Time resolution for the full detector system: 1. Intrinsec detector time resolution 2. Jitter in PMT's 3. Electronics (AMP/CFD/TDC) 4. Reference Timing.

Slides:



Advertisements
Similar presentations
T958! Fermilab Test beam experiment to study fast timing counters for FP420 MOU between UTA, Alberta, Louvain, Fermilab (Brandt spokesman) Data taking.
Advertisements

AFP QUARTIC Fast Timing System James L Pinfold University of Alberta.
Picosecond Timing Workshop 18 November Sales meeting 2005 Discovering the Future.
QUARTZTOFMike Albrow CMS-FP420 April 28 th 2008 QUARTZTOF An isochronous & achromatic Cerenkov Counter Making Cerenkov light parallel  point focusing.
The Factors that Limit Time Resolution in Photodetectors, Workshop, University of Chicago, April 2011 What is known experimentally about timing determinants.
Photodetector Timing Resolution Burle Micro-Channel Plate Photo Multiplier Tubes (MCP-PMTs) H. Wells Wulsin SLAC Group B Winter 2005.
1 A Design of PET detector using Microchannel Plate PMT with Transmission Line Readout Heejong Kim 1, Chien-Min Kao 1, Chin-Tu Chen 1, Jean-Francois Genat.
Large Area, High Speed Photo-detectors Readout Jean-Francois Genat + On behalf and with the help of Herve Grabas +, Samuel Meehan +, Eric Oberla +, Fukun.
1 QUARTIC, A TOF for ATLAS/CMS Forward Protons You didn’t know that ATLAS+CMS had forward protons? FP420 = Forward Protons 420m downstream of CMS & ATLAS.
Development of Picosecond-Resolution Large-Area Time-of-Flight Systems C. Ertley 2, J. Anderson 1, K.Byrum 1, G.Drake 1, H.Frisch 2, J. Genat 2, H. Sanders.
The UC Simulation of Picosecond Detectors Pico-Sec Timing Hardware Workshop November 18, 2005 Timothy Credo.
10 Picosecond Timing Workshop 28 April PLANACON MCP-PMT for use in Ultra-High Speed Applications.
1 QUARTIC: UTA Update Andrew Brandt, Chance Harenza, Joaquin Noyola, Pedro Duarte Preliminary UTA drawing of Mike Albrow’s concept for a fast time resolution.
Measurement of the absolute efficiency,
Groups Involved University of Alberta, University of Texas at Arlington, University College London. Prague, Saclay, Stoneybrook, Giessen, Manchester,
Page The TORCH PMT: A close packing, multi-anode, long life MCP-PMT for Cherenkov applications James Milnes Workshop on picosecond.
LHC Fast Timing Detector R&D Use arrival time difference between protons to measure z- vertex compared with the central tracking primary vertex Purpose:
Peter Križan, Ljubljana March 17, 2006 Super B Workshop, Frascati Peter Križan University of Ljubljana and J. Stefan Institute Aerogel RICH and TOP: summary.
Fast Timing Workshop Krakow, Nov 29 - Dec 1 st 2010 Part 2b.
TOF for ATLAS Forward Proton Upgrade AFP concept: adds new ATLAS sub-detectors at 220 and 420 m upstream and downstream of central detector to precisely.
Page The TORCH PMT: A close packing, multi-anode, long life MCP-PMT for Cherenkov applications James Milnes International Conference.
Blair Ratcliff2 nd Workshop on SuperB, Frascati, March Status Update: the Focusing DIRC Prototype at SLAC Blair Ratcliff Blair Ratcliff Representing:
A DIRC for GlueX April 7, 2006 S. Berridge, S. Spanier.
Experimental set-up Abstract Modeling of processes in the MCP PMT Timing and Cross-Talk Properties of BURLE Multi-Channel MCP PMTs S.Korpar a,b, R.Dolenec.
Photodetection EDIT EDIT 2011 N. Dinu, T. Gys, C. Joram, S. Korpar, Y. Musienko, V. Puill, D. Renker 1 Micro Channel plate PMT (MCP-PMT) Similar to ordinary.
ATLAS Forward Proton Electronics Andrew Brandt, University of Texas at Arlington 1 AFP concept: adds new ATLAS sub-detectors at 220 and 420 m upstream.
1 QUARTIC Update Andrew Brandt (UT-Arlington), Mike Albrow (FNAL), Jim Pinfold (Alberta) Preliminary UTA drawing of Mike Albrow’s concept for a fast time.
FP420/AFP Timing Two types of Cerenkov detector are employed: QUARTIC – two QUARTIC detectors each with 4 rows of 8 fused silica bar allowing up to a 4-fold.
The primary goal has been to have the AFP timing system fully defined for the AFP Technical Proposal by December The end result should be a system.
“End station A setup” data analysis Josef Uher. Outline Introduction to setup and analysis Quartz bar start counter MA and MCP PMT in the prototype.
Detectors and Cross Talk Presented below are cross talk measurements carried out on 2 Burle and 1 Hamamatsu MCP PMTs and 1 Hamamatsu MultiAnode PMT (MAPMT).
