Presented to: REDAC By: Navneet Garg, Ph.D. Date: March 15, 2016 Federal Aviation Administration RPA P2: National Airport Pavement & Materials Research.

Slides:



Advertisements
Similar presentations
Rapid Implementation of Warm Mix Asphalt in Minnesota Tim Clyne MnDOT 16th Annual TERRA Pavement Conference February 9, 2012.
Advertisements

Construction and Testing of Construction Cycle 2 (CC2) Overlay Murphy Flynn FAA Airport Technology R&D Branch, AAR-410 William J. Hughes Technical Center,
Aspects of Current MLS APT Activities in southern Africa Fred Hugo Road Pavement Forum 7 November 2006.
O’Hare Modernization Project Reflective Cracking and Improved Performance of Grooved Asphalt July 20 th, 2006 Research Overview Hyunwook Kim, Research.
Binder Characterizations for High Tire Pressure Project 04/26/2012 Injun Song Injun Song, Ph.D., P. E. SRA International, Inc. Federal Aviation Administration.
Update on VDOT’s Asphalt Research Activities 2014 VDOT Asphalt Seminars February & March,
Imad Al-Qadi, University of Illinois at Urbana-Champaign Enad Mahmoud, Bradley University
John A. D’Angelo US Federal Highway Administration CUPGA 2008 Saskatoon, Saskatchewan.
Full-Depth Reclamation Using a Cement Slurry Spreader Attached to a Ready Mixed Concrete Truck W. Spencer Guthrie, Ph.D., Associate Professor Charles A.
US Army Corps of Engineers BUILDING STRONG ® US Army Corps of Engineers BUILDING STRONG ® Airfields and Pavements Research Overview J. Kent Newman, Phd.
Presented to: FAA Airport Pavement Working Group By: Murphy Flynn Date: April 24, 2012 Federal Aviation Administration Construction Update.
Construction of LLP HMA Pavements Pre-bid Meeting Solano 80; 04-4A0104 District 4 Oakland, CA September 14, 2012 Bob Humer.
WMA TWG December NCAT WMA Research 2007 Andrea Kvasnak.
In Tai Kim & Erol Tutumluer University of Illinois, Urbana-Champaign
High Recycle with WMA Fatigue Cracking Experiment AFD40(2) - April 11, 2013 Nelson Gibson, Ph.D., P.E. FHWA Office of Infrastructure R&D.
AAPTP UPDATE March AAPTP Background Program began 2004 Cooperative Agreement Auburn University Contractor Projects are awarded as subcontract.
PRACTICAL AIRPORT PAVEMENT M&R MANAGEMENT Y. Hachiya & M. Kanno Service Center of Port Engineering Tokyo, JAPAN 1 FAA Airport Pavement Working Group Meeting.
Presented to: Airport Pavement Working Group By: Jeff Gagnon, P.E. Manager ANG-E262 Date: April 24, 2012 Federal Aviation Administration FAA Airport Pavement.
New Technologies Land on Airport Pavements Rocky Mountain Asphalt Conference February 18-20, 2009.
Presented at: FAA Working Group Meeting Atlantic City, NJ By: Navneet Garg Date:April 24, 2012 Federal Aviation Administration High Temperature Pavement.
Activities as Turner-Fairbank Highway Research Center Jack Youtcheff Materials & Construction Team Federal Highway Administration
Planning for the 2012 Research Cycle National Center for Asphalt Technology.
Warm Mix for a Cold Climate Colorado DOT’s 2007 WMA Project.
Bituminous Stabilized Materials Guideline Project Initiated By: Gautrans Sabita.
Characterization of Alaskan Hot-Mix Asphalt containing RAP
Pavement Maintenance II
Warm Mix for a Cold Climate Update on Colorado DOT’s 2007 WMA Project on I Rocky Mountain Asphalt Conference and Equipment Show.
World of Asphalt Pavements Feedback Sydney Stephen Emery.
 Materials – Highest & Best Use  Public Health  Safety  The Environment  Safety  Reliability  Performance  Flexibility  Productivity Improve Mobility.
AAPA 2010 Study Tour – Accelerated Pavement Testing & Equipment Observations and Recommendations Accelerated Pavement Testing & Equipment.
RSA Design Guidelines for hot-mix asphalt TRH3/HMA Workshop June 2001.
Research Findings from the NCAT Test Track APAI Winter Conference Indianapolis, December 14, 2010.
Presented to: 2012 FAA Airport Pavement Working Group Meeting By: Al Larkin, Qingge Jia, FAA Airport Technology R & D, and Jason Tarby, SRA Date: April.
Accelerated loading test results of two NCAT sections with highly modified asphalt Erik J. Scholten – Kraton Innovation Center Amsterdam David H. Timm.
Asphalt Institute Research Update FAA Airport Pavement Working Group Meeting April 26, 2012.
Presented to: By: Date: Federal Aviation Administration National Airport Pavement Test Facility Update Airport Pavement Working Group Don Barbagallo April.
1 Reclaimed Asphalt Pavement in Arizona - Application and Verification October 3, 2008 Arizona Association of County Engineers.
AIRFIELD PAVEMENT PERFORMANCE ISSUES AND RESEARCH NEEDS - AN AIRPORT OPERATOR’S PERSPECTIVE FAA AIRPORT PAVEMENT WORKING GROUP MEETING APRIL 25, 2012.
Development of An Advance Overlay Design System Incorporating Both Rutting and Reflection Cracking Requirements Rick Collins TxDOT.
Stone Matrix Asphalt (SMA) for Airfield Pavements 2010 FAA Worldwide Airport Technology Transfer Conference Brian Prowell Don Watson Graham Hurley Ray.
HIGH TIRE PRESSURE AND TEMPERATURE EFFECTS ON HOT MIX ASPHALT CONCRETE PERMANENT DEFORMATION USING CUSTOMIZED ASPHALT PAVEMENT ANALYZER April 22, 2010.
Ultra Thin Bonded Wearing Coarse Sponsored by: Minnesota LTAP Center Presented by: Michael Marti, P.E. SRF Consulting Group, Inc. Dan Wegman, P.E. SemMaterials.
Harold L. Von Quintus, P.E., ARA Jagannath Mallela, ARA
STH 21 Adams County Project # Project Specifics Project Specifics Asphaltic Pavement Milling Asphaltic Pavement Milling Pulverizing Shoulders.
AAR-410 February 2, Alpha Factor Determination for 6-Wheel Gears u Gordon Hayhoe, AAR-410, FAA William J. Hughes Technical Center, Atlantic City,
Presented to: FAA Airport Pavement Working Group Meeting By: David R. Brill, P.E., Ph.D. Date: April 24, 2012 Federal Aviation Administration Update on.
Presented to: By: Date: Federal Aviation Administration Pavement Projects and Plans ANG-E262 REDAC Jeff Gagnon March 15, 2016.
At Auburn University National Center for Asphalt Technology Accelerated Pavement Testing Facilities “APT”
Presented to: REDAC By: Navneet Garg, Ph.D. Date: March 15, 2016 Date: March 15, 2016 Federal Aviation Administration Full-Scale Testing – Perpetual Pavement.
European Asphalt Pavement Warranties Scan
NCAT Pavement Test Track
Thin Hot Mix Asphalt Overlays PennDOT Research Findings
APT IA - FAA UPDATE.
Haritha Musty and Mustaque Hossain Kansas State University MATERIALS
Rongzong Wu, David Jones and John T. Harvey
Phase I Experiment 4 Different pavement structures, 8 sections Compare
Research Implementation WHRP Flexible Group
MLS User Group feedback TRB2017
Permanent Deformation Characterization of Asphalt Mixtures Using Minimum Strain Rate, LVECD Program, and Triaxial Stress Sweep Test Authors: Dahae Kim,
Update on the current APT Project in Texas
2018 Pavement Workshop May 23-24, 2018
Performance Assessment of 100% Recycled Hot Mix Asphalt
Development of An Advance Overlay Design System Incorporating Both Rutting and Reflection Cracking Requirements Rick Collins TxDOT.
Dr. Randy West, P.E. Director / Research Professor
Effect of Recovered Binder From Recycled Shingles
AASHTOWare Pavement-ME Design Software: Materials Library
Colorado State University
Field Performance of Foaming Warm Mix Asphalt Pavement
High performance asphalt and binders Part 2
High performance asphalt and binders Part 1
Presentation transcript:

