Twelfth Board Meeting Marrakech, 15-16 December 2005 Portfolio Committee: Report to the Board.

Slides:



Advertisements
Similar presentations
Grant Life Cycle TGF/LOG/150804/1.
Advertisements

Governance & Nominating Committee (GNC) Report WECC Board Meeting – December 6-7, 2007.
Agency reviews: purpose and stages of the review process Achim Hopbach.
Promotion and Tenure Faculty Senate May 8, To be voted on.
Ninth Replenishment of IFAD’s Resources Draft Resolution: Revisions made since the 2 nd Session of Consultation October 2011.
Sustainable Energy Systems Overview of contractual obligations, procedures and practical matters KICK-OFF MEETING.
Grant implementation STOP TB workshop December 2005.
The CCM.
GEF Expanded Constituency Workshop
John Zammit-Haber National Grid
The Global Fund- structure, function and evolution February 18, 2008.
PROPOSED IAM BY-LAW AMENDMENTS AND/OR REVISIONS. TERRY R. HEAD President International Association of Movers.
Sub-regional Workshop for GEF Focal Points Eastern and Southern Africa Sandton, South Africa, 3-4 November 2010 Sub-Regional Workshop for GEF Focal Points.
Open Society Institute, Public Health Program Proposal Development and Advocacy Seminar for Eastern and Southern Africa Cape Town, South Africa 18 February.
1 ANSI Conference on U.S. Leadership in ISO and IEC Presented by Mr. Steven P. Cornish Director, International Policy American National Standards Institute.
The Global Fund - Proposal Process & Round 8 February 19, 2008.
Doc.: IEEE /1129r1 Submission July 2006 Harry Worstell, AT&TSlide 1 Appeal Tutorial Notice: This document has been prepared to assist IEEE
The Doha Declaration and the Protocol amending the TRIPS Agreement Islamabad, 28 November 2007 Octavio Espinosa WIPO.
Global Fund Assessments Part I: Processes and Tools Geneva – December 2005.
© 2008 International Intellectual Property June 24, 2009 Class 8 Patents: Multilateral Agreements (WTO TRIPS); Global Problem of Patent Protection for.
Grant Agreement Documents (between Global Fund and Principal Recipient) Workshop for TB Experts Hosted by WHO Stop TB and the Global Fund December 2005.
International Trade Regulations: the Law of the WTO Professor Mohammad F. A. Nsour Class 3 1.
M ODULE 5 PART 1: Introduction to Consolidation of Pharmaceutical and Health Product Management (PHPM) in the SSF Context GLOBAL FUND GRANT CONSOLIDATION.
Green Climate Fund TC Geneva, 9 September 2011 Enhanced Direct Access – The approach of the Global Fund. Katja Roll External Relations and Partnerships.
The Global Fund and Southern Africa A review of the structures and grants in southern Africa.
Session 2 Laws and Regulations Project for Capacity Development for Implementing the Organic Law at the Capital and Provincial Level (PILAC 2)
M&E System Strengthening Tool Workshop on effective Global Fund Grant negotiation and implementation planning January 2008 Manila, Philippines Monitoring.
15 step process for developing an inclusive and widely supported integrated RH/HIV Proposal R8 Richard Matikanya International HIV/AIDS Alliance.
Mobility and Career Development Framework Staff Council United Nations Staff Union Vienna.
Global Fund Assessments Part II: Understanding Assessment Results Geneva – December 2005.
M ODULE 6 PART 1: Planning and Stakeholder Management GLOBAL FUND GRANT CONSOLIDATION WORKSHOP DATE.
School Site Council (SSC) Essentials in brief An overview of SSC roles and responsibilities Prepared and Presented by Wanda Chang Shironaka San Juan Unified.
1 Phase 2 Grant Renewals - March A- Overview A.1- Performance-based Funding Y1Y2Y3Y4Y5 Proposal Initial Grant Agreement(s)Extension of Grant.
Consideration Of Updates And Additional Revisions To Procedures For Conducting Board and Committee Activities Board Item # 2.
1 May 30, 2007 U.S. – China Symposium on Active Industry Participation in Standardization Overview of U.S. Participation in ISO and IEC.
1 January 2005 Introduction to Phase 2 and General Update Lesotho CCM.
Change Orders, Extras and Claims Presented by Geoffrey Cantello, City of Ottawa.
Dashboard Country Coordinating Mechanism Honduras Tegucigalpa, May 2007.
Twelfth Board Meeting Marrakech, December 2005 Internal Appeals for Round 5 Internal Appeal Panel Recommendations.
Thirteenth Board Meeting Geneva, April 2006 Executive Director Recruitment and Transition Report of the ad hoc committee of Chair and Vice Chairs.
1 Technical Evaluation Reference Group (TERG) of the Global Fund TERG Update and CCM Assessment Results Prof Rolf Korte, Chair of TERG Prof Rose Leke,
Report of the Ethics Committee Eighteenth Board Meeting, 7-8 November 2008.
Secretariat of the Stockholm Convention Getting ready for COP-4.
UGANDA CCM SECRETARIAT FOR THE GLOBAL FUND (GF) NEW CCM ELIGIBILITY REQUIREMENTS & MINIMUM STANDARDS – UNDER THE GF NEW FUNDING MODEL December 2013.
Nineteenth Board Meeting Geneva, 5-6 May 2009 Report of the Policy and Strategy Committee Amb. Lennarth Hjelmåker, PSC Chair IMPORTANT INFORMATION Decisions.
An Integrated Approach to the Future Role of the RCARO in Support of the RCA Programme.
Report of the Portfolio Committee. 1.Delegated Authority for the PC to Approve Guidelines and Proposal Forms 2.Flexibility in Phase 2 Timing 3.Income.
Seventeenth Board Meeting Geneva, April 2008 Report of the Portfolio Committee Geneva, 28 April 2008 K. Sujatha Rao, Chair of the PC.
CONTRACTING UPDATES AND BEST PRACTICES Purchasing & Contracting August 2016.
Report of the Portfolio Committee New Delhi, 8 November K. Sujatha Rao, Chair of the Portfolio Committee.
Thirteenth Board Meeting Geneva, April 2006 Report of the Portfolio Committee.
An Overview of the Global Fund and its Architecture
Objectives of WHO's collaboration with NGOs
Updating the Regulation for the JINR Programme Advisory Committees
Overview of U.S. Participation in ISO and IEC
ISO Partnering & Twinning
Access to Medicines for HIV/AIDS, Tuberculosis and Malaria.
Agenda 5.11 General Regulations
CCM Eligibility and Performance Assessment (EPA)
Standards and Certification Training
Briefing by SEZ & ET to the Portfolio Committee on
Update: The Global Fund Activities in Thailand
Sponsor Ballot Comment Resolution
Appeal Tutorial Date: Authors: July 2006 Month Year
Exchange of information with the WP.29 secretariat
THE SCHOOL SITE COUNCIL
INTERNATIONAL FUEL TAX AGREEMENT (IFTA)
Bhutan CCM : (Election Process, Nomination of Sub Committees, Update)
Main S+D Provisions of the WTO-Agreement on Trade Facilitation
General Discussion Conclusions:
Presentation transcript:

Twelfth Board Meeting Marrakech, December 2005 Portfolio Committee: Report to the Board

Twelfth Board Meeting Marrakech, December 2005 Outline Decisions points relating to: –Extension of term of Vice-Chair of the TRP –Approval of additional alternate TRP members –Operationalization of Phase 2 “No Go” Procedures –No Cost Extensions at the end of the proposal completion date Brief update of matters currently under consideration by PC

Twelfth Board Meeting Marrakech, December 2005 TRP Matters: Extension of term of Vice-Chair In order to allow the Vice Chair to become Chair of the TRP, his term must be extended; This is to allow for continuity in the TRP; The decision point will enable the current Vice- Chair to serve as Chair during Rounds 7 & 8.

Twelfth Board Meeting Marrakech, December 2005 TRP Matters: Expansion of Alternates’ Pool The profile of each round differs via-a-vis the types of applications received; this can require different TRP skills and profiles The TRP would like to call on assistance from an expanded pool of alternates to support the review process The TRP therefore seeks to expand by four the pool of alternates Use of alternates will be at the discretion of the Chair of the TRP

Twelfth Board Meeting Marrakech, December 2005 Proposed Decision Point: Technical Review Panel Membership Decision Point 1: Mindful of the current distribution of the geographic diversity of the Technical Review Panel pool, the Board requests the Portfolio Committee to recommend for approval at the 13th Board meeting one additional Alternate Member of the Technical Review Panel for each area of expertise (HIV/AIDS, tuberculosis, malaria and cross-cutting). Decision Point 2: The Board authorizes the Chair and Vice Chair of the Technical Review Panel to add temporarily up to four members, which shall be selected from existing Alternate Members, to the membership of the TRP for a given round of proposals, where appropriate in light of the number of proposals and their distribution among categories. There are no material budgetary implications for this decision.