Experimental set-up for on the bench tests Abstract Modeling of processes in the MCP PMT Timing and Cross-Talk Properties of BURLE/Photonis Multi-Channel.
TOP counter overview and issues K. Inami (Nagoya university) 2008/7/3-4 2 nd open meeting for proto-collaboration - Overview - Design - Performance - Prototype.
work for PID in Novosibirsk E.A.Kravchenko Budker INP, Novosibirsk.
A First Look at the June Test Beam DAQ Hardware architecture Talk Presented 8 April, 2008 John Anderson HEP Electronics Group Argonne National Laboratory.
Development of TOP counter for Super B factory K. Inami (Nagoya university) 2007/10/ th International Workshop on Ring Imaging Cherenkov Counters.
PID for super Belle (design consideration) K. Inami (Nagoya-u) - Barrel (TOP counter) - Possible configuration - Geometry - Endcap (Aerogel RICH) - Photo.
Mike AlbrowSept 14 th 2006Time-of-Flight with GASTOFs im Test Beam 1 Fast Timing Counters for FP420/CMS and Test Beam Particle ID Mike Albrow, September.
Timing properties of MCP-PMT K.Inami (Nagoya university, Japan) - Time resolution - Lifetime - Rate dependence Photon Detector Workshop at Kobe,
Fast Timing Mtg April 15 th 2009 Mike Albrow Fast Timing studies at Fermilab : Test beam plans notes from meeting April 15 th 2009 MTest May Wed 27 th.
July 4, 2008 SuperBelle Meeting, KEKPeter Križan, Ljubljana Peter Križan University of Ljubljana and J. Stefan Institute Burle MCP PMTs as photon detector.
Updates at Nagoya univ. K.Inami (Nagoya) - Photon detector R&D - Lifetime improvements - Simulation design study.
BURLE update Peter Križan Friday meeting, Mar 24, 2006.
ATLAS Forward Protons: A (10) Picosecond Window on the Higgs Boson Andrew Brandt, University of Texas at Arlington A picosecond is a trillionth of a second.
Barrel PID upgrade K. Inami (Nagoya) Ljubljana, Hawaii, Cincinnati and PID group - R&D status - Structure design - Prototype study - Beam test - Photon.
FIT (Fast Interaction Trigger) detector development for ALICE experiment at LHC (CREN) Institute for Nuclear Research (INR RAS) National Research Nuclear.
1 SiPM studies: Highlighting current equipment and immediate plans Lee BLM Quasar working group.
1992PH.D. UCLA/CERN (UA8 Experiment discovered hard diffraction) Post-doc and Wilson Fellow at Fermilab -Discovered hard color singlet exchange.
Barrel PID summary K.Inami (Nagoya) Summary of R&D at Hawaii, Cincinnati, Ljubljana and Nagoya.
Module-0 of AFP ToF Detector Libor Nozka on behalf of ATLAS Forward Proton Group Palacky University 1.
FP420/AFP Fast Timing Stage I: LHC luminosity 2 x10 33  t < 20 ps (
Pileup Background Rejection Ex, Two protons from one interaction and two b-jets from another Fast Timing Detectors for FP420 z=c(TR-TL)/2  z (mm) =0.21.
AFP Fast Timing System Andrew Brandt, University of Texas at Arlington in collaboration with Alberta, Giessen, Stony Brook, and FNAL, Louvain, LLNL (CMS)
TORCH – a Cherenkov based Time-of- Flight Detector Euan N. Cowie on behalf of the TORCH collaboration E N Cowie - TORCH - TIPP June 2014.
Fast Timing Detector R&D Use time difference between protons in pp->pXp events to measure z-vertex compared with primary tracking vertex Purpose: Pileup.
10 picoseconds original design goal (light travels 3mm in 10 psec!) gives large factor of background rejection; Phase I: lum up to several  t
Mike Albrow, FermilabHPS Comments, Manchester 20l0 Some random HPS comments Mike Albrow HPS is accepted in CMS as an R&D project : Physics case is accepted.
TCT measurements with strip detectors Igor Mandić 1, Vladimir Cindro 1, Andrej Gorišek 1, Gregor Kramberger 1, Marko Milovanović 1, Marko Mikuž 1,2, Marko.
ATLAS Forward Proton Upgrade AFP concept: adds new ATLAS sub-detectors at 220 and 420 m upstream and downstream of central detector to precisely measure.
Fabio, Francesco, Francesco and Nicola INFN and University Bari
Andrew Brandt, University of Texas at Arlington
Overview of SuperB Particle identification, and work towards the TDR
HPS: R&D issues Krzysztof Piotrzkowski (UCLouvain/CERN)
Test Beam Studies for FP420 Fast Timing
Andrew Brandt (UT-Arlington), Mike Albrow (FNAL),
Directional Optical Module Integration
Department of Physics and Astronomy,
Latest Results from T979: PSec Time-of-flight
Development of hybrid photomultiplier for Hyper-Kamiokande
TOF read-out for high resolution timing
Presentation transcript:

Time resolution for the full detector system: 1. Intrinsec detector time resolution 2. Jitter in PMT's 3. Electronics (AMP/CFD/TDC) 4. Reference Timing Andrew Brandt UTA110/14/2009 QUARTIC, Laser Tests, +Lifetime Andrew Brandt, University of Texas at Arlington

4x8 array of 6 mm 2 fused silica bars QUARTIC UTA, Alberta, Stonybrook, Giessen, (FNAL) Only need 40 ps measurement if you can do it 16 times (2 detectors with 8 bars each)! Has x-segmentation for multi-proton timing proton photons

10/14/2009Andrew Brandt UTA3 Micro-Channel Plate Photomultiplier Tube Burle/Photonis 64 channel 10  m pore

Dt QUARTIC Timing 2008 CERN TB 56.6/1.4=40 ps/bar including CFD! Time difference between two 9 cm quartz bars after Louvain constant fraction discrimination is 56 ps, implies a single bar resolution of 40 ps for about 10 pe’s (expected 10 pe’s from simulations). Need to demonstrate  N (wait for it…) N pe =(area/rms) 2 4

Baseline ATLAS Solution: QUARTIC Multiple measurements each with modest resolution on ps scale simplifies requirements in all phases of system. QUARTIC advantages: 1) Have a solution in-hand for full readout chain 2) Segmentation allows multi-proton timing and L1 trigger 3) Only amplifiers have to be near detector, CFD’s and TDC’s can be located further away (timing distortion in cable is a negligible effect for this detector design) Final optimization in progress, may replace quartz bars with quartz fibers, will likely have variable width in x to improve multi-proton res., trigger capability, rate and lifetime (1.5 mm, 3 mm, 6 mm, 12 mm) Andrew Brandt UTA512/12/2009

AFP Timing Progress in 2009 Established UTA Picosecond Test Facility (PTF) for laser tests Developing in depth understanding of MCP-PMT performance Investigated rate and lifetime issues Collaborating with Arradiance, Photek, and Photonis Built a new prototype detector for  N tests (Alberta) Validated readout electronics (Jim’s talk) Investigating fiber-based QUARTIC (Wei-lin’s talk) Settled on QUARTIC as baseline detector 10/14/2009Andrew Brandt UTA6

Anode Current = proton frequency x number of photo-electrons generated by each proton x gain x charge If current is too high (~10% of strip current) the tube saturates (gain is reduced) From laser tests timing is ~independent of gain as long as With 10 pe’s expected for a QUARTIC bar, would need to operate at a gain of ~5x10 4. With proton rate of 15 MHz in 6 mm closest to beam at 220 m at a luminosity of 10 34, we would require a maximum current of about 3  A/cm 2, a factor of several higher than standard MCP-PMT’s, but possible for new generation of Photonis MCP-PMT’s (smarter binning reduces to 1  A/cm 2 ) 10/14/2009Andrew Brandt UTA7 Rate and Current Limits

Lifetime Issues Lifetime due to positive ions damaging the photocathode is believed to be proportional to extracted charge: Q/year = I*10 7 sec/year Q for 3  A/cm 2 is 30 C/cm 2 /yr Without a factor of 20 reduction in gain, the current and lifetime issues would make MCP-PMT’s unusable, with it the rate is borderline, but lifetime off by up to factor of 50— tube dies every week! Andrew Brandt UTA810/14/2009

