How Microsoft/DevDiv uses TFS 報告人:張嘉琪 日期: 2008/9/15.

Slides:



Advertisements
Similar presentations
Intraday conclusions of NWE IG 9 May. Short term way forward (phase 1) PXs and TSOs confirmed commitment to 2012 intraday project based on ELBAS solution.
Advertisements

Test practice Multiplication. Multiplication 9x2.
Chapter 6 Process Synchronization Bernard Chen Spring 2007.
ESEA Waiver Update. 1. Extend our current ESEA Waiver another year. 2. Respond to our current conditional “high risk” status. 3. Respond to our Fall 2013.
HTB / YB SAFETY & QUALITY CERTIFICATIONS PROCESS TO CERTIFICATION AND IT’S IMPACT ON SAFETY CULTURE & SAFETY PERFORMANCE VICE PRESIDENT OF MARITIME OPERATIONS.
Roger Boesch Technology Solution Professional - Visual Studio Team System blogs.msdn.com/rogerboesch Microsoft Schweiz GmbH.
1 Test Planning CSSE 376, Software Quality Assurance Rose-Hulman Institute of Technology March 9, 2007.
Outline the Main Features of the Strategy Implemented by the Burton Group From 1981 to 1985 Control orientation Selective market segment targeting Prudent.
Chapter 6 Math Review 5 th Grade May Mean 1.Set of numbers (a, b, ….., z) 2.Find the sum of all the numbers in the set. a+b+….+z= Total 3. Count.
Chapter 5 The Qualitative Research Approach. THE INTERPRETIVE WAY OF THINKING  Multiple Realities  Data vs. Information  Subjects vs. Research Participants.
7/6/2015 Orthogonal Functions Chapter /6/2015 Orthogonal Functions Chapter 7 2.
Test Reporting Best Practices By Gabriel Rodriguez.
| Basel Verwalten von Deployments und Release Management – mit dem TFS 2013 ganz einfach! Hansjörg Scherer ALM Spezialist Microsoft
TEAM FOUNDATION SERVER (TFS) By Sunny Niranjana Devi. M.
07 – Project Management Software
Empowering Business Dhan (Co-Founder)
IT Project Management Cheng Li, Ph.D. August 2003.
DELIVERON CONSULTING SERVICES Getting Agile with Team Foundation Server 2010.
Planning and Tracking Projects with VSTS 2010 By Ahmed Nasr 1.
Outline Strategic planning The marketing plan The advertising plan The creative plan and copy strategy Chapter 7 Advertising Planning and Strategy.
Guide to the TDM online system
Project Plan Semester Two Ernie Costa Michael Daniels Lindsay Graham Erik Olson Dion St. Hilaire.
We make online training easy Get real-time reporting In this demo, you’ll learn how we can help you: Invite trainees to your course Add quizzes and surveys.
TFS 2010 What’s new and interesting. Key Items Agile Planning Tools – Slides #3-#6 Improved parallel development - Slides #7-#8 Continuous Integration.
System Overview & Demonstration Conan: Rescue The Princess Presented To: Initech Presented By: OutSource Inc.
Title of Thesis Name of Student Year under review / Research Degree / Mode of Study (e.g. 2 nd Year PhD Full Time)
CHAPTER 06: FRAME Tharith Sriv. Chapter Outline  What are frames?  Using Frames: Guidelines and Drawbacks.  The tag.  The ​​ tag.  The tag.  Creating.
Gas Line Rover Noah Baker Douglas Maxey Ken Mentasti N. Alex Scott Matthew Stewart BP Gas Line Rover 1/ 27/ 04 British Petroleum Brandon McNerlin.
Team Foundation Server Overview. Team Foundation Server  Where did it come from?  MS Delta  MS SourceSafe.
Multiplication Facts. 9 6 x 4 = 24 5 x 9 = 45 9 x 6 = 54.
Markerless Augmented Reality Platform Design and Verification of Tracking Technologies Author:J.M. Zhong Date: Speaker:Sian-Lin Hong.
Iterators (short version) Chapter 15 Copyright ©2012 by Pearson Education, Inc. All rights reserved.
XYZCS Designing Binary Adders with decoders C(X,Y,Z) =  m(3,5,6,7) S(X,Y,Z) = S m(1,2,4,7);
CHAPTER 7 – Managing Project Schedules. “Plan the Work” “Work the Plan” “Endorse the Plan” + 10% of Project effort + 90% of Project effort “Align the.
What is policy surveillance? What are the methods? Why is it important? November 2015.
The READY Accountability Report: Growth and Performance of North Carolina Public Schools State Board of Education November 7, 2013.
Multiplication Facts. 2x2 4 8x2 16 4x2 8 3x3.
Multiplication Facts Review: x 1 = 1 10 x 8 =
Doc.: IEEE /0617r0 Submission May 2014 Laurent Cariou (Orange)Slide 1 Discussion on timeline for ax Date: Authors:
Human features are those things created by man.
Multiplication Find the missing value x __ = 32.
DCIT Document Hierarchy End-to-End Procedures and operational system features effecting multiple organizations Systems Integration Document Detailed system.
Multiplication Facts All Facts. 0 x 1 2 x 1 10 x 5.
Windows 7 Ultimate To Load Click Simulation PPSX
CHAPTER 25 - Distributed Databases and Client–Server Architectures
Double and Multiple Sampling Plan
Project Methodologies and Processes
Multiplication Facts.
Solving Linear Equations and Inequalities
Chapter 5 Flowcharting ACCOUNTING INFORMATION SYSTEMS
Multiplication table. x
Multiplication Facts.
Surveillance. Public Health Approach Surveillance What is the Problem ? Problem Risk Factor Identification : What Is the Cause ? Intervention Evaluation.
Chapter 15 Planning for Material and Resource Requirements
بعض النقاط التي تؤخذ في الحسبان عند تقييم الاستثمارات الزراعية
Chapter 1: Introduction
Orientation Local impact research (project A)
“WAR ROOM” CONCEPT Purpose: Post on the Walls: Use for: Need:
Electric Circuits RL Circuits
Managing the safety of your road network
Multiplication Facts.
Sections 1-3: Standard Section 4: Math
Discussion on timeline for ax
Double and Multiple Sampling Plan
4534 RGMA Validation Update
Consumer Issues Chapter 2 Review for test
Map of LAGs in your country
[INSERT ORGANISATION NAME] PROJECT MANAGEMENT LIFECYCLE
Presentation transcript:

How Microsoft/DevDiv uses TFS 報告人:張嘉琪 日期: 2008/9/15

Reference efault.aspx

Outline Chapter 1 (Our Process) Chapter 2 (Feature Crews) Chapter 3 (Implementing the Process) Chapter 4 Chapter 5 (Tracking Progress) Chapter 6 (Tracking multiple projects) Chapter 7 (Tracking Risk) Chapter 8 (Tracking Quality Gates) Chapter 9 (Transparency in Reporting) Conclusion

Chapter 1 (Our Process) Planning Work

Chapter 1 (Our Process)

Chapter 2 (Feature Crews)

Chapter 3 (Implementing the Process) The Value Proposition work item

Chapter 3 (Implementing the Process) The Experience work item

Chapter 3 (Implementing the Process) The Feature work item

Chapter 4

Chapter 5 (Tracking Progress)

Chapter 6 (Tracking multiple projects)

Chapter 7 (Tracking Risk)

Chapter 8 (Tracking Quality Gates)

Chapter 9 (Transparency in Reporting)

Conclusion 定義完整流程以便管理專案 透過各式報表追蹤專案進度與分析專案情 況