Proposal Gas TCMF 14 th December 2006.
Review of the Market Reform report Presentation to PEA Wellington 2 November 2012 James Mellsop Director.
Gas Transmission and Capacity Pricing Workshop - Introduction 11 April 2013.
Details of demand management options
Congestion Management
The 3rd package for the internal energy market
Development of an Integrated Energy Market in Saudi Arabia
Draft for factual comments, suggestions on overlaps welcome.
Gas Transmission Europe
Workshop on transportation routes Region South-South East
Background and Process
Capacity Allocation Mechanisms
The work of European energy regulators on generation adequacy
An action-based way forward
Meinhard Janssen GIE Board Member
EUROGAS LNG TASK FORCE Bilbao, 13 March 2009 Presentation by
Options for structuring DM arrangements
Presentation transcript:

Transmission Access Workshop 8 March 2012

Workshop agenda 1.Introduction 2.Allocative Efficiency - initial allocation ● Is the length of property right appropriate? ● Are there any other concerns with the definition of capacity rights? ● How could the capacity request process be improved? ● Could the posted prices somehow be a bit more dynamic? ● Is there any issue with the price structure (e.g., CRF versus TPF)? ● Are there any concerns with the definition of capacity rights? ● What would happen if the grandfathering rights were taken away, e.g., if the capacity rights were just for one year? ● What are Vector’s incentives when it comes to setting capacity?

Workshop agenda 3.Allocative Efficiency - secondary allocation ● What are the impediments to trading? ● Would an ability to subdivide capacity rights (e.g., by time) assist in facilitating trading? ● Do shippers have incentives to strategically hoard? ● What are Vector’s incentives regarding secondary trading? 4.Allocative Efficiency - interruptibility ● What proportion of contracts are currently interruptible? ● How is the price for an interruptible contract determined?

Workshop agenda 5.Dynamic Efficiency – assuming away price control ● How are the existing prices determined? ● Other than regulation, are there impediments to putting in place some sort of mechanism that would allow price to rise as capacity is reached? ● Is a long-term contract with a shipper a necessary condition to investing in new capacity? ● How likely is it that an investor other than Vector would build a pipeline?

Workshop agenda 6.Dynamic Efficiency – impact of regulation ● Price control would skew the price profile expected in a competitive market. While the constraint on rents in the pre-investment phase would discourage investment, could the “above-market” prices in the post-investment phase encourage investment? ● Does the Commerce Commission correctly account for risk in its cost of capital methodology?

ADDITIONAL SLIDES THAT MAY BE HELPFUL DURING WORKSHOP

Basic forms of access Type of access arrangement Main points of note entry-exitAllocates capacity at entry and exit points selected (independently) Point specific tariffs Mandated for Europe point to pointAllocates capacity for transportation route selected Distance related tariffs Applies in US postage stampAllocates capacity within a zone Single tariff per zone Rumania, Hungary, Ghana

Prospects for capacity trading (devil’s advocate view) Capacity (as currently defined) may not trade because: 1.The maximum liquidity of the market is small: ● Capacity is a daily point to point product (dPtoP), so the market is limited to shippers using that route i.e. 6 or 7 in Auckland, 3 or 4 in Whangarei 2.Liquidity when capacity is scarce is much smaller: ● Retailers will wish to serve their own market, not help competitors 3.Liquidity for term capacity will be smaller still: ● Retailers wish to obtain capacity to match the term of their customer contracts. These will be at least a year, so will traverse periods when capacity is scarce

Prospects for capacity trading (devil’s advocate view)… continued Capacity (as currently defined) may not trade because: 4.Retailers holding scarce capacity can more easily extract rent from their customers in the retail market, rather than from their competitors in the capacity market…. So why bother to trade? 5.If capacity trading is not a frequent event, the unit costs will be high… So why bother to trade? Conclusion: The concept of secondary market trading is flawed… better to concentrate on improving the primary market

Primary market prices Pricing efficiency (s 3.5, 2009 Research Paper): Capacity prices will promote allocative efficiency… if they reflect the marginal cost of capacity provision. The marginal cost has two components: the marginal cost of expansion (MCE) the variable cost of employing existing capacity (compressor fuel, odorant etc.) So efficient prices should be structured by applying: the MCE at times of peak pipeline demand the variable cost at all times

Primary market prices… continued PipelineDelivery PointDescription of Expansion Cost ($m) Inc TJ MCE 1 CRF ($/GJ/yr) North WestfieldPap East to Smales Rd loop WhangareiPap East to Smales Rd loop Central NorthMorrinsvilleHorotiu compression Bay of Plenty Kinleithupgrade Pokuru compressor Gisborneupgrade Pokuru compressor South Tawaupgrade Kaitoke, loop to Hima Hastingsupgrade Kaitoke, loop to Hima Table 7 of 2009 Research Paper - using Vector’s capacity disclosure information to estimate Marginal Costs of Expansion (MCE) and comparing this to current Capacity Reservation Fees (CRF) 1.

Gas Industry Co Transmission market trends ● Open access ● Structural separation of transmission ● Transparency ● Private ownership ● Regulatory objective: efficiency/competition ● Clear definition/allocation of regulatory roles