Twelfth Board Meeting Marrakech, December 2005 Background: Phase 2 Decision- Making Policies and Procedures At its 11 th Board Meeting the Board decided that: “ In anticipation of a full review of the Phase 2 policies and procedures in 2006, the Board requests the Portfolio Committee to make recommendations with respect to the composition and functioning of the independent panels…and to present amended Phase 2 Policies and Procedures reflecting the process described in [the first part of the decision]”

Twelfth Board Meeting Marrakech, December 2005 Background: Phase 2 Decision- Making Policies and Procedures As per the Board Mandate, the PC addressed the following: Composition of the Independent Panel Functioning of the Independent Panel Amended the Phase 2 Policies and Procedures

Twelfth Board Meeting Marrakech, December 2005 Background: Phase 2 Decision- Making Policies and Procedures Summary of Composition of Independent Panel Two senior members supported by 1-2 analysts Conflict of interest should be considered Senior members should have solid understanding of country processes; Analysts should understand Global Fund principles and procedures; Pool of pre-qualified candidates to be identified through partners, including WHO, UNAIDS and the WB; A tentative list of candidates to be compiled based on these criteria; The list will be submitted to the Chair and Vice Chair of the Board and the Chair and Vice Chair of the PC. The Chair and Vice Chair of the Board in consultation with the Chair and Vice Chair of the PC will select the members of the Independent Panel; Panel members will be remunerated; and The Secretariat will facilitate the process.

Twelfth Board Meeting Marrakech, December 2005 Background: Phase 2 Decision- Making Policies and Procedures Summary of Principles for Independent Panel’s Scope of Work: The objective will be to submit conclusions to the Board based on all information from the CCM, PR, Secretariat and Board constituencies; The panel may carry out a field visit if deemed necessary The analysis should include –a chronology of information provided, –a typology of the content and –an analysis of the source and flow of information. The review should take into consideration different arguments, how they refer to each other, highlight areas of agreement and disagreement, and define the areas not previously addressed by the parties involved; The review should be submitted to Board no later than six weeks after receipt of the relevant information from the Secretariat.

Twelfth Board Meeting Marrakech, December 2005 Proposed Decision Point: Phase 2 Decision-Making Policies and Procedures Decision Point: The Board approves the document entitled “Phase 2 Decision-Making Policies and Procedures” included as Annex 1 to the Report of the Portfolio Committee (GF/B12/6) and as amended at the 12th Board Meeting and revokes all previously approved versions of such document.

Twelfth Board Meeting Marrakech, December 2005 Background: No Cost Extensions at end of Phase 2 Existing policy: The Board has already approved the possibility of providing no-cost extensions for Phase 1 in exceptional circumstances. Proposed policy: The PC believes that the Board may also provide the possibility of a no-cost extension for Phase 2 in exceptional circumstances.

Twelfth Board Meeting Marrakech, December 2005 Background: No Cost Extensions at end of Phase 2 To date, the board has approved 3 no-cost extensions at the end of Phase 2 on an ad-hoc basis and by vote: –2 Sri Lanka Grants due to Tsunami and –1 Cote D’Ivoire Grant due to civil unrest Introducing a policy would enable the no-cost extension policies for phase 1 and phase 2 to align and mirror one another.

Twelfth Board Meeting Marrakech, December 2005 Background: No Cost Extensions at end of Phase 2 The policy is designed to enable no-cost extensions of Phase 2 two circumstances: 1.Exceptional circumstances in Phase 2: When the PR cannot use full grant amount due to exceptional and extenuating circumstances (eg civil unrest or natural disaster) Natural Disaster Phase 1 (2 years) Phase 2 (3 years) No Cost Extension (Maximum 6 Months) Implementation affected by Natural Disaster or Civil Unrest, beyond the PR’s control

Twelfth Board Meeting Marrakech, December 2005 Background: No Cost Extensions at end of Phase 2 The policy is designed to enable no-cost extensions of Phase 2 two circumstances: 2. Previous No-Cost Extension: A previous No-Cost extension has effectively shortened the Phase 2 duration Phase 1 (2 years) Phase 2 (3 years) Original: No-Cost Extn Phase 1 (2.5years) Phase 2 (2.5 years) Phase 1 (2.5years) Phase 2 (3 years) Proposed: No-Cost Extn Phase 2

Twelfth Board Meeting Marrakech, December 2005 Proposed Decision: No Cost Extensions at end of Phase 2 Decision Point 1: The Board authorizes the Secretariat to extend the Phase 2 term of Grant Agreements by up to six months, without committing any additional funding, in circumstances where the Principal Recipient is prevented, due to exceptional circumstances, from using the full amount of Grant funds during the Phase 2 term. Decision Point 2: The Board decides that in circumstances where the term of a Phase 1 Grant Agreement has been extended in accordance with paragraph 4 of the Phase 2 Decision-Making Policies and Procedures attached as Annex 1 of the Report of the Portfolio Committee (GF/B12/6) (a “Phase 1 Extension”), the Secretariat may extend the Phase 2 term of Grant Agreements by up to an equal length of time as the Phase 1 Extension without committing any additional funding. The Secretariat shall inform the Board immediately upon taking action under Decision Point 1 and 2. There are no material budgetary implications for this decision.

Twelfth Board Meeting Marrakech, December 2005 Conclusion Next: Decision Points to be decided upon by Board members