Options for Improved Lifetime MCP-PMT Ion barrier, already demonstrated, this promises a factor 5 to 6 lifetime improvement (at the cost of a 40% collection efficiency reduction) Electron scrubbing, already demonstrated internally by Photonis, promises a factor 5 to 10 lifetime improvement Z-stack, already demonstrated, this promises a factor of 10 lifetime improvement (A.Yu. Barnyakov, et al., Nucl. Instr. and Meth. A 598 (2009) 160) Arradiance coated MCP’s, to be demonstrated, this promises a factor of 10 or more lifetime improvement (Grants submitted by UTA and Manchester to fund insertion of Arradiance MCP’s in Photonis and Photek tubes: “Development of a Long Life Microchannel Plate Photomultiplier Tube for High Flux Applications through the Innovative Application of Nanofilms”) Various combinations of these factors are possible and should give multiplicative improvement factors, except for the electron scrubbing and Arradiance coating, which would be expected to be orthogonal 910/14/2009Andrew Brandt UTA Pursuing funds to commission, purchase, and test longer lifetime tubes. Photek will build tubes to our specification, Photonis will insert Arradiance modified MCP into their tubes

Laser Test Goals Develop useful flexible laser test facility Study properties of MCP-PMT’s Optimize electronics  Some issues to address: 1)How does timing depend on gain ? 2)What is minimum gain for 10 pe’s? Need to validate low gain operations. 3) What is maximum rate at which tube can operate? 4)Evaluate amp/CFD/TDC choices at detector working point 5) Eventually lifetime tests 1010/14/2009Andrew Brandt UTA

LeCroy Wavemaster 6 GHz Oscilloscope Laser Box Hamamatsu PLP-10 Laser Power Supply Andrew Brandt UTA1110/14/2009 laser lenses filter MCP-PMT beam splitter mirror PTF Picosecond Test Facility featuring Undergraduate Laser Gang (UGLG) Undergraduate Laser Youths? (UGLY) Typically use 405 nm laser diode also have 632 nm laser head

10  m Laser Setup with Reference Tube (3/17/09) Reference Tube (~6 ps) Andrew Brandt UTA EE Meeting1211/16/2009

Andrew Brandt UTA Timing vs Gain for 10 pe’s (10  Burle) Measured with reference tube using CFD’s and x100 mini-circuits amps, with 10 pe’s can operate at ~5E4 Gain (critical for reducing rate and lifetime issues) 13

Further 10 pe Timing Studies 14 Providing sufficient input voltage to CFD leads to improvement in CFD resolution: now gives negligible contribution to total resolution. Varying exact details of amplifiers attenuators, etc. can affect results by a few ps (at low gain ~25 ps for 405 nm)

10/14/2009Andrew Brandt UTA15 Timing vs. Number of PE’s

Wait a Minute! Jerry Va’vra has measured 32 ps for TTS (SLAC-PUB-13573) so we should have about 10 ps (32/  10 for 10 pe’s! ) This is true only if you ignore 2 nd backscattering peak! We are modeling effect of recoil electrons on timing 7/14/2009Andrew Brandt UTA Prague AFP Meeting16

UTA Transit Time Spread for Burle 64 Channel Planacon (10  m pores) Increase filter until only 1/10 events have a signal, isolates 1 pe. Time difference with respect to reference tube 7/14/200917Andrew Brandt UTA Prague AFP Meeting

10/14/2009Andrew Brandt UTA18 Current/area for 10  m Tube Last 2 points are 0.4 and 2.0 μA/cm 2 ; we need to reach about 3 μA/cm 2 at Photonis has made Planacon with 10x higher current capability which would meet our rate requirements (even with saturation we still obtain the same time resolution!!!)

New Multi-Channel Laser Setup 10/14/2009Andrew Brandt UTA19

Rate Tests with Multiple Pixels Hit 10/14/2009Andrew Brandt UTA20 No rate dependence on number of pixels hit (that’s a good thing!)

Beam vs Fiber Fiber timing not as good, but allows us flexibility for some characterization tests

If single fiber gives 35 ps then 4 fibers should give 17 ps; but note that with many fibers plugged in, individual pixel gets light leaking from neighboring channel, need to test that this effect is reproduced in test beam SQRT(N)? From averaging time of four measurements on event-by- event basis

SQRT(N)? 10/14/ Measure time difference of three separate fibers (100 pe’s) w/respect to reference tube, correct for T0 offset, average and take new time difference w/respect to reference tube (expect about 9.5 get 10.3 ps ) Andrew Brandt UTA

Fast Timing Summary Have tested detectors and electronics chain capable of ~10 ps timing Have developed flexible laser facility (PTF) R&D still in progress to optimize all components PMT lifetime is an ongoing issue, but pursuing options with vendors that seem likely to provide solutions on 3 year timescale 10/14/2009Andrew Brandt UTA24