Nominations James Mellsop Director 4 December 2012 Presentation to PEA.

Slides:



Advertisements
Similar presentations
Market Architecture Robert Wilson Stanford University.
Advertisements

UK Gas Entry Regime – Review of existing Interruptible Arrangements & Potential Reforms for this Winter.
North / North West Region Regional Gas Initiative Regulatory Co-ordination Workshop 8 th February 2007.
1 Priority issues for the French-UK-Irish regulators What is expected from TSOs? 30 May 2006 To increase trade between adjacent markets and therefore have.
Hybrid freight market: storyline -E-markets for freight capacity now rely mostly on volume information and are rather static (function within the existing.
EU Implementation Programme Action TR1003: All to consider how to address EU developments going forward and send any identified issues to:
Review Group 0166 Review of Necessary Reform of NTS Offtake Arrangements 20 th September 2007 Beverley Grubb SGN.
Directie Toezicht Energie, Bonn WS 8 february Bonn 1 SG Workshop: Secondary markets for interconnection capacity: way to adress contractual congestion.
Nominations and Scheduling Questar Gas Company Annual Account Management Customer Meeting Will Schwarzenbach Director, Gas Supply.
Rocío PRIETO – Comisión Nacional de Energía Benoît ESNAULT – Commission de Régulation de l’Energie LNG TF chairs 18th Madrid Forum Madrid, 27/28 September.
THE TRES AMIGAS SUPERSTATION Southwest Renewable Energy Conference Santa Fe, NMSeptember 16 th 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
Economic Demand Response Sheldon Fulton Executive Director, IPCAA November 4, 2008.
New Procurement & Delivery Arrangements for the Schools’ Estate Presentation to Strategic Advisory Group 18 April 2005.
Charging Methodology Development Oliver Day © Copyright EDF Energy plc. All rights reserved. Charging Methodology Update April 2008 Oliver Day Distribution.
Capacity trade and transfer mechanism and the next AMSEC auction Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 9 May 2007.
1 Dublin 23/24 April 2007Autor Jacques Guldenmundt EFET, input for discussion on ‘day-ahead-auctions’, Dublin, 23/24 April 2007.
® July 30 th, 2014 Utah PSC Technical Conference.
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
CMP PROPOSAL FOR HARMONISATION 16 th IG meeting Madrid 6 th May 2011.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
8 February Study Co-Ordination on Day Ahead Capacity in Bunde/Oude Statenzijl and Ellund EC-Operators of Implementation Group ERGEG Regional Gas.
1 Market Evolution Program Long-Term Resource Adequacy Regulatory Affairs Standing Committee Meeting May 14, 2003.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
Update on Entry Capacity Substitution Transmission Workstream 6 th March 2008 Summary of consultation responses.
Mod 270 Potential Options Rob Hill 15/02/2009. Six potential options following discussion at last months Development Workgroup OptionNameDescription 1Elective.
Open letter on Development of the regime ahead of winter 2007/8 Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 28 June 2007.
Initial Thoughts on the Release of Non Obligated NTS System Entry Capacity Transmission Workstream 3 rd April 2008.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
15 February 2006 TPCR second consultation: gas offtake Offtake Arrangements Workstream 15 February 2006.
GRI NW TRANSPARENCY PROJECT Transparency Workshop 31 March 2009.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Radiocommunications Agency Independent Review of Radio Spectrum Management.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
1 Review Group 264 Rules & Options Analysis for BSSOQ Methodology Changes Post MOD th September 2009.
Entry Capacity Substitution Workshop 4 9 th July 2008 Entry Capacity Substitution Methodology Statement: Discussion Paper.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
Market Coupling PEG Nord / PEG Sud South Gas Regional Initiative 11 th July 2011 Madrid.
DRSEC Update Transmission Workstream 06 November 2008.
Role Of ERC in the WESM To enforce the rules and regulations governing the operations of the WESM and monitors the activities of the Market Operator and.
18 December Study Co-Ordination on Day Ahead Capacity in Bunde/Oude Statenzijl and Ellund EC-Operators of Implementation Group ERGEG Regional Gas.
© 2007Slide 1 Solution Outline for Day-ahead Capacity Trading at Interconnection Points Marco Wettig Dublin, April 24th 2007.
Overview of the Contract Carriage Gas Markets in Eastern Australia James Mellsop Director 4 December 2012 Presentation to PEA.
Work Plan and Key Deliverables 2 November WORK PLAN.
McGraw-Hill/Irwin Copyright  2006 by The McGraw-Hill Companies, Inc. All rights reserved. ECONOMICS AND ECONOMIC REASONING Chapter 1.
Gas Transmission and Capacity Pricing Workshop – Topics for Discussion 11 April 2013.
Proposals for physical constraint management Presentation to PEA James Mellsop Director Wellington 29 January 2013.
Transmission Access Workshop 8 March Workshop agenda 1.Introduction 2.Allocative Efficiency - initial allocation ● Is the length of property right.
PEA meeting material 15 March PEA’S FURTHER ADVICE TO GIC ON TRANSMISSION ACCESS AND CAPACITY PRICING Gas Industry Co2.
Joint Energy Auction Implementation Proposal of PG&E, SCE and SDG&E California Public Utilities Commission Workshop – November 1, 2006.
Nominations PEA Meeting October Why ask for Nominations? In a common carriage system gas flows must be approved in advance to keep them within pipeline.
Review of the Market Reform report Presentation to PEA Wellington 2 November 2012 James Mellsop Director.
Draft Decision on the Reset of Prices for Electricity Distribution Businesses Presentation to Market Analysts 19 July 2011.
Gas Transmission and Capacity Pricing Workshop - Introduction 11 April 2013.
Details of demand management options
Congestion Management
Transmission Workstream 7th Dec 2006 Chris Logue
Capacity allocation in natural gas transmission networks Pilot framework guideline - Public consultation results and new content of guidelines - Dr.
EU Implementation Programme
26th IG meeting 23th January 2014
9th FUI Stakeholder Group Meeting Dublin, 16 June 2010
GRI NW TRANSPARENCY PROJECT
8th SG meeting ERI South-West Europe
Demand management options on the Vector pipeline system
Transmission Workgroup June 7th 2012
An action-based way forward
EURELECTRIC transparency requirements
Entry Capacity Transfer and Trade
Ofgem presentation to Gas Transmission Workstream
Frameworks for considering longer-term options
Presentation transcript:

Nominations James Mellsop Director 4 December 2012 Presentation to PEA

1 Presentation outline  Maui nominations and applicability to Vector  Nominations and price rationing

Maui nominations and applicability to Vector

3 Strengths and weaknesses of the Maui nominations regime Strengths Facilitates maximum use of capacity Provides prior indication of constraints Provides invoicing base Weaknesses/costs No significant weaknesses identified, but there are some costs Requires a process to monitor nominations/manage system Requires a mechanism to incentivise accurate nominations (Maui balancing regime provides this)  Have tried to identify strengths/weaknesses independent of the common carriage regime

4 Benefits and costs of a nominations regime on the Vector pipeline Benefits Would provide information to better manage peaks and anticipate capacity constraints Would allow better management of interruptible contracts Would allow use-it-or-lose-it rules to be implemented Might facilitate secondary trading Might assist coordination between Maui and Vector pipelines Costs Increased operational costs – requires a good pipeline model to identify constraints (Vector pipeline more complex than Maui, as more potential sources of constraints) MRP argues that would require daily allocation process for mass market customers Incremental costs for shippers would be small, as already nominating on Maui

Nominations and price rationing

6 Recap of PEA’s July paper  Introduce nominations regime on Vector system  If nominations exceed capacity, either –Scale back nominations in excess of firm capacity by pre- determined rules; or –Ration nominations in excess of firm capacity by price mechanism  First option would rely on secondary trading  Second option would rely on TSO-instituted auction

7 Submissions  Few submissions were against a nominations regime –Greater transparency –Help with physical constraints –But desire for more detail, and some questions about why not just go to common carriage  Not much comment on specific proposals for dealing with physical constraints –Due to coincident demand, Genesis not convinced that secondary trading would “ignite”

8 Updated views (no real change)  For both pipelines: –Nominations regime –Simple auction mechanism at time of physical constraints, utilizing adaption of existing bulletin board  To discuss: –Sufficient time to run auction? –Is there a cost effective auction platform if only used rarely? –What to do with rents?

Contact Us Name James Mellsop NERA—Auckland © Copyright 2012 NERA Economic Consulting Limited All rights reserved.