Section Meeting News and MARS 22/01/2010 - FH1. General Activity and Staff Organigram for the DI Section 22/01/2010 - FH2 TF+GlassAndre Braem Thomas Schneider.

Slides:



Advertisements
Similar presentations
INGAS General Assembly, Oulu, 25&26 May 2011 INGAS INtegrated GAS Powertrain 1 INGAS 30 months meeting Oulu, 25&26 of May 2011 General Assembly Coordinator.
Advertisements

PH/DT MCP & MNO NEW MAGNET SAFETY SYSTEM HARDWARE Sylvain Ravat PH-DT Xavier Pons PH-DT.
Google Docs- Surveys By Michael Eekhoff Michael Eekhoff Computer Apps 1.
Winter 2011/2012 shutdown On-call service - FSU Future projects AOB G. Olesen - PH-DT-DI.
04/02/ FH Plans for 2005 PH-DT1-GS. 04/02/ FH Physicists: Stefan Haider, Serguei Morozov (PJAS), Ferdi Hahn, Mar Capeans Technicians: Andrea.
DT News CJ ‘Risk Management‘Mark Hatch DT Science-Techno Tea 12 September 2011.
Status and possibilities for the irradiation facility in the PS East Hall Michael Moll, Maurice Glaser 10 March 2010 – IRRAD Working Group - some notes.
September rd Workshop Phnom Penh EMMA East 2014 Quality Assurance.
The Construction of the LHC Detector Gas Systems ? Ferdi Hahn PH-TA1-GS Detector Steering Meeting 4th of June 2004.
Joint Meeting ATLAS-CERN Detector Group / PH-Detector Technology Group Overview of the PH-DT group: Group Structure Current Projects Services White Paper.
The time line Autumn 2011CERN Council initiated an update exercise to the European Strategy for Particle Physics which was approved by a special Council.
Sharing Google Docs. Open Google Chrome Open your dashboard.
1 HR-SMC and HR-SPS – 7 January MARS 2010 REFRESHER PRESENTATION HR presentations to staff members: 7 January 2010 – AT Auditorium 11 January 2010.
1 HR-SMD and HR-SPS – 23 January MARS 2009 REFRESHER PRESENTATION HR presentation STAFF MEMBERS 26 January 2009 – Prévessin 28 January 2009 – AT.
Gas Systems for Particle Detectors R.Guida on behalf of the PH-DT-DI/Gas Service Team PH-DT Seminar CERN September 4 th, 2014.
CERN HR Department Strategy, Management and Development DT2 News Summer Students Presentations: Henrik Friis Dam 'Characterization of Scintillating Fibres.
DT News The Insertable B-layer (IBL) project for the ATLAS Upgrade Raphael Vuillermet, François-Xavier Nuiry and Christophe Bault DT Science-Techno Tea.
Cable Layouts, Connectors for the LHC GAS SYSTEMS GAS COORDINATION MEETING, OCTOBER 2005 PH / DT1 GS.
WLUSA/OSSTF Annual Performance Review Process Human Resources & WLUSA| 2015.
JRA2-brainstorming 4/1/2006, Lucie Linssen, slide 1 introduction to CERN in EUDET The CERN PH (physics) department participates in EUDET PH department:
PH-DT Group Meeting M.Capeans, A.Catinaccio 13/9/2012.
1 HR-SMC and HR-SPS – 10 January MARS 2011 REFRESHER PRESENTATION HR presentations to staff members: 10 January 2011 – BE Auditorium Prévessin 11.
10 th of April 2003 ATLAS “MSS Specification” Magnet Safety Systems – Magnet Common Project E. Sbrissa, G. Olesen – CERN/EP 5 Tests 5.1 Pre-production.
Detector Gas Systems Status Update Ferdi Hahn PH-TA1-GS Detector Steering Meeting November 2004.
Overview of DT group activities in LHCb LHCb CERN team retreat, Les Houches Burkhard Schmidt, PH-DT January 13, 2016.
DT Science-techno tea DT news (CJ) Presentation : Principle, Design and Construction of the ALICE HMPID Paolo Martinengo, Yannick Lesenechal and Jaap van.