Presented to: REDAC By: Navneet Garg, Ph.D. Date: March 15, 2016 Federal Aviation Administration RPA P2: National Airport Pavement & Materials Research Center (NAPMRC)

2 Federal Aviation Administration RPA P2 – NAPMRC March 15, 2016 RPA P2 Overview - NAPMRC FY 2016 Accomplishments Research Goals Funding Requirements Research Goals More durable, long-lived airport pavements, reduced lifecycle costs, better prediction of pavement service life, and accurate assessment of aircraft-pavement compatibility Deliverables Technical Reports, technical papers. Complete traffic tests on Test Cycle – 1 (TC-1) by end of FY2016. Milestones √ - Complete tests on HMA at 214-psi tire pressure √ √ - Complete tests on WMA at 214-psi tire pressure √ - Complete tests on HMA at 254-psi tire pressure - Complete tests on WMA at 254-psi tire pressure Provide a chart (shown below) of out year funding showing contract dollar requirements. Include information for five years, FY 2015 through FY Need NAPMRC provides the ability to test the surface layers, pavement materials, and alternative pavement materials. Improved paving materials characterization will conserve airport development funds and reduce the downtime of runways from construction and maintenance activities. Test results will help in developing standards/specification for new asphalt technologies such as WMA, SMA, RAP, etc. FY 2015FY 2016FY 2017 FY-18 Funding Target ($000) $750$800$1700$1751

