Adani Power Ltd. IPO meet key takeaways 21 July 2009.

Slides:



Advertisements
Similar presentations
Achieving Price-Responsive Demand in New England Henry Yoshimura Director, Demand Resource Strategy ISO New England National Town Meeting on Demand Response.
Advertisements

Business Plan: Balancing the electrical grid load by remote control of electrical consumers Student: Gregor Androjna address student:
Energy supply procurement services to improve the transaction process and help you get the most competitive prices Florida Public Service Commission July.
FY 2004, Quarter IV 27 h Jan, Disclaimer Certain statements on this presentation concerning our future growth prospects are forward-looking statements,
By Sudhir K. Saxena Exe.Engg.Elect.Engg. Mgt/RB. Electricity consumption over Indian Railways for traction & non-traction.
This presentation contains certain forward looking statements concerning Kalyani Steels future business prospects and business profitability, which are.
Chapter 15 Marketing Channels, Logistics, and Supply Chain Management.
1 Presentation on Indian Power Sector : Key Issues By R.V. SHAHI Secretary (Power), Government of India November 16, 2006 Power Ministers’ Conference on.
By- Sapana Agarwal Shweta Karan Rishal Bhide
Removing Roadblocks in Generation – Towards 24 Hour Power Supply Association of Power Producers 19 Dec 2011.
Prayas - EGI Presentation - 14 IACC, Bangkok, Nov Clean Energy and Regulation: Challenge of information asymmetry and weak oversight Shantanu Dixit.
© C.Hicks, University of Newcastle WAR/1 Knowledge Management in Capital Goods Companies Dr. Christian Hicks University of Newcastle upon Tyne.
1 Georgian National Energy and Water Supply Regulatory Commission Tariff Regulation Gocha Shonia Department of Methodology and informational provision.
Strategies then and Now
Dabhol Power Project. “…it [ICF] is a mix of finance, economics and, like it or not, politics.”
April 23, 2013 NATIONAL COAL CONFERENCE Chairman Robert F. Powelson Pennsylvania Public Utility Commission.
Strategies for the security of electricity supply.
Peak Oil Opportunities and Challenge at the end of Cheap Petroleum Richard Heinberg Scripps College September 18, 2006 The Challenge of Peak Oil Richard.
Options for Renewable/ Captive/ IPPs etc. EXTRACTS FROM ELECTRICITY ACT 2003 Para 3(1) NATIONAL ELECTRICITY POLICY AND PLAN: The Central Government shall,
Indian Power Sector- Clean Coal Technologies V.S. VERMA MEMBER, CERC 1.
Epiphany Partners Corporation HealthTechNet ClerePath TM Solution July 21, 2006.
Gujarat Ambuja Cements Limited Wednesday, November 1, 2006.
GMR Group Discussion Paper on Terms and Conditions of Tariff November 12, 2003.
The World Bank Group Ashish Khanna India Energy Team Leader South Asia Sustainable Development.
Leveraging the Skills of Load Research to Add to the Bottom Line AEIC Load Research Conference Myrtle Beach, SC July 10-13, 2005.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
28. JetBlue Airways. 1. Background: As a small and low cost airline, JetBlue has been one of successful small airline companies. Its operating strategy.
Privatization and Liberalization of the Electric Power Industry in Taiwan Energy Commission Ministry of Economic Affairs October 5, 2001.
Private Sector Presence - Scope Unlimited - by Shri Markand Bhatt Group CEO Torrent Group.
INDIAN COAL MARKETS CONFERENCE Presentation points by Anand Narayanan CEO HQCP Energy Services.
Hazira LNG Pvt. Ltd (HLPL).
Power Trading By P.S.Bami President – India Energy Forum & Former Chairman & Managing Director, NTPC 1.
Capacity Forecast Model Mark Ruane Credit Work Group ERCOT Public October 15, 2014.
The Hub Power Company Ltd. China-Pakistan Economic Corridor Power Projects Round Table on Energy Serena Hotel, Islamabad September 29 th -30 th, 2015 Nazoor.
Transition of the Generation Fleet in a Carbon-constrained World American Public Power Association October 17, 2006 Barbara Tyran Director, Washington.
ECommerce Simplified. This presentation and the accompanying slides (the “Presentation”), which has been prepared by iStreet Network Limited (the “Company”),
QUOTE “We live in a post war world. Today shooting wars are exception. But are we entering an era of Resource Wars?. And energy is the principal resource.
Generation Costs. Fuel InputProcess (Generating station) Electrical Energy output Cost of Electrical energy = Cost of fuel + processing cost.
POWER SECTOR REFORMS Grid Operation and Control in the changed Scenerio.
Presentation on Capacity Addition targets for X th Plan MINISTRY OF POWER 2 nd May 2002.
Ministry of New and Renewable Energy Government of India 1 11th January, 2016.
Company is giving a fix income on every lead which is complete by you or by your Executive, I.E. Rs. 900/- E.G. if a single field executive.
AVAILABILITY BASED TARIFF AND SCHEDULING MECHANISM.
NORTHERN REGIONAL LOAD DISPATCH CENTER 1.Revision Of Ceiling Of UI Rates and slope. 2.Revision Of Schedule after a Transmission Constraint is over. 4.RLDC’s.
Ainārs Meņģelsons Public Utilities Commission Latvia 9th Baltic ERI September 16, 2009 Vilnius, Lithuania LATEST UPDATE IN LATVIA.
UltraTech Cement Q1 FY10 Result Update. Ultratech Q1 FY10 Q1 FY09% Change YOY Revenue EBITDA OP Mrgn 3225 Net profit
Share Splits.
Experience of R & M from Regulatory Perspective
Damitha Kumarasinghe Director General
Electricity Generation: Coal v/s N-Gas - Basic Economics
Hartek Group is one of India’s fastest growing company with offerings that span across Engineering, Renewables, Technology , Construction , Fuel and Manufacturing.
OGK-2 Group FY2016 IFRS Results
Electricity Generation: coal v/s n-gas - Basic Economics
LATEST UPDATE IN LATVIA
Solar Power in Madhya Pradesh
Project Management Dr. Aravind Banakar –
Project Management Dr. Aravind Banakar –
Operation Management
Operation Management
Project Management
Project Management
Project Management
Project Management
WELCOME TO 85TH ANNUAL GENERAL MEETING 29TH JUNE 2004
Harnessing Renewable Energy Solar Mission of Indian Railways
Bulk Material Handling Business
TABLE OF CONTENTS 1.OVERVIEW-cement industry careers Major players
Purchased Gas Cost Adjustment (PGA) 101
Purchased Gas Cost Adjustment (PGA) 101
Curtailing curtailment
Presentation transcript:

Adani Power Ltd. IPO meet key takeaways 21 July 2009

The facts… Prior issue shares outstanding: 1, mln Face value: Rs. 10 Public issue: mln Employee reservation: 8 mln Post issue shares outstanding: 2, mln Likely price band: Rs 90 – 100 Aggregating to: Rs 26,429 – mln Pre-IPO issue: 9.14 Rs 81.42

The story… Project detailsMundra I and IIMundra IIIMundra IV Tiroda, Maharashtra Capacity (MW) Estimated cost (Rs. mln) Per MW cost (Rs. mln) PPA details (MW) 1000 MW with Gujarat SEB 1424 MW with Haryana SEBs 1320 MW with Maharashtra SEB PPA rate (Rs.) 2.81/kWh for the first year to Rs. 3.42/kWh in the 25th year Fixed rate of Rs 2.35/kWh Tariff range from Rs 2.35/kWh to 3.26/kWh 2.55/kWh for the first year to Rs. 3.47/kWh in the 25th year Merchant power capacity PPA commissioning timelineFeb' 10Jun' 11Apr' 12

The story… Planned capacity addition (MW)

The story… Projects in planning stage (post 2012) ProjectsKawaiDahejTotal Capacity (MW)1,3201,9803,300 Project cost (Rs mln)58,89088,810147,700 Per MW cost (Rs mln)45 89 LocationRajasthanGujarat

The strategy… Vertical integration Coal transportation through parent shipping company Fuel tied up until FY2022

Related to peers…my part FY10FY11FY12 Capacity (MW) NTPC30,83033,36037,440 Reliance Power6001,5004,140 Adani Power1,3201,9803,300 Price/Book NTPC Reliance Power Adani Power  Based on Rs 90, NTPC appears cheaper on relative basis  Also Adani Power carry the execution risk  Play for listing gains