RESEARCHERS WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 The agenda Coordinator's Welcome 09:05.
Agenda Introduction et présentations Personnel + Superviseurs Organisation et Activités dans la section Piquets services / Working Hours AOB –Holiday planning.
DT News CJ DT Annual Report 2010 CJ Measurement of the LHC Luminosity André Braem, Matthieu Heller with Scintillating Fibre Detectors in Roman Pots DT.
General News DT Buildings New Tasks - Projects Other items G. Olesen - PH-DT-DI.
MCP Status Magnet Control Project - MCP Common systems: MCS – Magnet Control System – S. Ravat MDS – Magnet Diagnostics System – S. Ravat MSS – Magnet.
25/04/2014R. Guida, A. Wasem PH-DT-DI Gas1 Outline ALICE gas systems meeting Outline Introduction Review usage of ALICE gas M&O 2013 Review achievements.
25/03/2014P. Carrie, R. Guida, S. Pavis PH-DT-DI Gas1 Outline LHCb gas systems meeting Outline Introduction Review usage of LHCb gas M&O 2013 Review achievements.
DT News (5') Christian Joram NA62 and some developments on Straw Tracker Augusto Ceccucci, Hans Danielsson, Francisco Perez-Gomez DT Science-Techno BBQ.
Class of 2016 Senior Advisory 2/17/16. What’s next?
DT-EF Section meeting 29/1/2016
Section meeting PH-DT-EM2 Agenda  Short presentation (tour de table)  General information news  Future projects  Discussion  Coffee and cake PEREZ.
1 st DT-PO section meeting Friday May 16th,14:00, in 155-R-047 Agenda Meeting people Structure and organization of DT Budgets Office Space Mandate of PO.
First discussion on MSS for Katrin March 26, 2013 M.Capeans CERN PH-DT.
DT Technical Space Overview December 2012 M.Capeans, A.Catinaccio PH-DT.
DT News CJ Survey techniques for experiments and advanced 3D Digital Reconstruction Andrea Catinaccio, Aurelie Maurisset, Christophe Bault DT Science-Techno.
Thursday December 11th, 15:00 Hrs, room 155-R-047 Agenda General news and DT (Andrea, Antti) Euclid-Catia.
Thursday November 19 th, 15:00 Hrs, room 155-R-047 Agenda An introduction to the Project Office.
New PH-DT website Nefeli Kousi PH-SFT/PH-DT Supervisor: Danilo Piparo PH-SFT.
Upgrade of the irradiation facilities in the PS East Hall Maurice Glaser, Michael Moll 30 April 2010 – PH-DT steering board meeting activities are part.
GDD Gaseous Detector Developments EP-DT-DD
MARS Merit Appraisal Recognition Scheme
Detector Technology Group (PH/DT)
IT-CM Group Meeting Tim Bell 12th January 2016
PH-DT Seasonal Group Meeting 21/1/14
CERN PH-DT Physics Department (PH) Detector Technologies (DT)
How to Navigate IRB Paperwork.
Performance Appraisal and Management at CERN
Venue: WIIW, Vienna Loredana Marmora and Margaret Pesuit, ISIS
Wrap up Licia Florio AARC Coordinator
How to Navigate IRB Paperwork.
June 22, 2017 Burkhard Schmidt for the DT coordination team
CMS gas systems meeting
Merging DT1 + DT2 FH /
Performance Appraisal and Management at CERN
DT Magnet Activities Overview FH 25/06/2010 -FH.
Unit4 Partner Portal for Case Creator
How to Navigate IRB Paperwork.
Midterm Exam Briefing Semester 2 ( ) Special Jobs CBT Exam
How to Navigate IRB Paperwork.
Soldiers personal and unit information
Loyola’s Performance Management Process For Employees
Green Infrastructure: Working method
Instructions How to upload a draft document for ballot
Work and Service Supervisor
Presentation transcript:

Section Meeting News and MARS 22/01/ FH1

General Activity and Staff Organigram for the DI Section 22/01/ FH2 TF+GlassAndre Braem Thomas Schneider Claude David Miranda Van Stenis Bond Lab.Ian Mcgill Antoine Guipet Irrad. Fac. Maurice Glaser Richard Fortin Magnet Controls + Instrumentation Gert Olesen Nicolas Bourgeois Laurent Deront Xavier PonsPascal HerveGilles MaireSylvain Ravat B-Field Measurements Felix BergsmaGas SystemsStefan Haider Andrea d’Auria Frederic Merlet Patrick CarrieSteven PavisAlbin Wasem Louis-Philippe De Menezes Roberto Guida External Supervisors Leczek Ropelewski Alain Honma Michael Moll

StaffMars SupervisorComment BERGSMA, Felix Mr. Ferdi H. BRAEM, Andre Mr. Input from CJ GLASER, Maurice Mr. Michael Moll present GUIDA, Roberto Dr. No Mars HAIDER, Stefan Mr. MAIRE, Gilles Mr. OLESEN, Gert Mr. RAVAT, Sylvain Mr. SBRISSA, Edo Mr. No Mars CARRIE, Patrick Mr. Stefan H. D'AURIA, Andrea Mr. DE MENEZES, Louis-Philippe Mr. MERLET, Frederic Mr. PAVIS, Steven Mr. WASEM, Albin Mr. GUIPET, Antoine Mr. Alan Honma MCGILL, Ian Mr. FORTIN, Richard Georges Mr. Michael Moll BLANC, Pascal Herve Mr. Gert O. Felix present BOURGEOIS, Nicolas Mr. DERONT, Laurent Mr. PONS, Xavier Mr. VAN STENIS, Miranda Mrs. Leszek RopelewskiAndré present DAVID, Claude Mr. André B. SCHNEIDER, Thomas Hans Mr. Input from Burkhard HAHN, Ferdinand Dr.Christian J. 3

Dead Lines 22/01/ FH4 All proposals Cp and Band changes < 28. February Complete Interviews < 12. March MARS signed by Group leader < 16. April Comments and Technicalities: 1.Supervisor or Staff can create the document. The creator must send the document. 2.Staff has 10 working days to sign her/his MARS. Signature is not mandatory. 3.Forwarding the Doc. to other people: If you would like to have comments from a 2 nd supervisor (same level as you), use forward with rights. Click re-sign afterwards. This function should be reserved to supervisors.

Guidelines for Supervisors: All MARS forms should address safety (in one way or another), e.g. people with TSO functions should have related objectives for DT Specific (see info from CJ last coordination meeting) For people working in an experiment or on several projects, make sure that feedback and input for new objectives are collected from technical supervisors. Possibly invite technical supervisor to interview. The MARS form foresees the possibility to add results for objectives which were only defined during the year. Supervisor objectives to be filled among the other objectives (no special rubric anymore) In case the staff member was (co-)author of scientific articles, notes etc., those should be mentioned in the MARS (e.g. under additional results) From the schedule below, it’s clear that we should start to interview people for whom we Consider SB or CP changes. Some extra paperwork needed. Forms (JIF and CP/SB change) can be produced here: 22/01/ FH5

6 Row Labels ATLAS ALFA ATLAS Operation AX-PET B-Field Measurements Bond. Lab. / DSF CAST M&O CMS Operation DT Admin. FSU Admin. Gas Support Irrad. Facilities LHCb Operation Magnet M&O NA48/62 Rad. Mon. Thin Film TOTEM RP TSO WP4 / RD50WP5 / RD51 WP6 / QC WP7 X-HPD Aegis MSS upgrade CERN Exhibition ArDM Total BERGSMA Felix1.00 BOURGEOIS Nicolas BRAEM Andre CARRIE Patrick1.00 D'AURIA Andrea1.00 DAVID Claude DE MENEZES Louis-Philippe1.00 DERONT Laurent FORTIN Richard Georges GLASER Maurice GUIDA Roberto GUIPET Antoine HAHN Ferdinand HAIDER Stefan MAIRE Gilles MCGILL Ian MERLET Frederic OLESEN Gert PAVIS Steven1.00 PONS Xavier RAVAT Sylvain SCHNEIDER Thomas Hans VAN STENIS Miranda WASEM Albin BLANC Pascal Total Staff versus Activity