3 Federal Aviation Administration RPA P2 – NAPMRC March 15, 2016

4 Federal Aviation Administration RPA P2 – NAPMRC March 15, 2016 NAPMRC – Dedication Ceremony 8/27/2015

5 Federal Aviation Administration RPA P2 – NAPMRC March 15, 2016

6 Federal Aviation Administration RPA P2 – NAPMRC March 15, 2016

7 Federal Aviation Administration RPA P2 – NAPMRC March 15, 2016

8 Federal Aviation Administration RPA P2 – NAPMRC March 15, 2016 Objectives, Pavement Construction, Sensors NDT & Pavement Characterization Full-Scale APT, Pavement Evaluation Posttraffic Testing TEST CYCLE (TC) AT NAPMRC

9 Federal Aviation Administration RPA P2 – NAPMRC March 15, 2016 PG PG PG PG PG PG P401 HMA WMA P401 HMA P401 HMA WMA 210 psi 210 psi 210 psi 210 psi 210 psi 210 psi 254 psi 254 psi 254 psi 254 psi 254 psi 254 psi MATERIAL TIREPRESSURE BINDERTYPE NAPMRC Test Cycle-1 (TC-1)

10 Federal Aviation Administration RPA P2 – NAPMRC March 15, 2016 Pavement Cross Sections

11 Federal Aviation Administration RPA P2 – NAPMRC March 15, 2016

12 Federal Aviation Administration RPA P2 – NAPMRC March 15, 2016

13 Federal Aviation Administration RPA P2 – NAPMRC March 15, 2016

14 Federal Aviation Administration RPA P2 – NAPMRC March 15, 2016

15 Federal Aviation Administration RPA P2 – NAPMRC March 15, 2016

16 Federal Aviation Administration RPA P2 – NAPMRC March 15, 2016

17 Federal Aviation Administration RPA P2 – NAPMRC March 15, 2016 HVS-A TC1: Wander Pattern

18 Federal Aviation Administration RPA P2 – NAPMRC March 15, 2016

19 Federal Aviation Administration RPA P2 – NAPMRC March 15, 2016 LANE-4S P401 PG64-22

20 Federal Aviation Administration RPA P2 – NAPMRC March 15, 2016 LANE-2S WMA PG64-22

21 Federal Aviation Administration RPA P2 – NAPMRC March 15, 2016

22 Federal Aviation Administration RPA P2 – NAPMRC March 15, 2016

23 Federal Aviation Administration RPA P2 – NAPMRC March 15, 2016

24 Federal Aviation Administration RPA P2 – NAPMRC March 15, 2016

25 Federal Aviation Administration RPA P2 – NAPMRC March 15, 2016

26 Federal Aviation Administration RPA P2 – NAPMRC March 15, 2016 PG PG PG PG PG PG P401 HMA WMA P401 HMA P401 HMA WMA 210 psi 210 psi 210 psi 210 psi 210 psi 210 psi 254 psi 254 psi 254 psi 254 psi 254 psi 254 psi NAPMRC Test Cycle-1 (TC-1)

27 Federal Aviation Administration RPA P2 – NAPMRC March 15, 2016 PG PG PG PG PG PG RAP 1 RAP 2 WMA 1 P401 HMA WMA 3 WMA 2 MATERIAL BINDERTYPE CRACKING (test during winter) RUTTING (test at high temperature) NAPMRC Proposed Test Cycle-2 (TC-2)

28 Federal Aviation Administration RPA P2 – NAPMRC March 15, 2016 Future Research EVALUATION OF NEW ASPHALT TECHNOLOGIES FOR AIRFIELD PAVEMENTS Warm Mix Asphalt, Stone Matrix Asphalt, Polymer Modified Binders, RAP Mixes, Full-Depth Rehabilitation EVALUATION OF NEW ASPHALT TECHNOLOGIES FOR AIRFIELD PAVEMENTS Warm Mix Asphalt, Stone Matrix Asphalt, Polymer Modified Binders, RAP Mixes, Full-Depth Rehabilitation PROBLEM: Lack of Guidance/Standards/Specifications Lack of Performance Data PROBLEM: Lack of Guidance/Standards/Specifications Lack of Performance Data Laboratory Performance Evaluation Full-Scale APT NAPMRC Field Performance Evaluation Evaluate:RuttingFatigue Moisture Susceptibility Durability Low Temperature Cracking Full-Scale APT: RuttingFatigue Tire Pressure Effects WMARAP/RAS Full Depth Reclamation Compare to P-401 HMA Field Projects: Lab Evaluation of Field Mixes Construction Evaluation Evaluate: Mix Design Production, Construction Support from AAS-100, ADO

29 Federal Aviation Administration RPA P2 – NAPMRC March 15, 2016