ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development.

Slides:



Advertisements
Similar presentations
C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
Advertisements

Nick Walker KEK-DESY meeting 7 th March 2005.
The ILC Global Design Effort Barry Barish ILC Industrial Forum Japan 28-June-05.
June 15, 2005Marc Ross (ILC) – Instrumentation Development ILC Instrumentation Development Marc Ross, SLAC.
Overview of ILC Plans D.Rubin April 17, D. Rubin2 ILC R&D Activities and Plans 1.Positron Source 2.Damping Ring 3.Low Emittance Transport - damping.
Progress towards nanometre-level beam stabilisation at ATF2 N. Blaskovic, D. R. Bett, P. N. Burrows, G. B. Christian, C. Perry John Adams Institute, University.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
Plan for the summer Nobuhiro Terunuma, KEK ATF day: ATF Collaboration Meeting European Linear Collider Workshop ECFA LC2013, May 28,
AS Diagnostic Collaboration Mark Boland
Overview of the ILC and SRF Program (With an emphasis on Px) Shekhar Mishra ILC & SRF Program Fermilab.
Accelerator R&D on LC - Activities of ATF & STF - 1. Introduction 2. ATF 3. STF 4. Summary Seiya Yamaguchi, KEK The US/Japan Collaboration in High Energy.
Personal strategy for ATF2 beam operation in 2009 Toshiyuki OKUGI 2009 / 7 /22 ATF2 weekly meeting.
November LCWS08 S. Fukuda 1 KEK HLRF Status and S1- global S. FUKUDA KEK.
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
What’s been Achieved and What’s to be Done K. Yokoya ILC Annual Meeting 2012/12/20 ILC Annual, Yokoya1.
UK/EU Plans for ATF2 G.A. Blair ATF2-IN2P3-KEK kick-0ff meeting, Annecy, 8 th October 2006 Overview EUROTeV UK.
F Status and Plans for SRF Facility Sergei Nagaitsev May 18, 2007.
STF Plan & Schedule H. Hayano, KEK. Superconducting RF Test Facility Comprehensive Test Facility dedicated to ILC SC-RF R&D (expandable to FEL, ERL) for.
STF Status and Future plan H. Hayano, KEK, LCWS12 Arlington System Test session 1.
TTF-II Status & Prospectives Nick Walker DESY 5 th ITRP Meeting – CALTECH.
STF plan overview H. Hayano, KEK LCPAC 02/25/2005.
STF status Mar.22,2005 H. Hayano, KEK. STF Phase 1 Test Accelerator DC gun : 200kV CsTe photocathode for quick start UV(262nm) Laser (337ns spacing, 2820bunches)
ILC WG2 (Main Linac System) status & report H. Hayano, KEK.
July 25, 2007 Fermilab ILC School Americas Slide 1 ILC Test Facilities Sergei Nagaitsev Fermilab.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
Development of a Low-latency, High-precision, Intra-train Beam Feedback System Based on Cavity Beam Position Monitors N. Blaskovic Kraljevic, D. R. Bett,
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
F Photoinjector for the ILC test facility at Fermilab Sergei Nagaitsev Fermilab May 24, 2007.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
ATF2 Kiyoshi KUBO Accelerator Test Facility (ATF) at KEK ATF – Designed as a prototype of damping ring and injector of LC – Achieved low vertical.
Status of ILC Activity in KEK H. Hayano, KEK APPI 03/10/2005.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
Greeting for 10 th ATF2 project and TB/SGC joint meeting 1.
Meeting of the European Global Design Effort Report from INFN non EU-funded R&D Carlo Pagani University of Milano and INFN DESY, 10 May 2006.
Status of ATF Collaboration The unique test facility for ILC with a low emittance beam. Junji Urakawa, KEK LCPAC at KEK
1 H. Hayano ATF Status June/2004 H. Hayano ATF: emittance status beam study status plan nm-project collaboration & plan ATF review 6/17/2004.
Future ATF Plans beyond JFY2012 (From JFY2013) After this, we have to submit final proposal to KEK directorates in May The approval process at KEK.
International Linear Collider Technology: Status and Challenges Steve Holmes Fermilab Wine & Cheese Seminar September 24, 2004.
5 Nov. 07 CCAST, IHEP Global Design Effort 1 ILC accelerator related R&D in Japan K. Yokoya KEK CCAST ILC Accelerator Workshop, IHEP, Beijing, Nov
Progress and Plans for R&D and the Conceptual Design of the ILC Main Linacs H. Hayano, KEK PAC2005 5/18/2005.
General remarks: I am impressed with the quantity and quality of the work presented here and the functioning of the organization. I thank ILC and FNAL.
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake.
ILC R&D at KEK Beam Control Technology –ATF –ATF2 Acceleration Technology –High-gradient Cavities L-band R&D Stand –Linac System  STF –Construction of.
ATF status M. Ross October 15, 2004 The ATF is the largest test facility built exclusively for linear collider RD –Utility not reduced by the selection.
Accelerator Activities at Spain Madrid CIEMA T CMAM Valencia IFIC Bilbao ESS Barcelona ALBA UPC Sevilla CNA 1 PAC-ILC May 2010.
TESLA Linear Collider project overview and linac technology R. Brinkmann, DESY ITRP Meeting, RAL Jan. 28, 2004.
John Adams Institute Frank Tecker Linear Colliders Frank Tecker – CERN Linear Colliders Lecture 3 Subsystems II Main Linac (cont.) RF system and technology.
26 Apr. 07 ILCSC-MAC, FNAL Global Design Effort 1 Asian R&D Activity and Resources K. Yokoya KEK ATF/ATF2, STF KEK budget Korea, China, India.
1 Experiments with pulse supplies and strip-lines at ATF, Plans for fast extraction kicker for ATF2 1. Fast Kicker R&D at ATF 2. Instrumentation at ATF.
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
1 1 H. Hayano and ATF group ATF Status August/2004 H. Hayano and ATF group Multibunch emittance Instrumentation developments Plans for run Multibunch.
ISG – Damping Ring Physics and Design Group ATF – 2003// focus on the TRC challenge Marc Ross – 1.Instability about which little is known: Fast ion,
Overview of progress at FONT Neven Blaskovic TMD technologies CASE student John Adams Institute Oxford University.
International Collaborations: DAE-DOE Discovery Science Collaboration Shekhar Mishra, PIP-II MAC Review March 9-11, 2012.
Nan Phinney SLAC ILC Worldwide Event, Fermilab, June 12, 2013 (Many slides courtesy of Marc Ross, Akira Yamamoto, Barry Barish) ILC Accelerator A 25-year.
WP5 Elliptical cavities
ILC-Americas Regional Team Review
Evolving an ILC focused SCRF Facility from the XFEL Infrastructure
Oversea collaborators
Junji Urakawa (KEK) for ATF International Collaboration
Progress towards nanometre level beam stabilisation
Electron Source Configuration
Nick Walker (DESY) EU GDE Meeting Oxford
The Proposed Conversion of CESR to an ILC Damping Ring Test Facility
CLIC damping rings working plan towards the CDR
Instability measurement plans at ATF
Presentation transcript:

ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development

Superconducting Linac Development(1) Cavity Development 2 types of cavities being developed in parallel together with their couplers and tuners LL-type (ICHIRO) –possible higher gradient –single-cell tests showing high gradient >40MV/m TESLA-like –coupler / tuner improved from TESLA type Best result of TESLA-like cavity

Superconducting Linac Development(2) Module Development STF Phase1 –Module test –to be completed summer-autumn 2007 –2 cryostats each containing 4 TESLA-like cavities and 4 LL-type cavities ( 1 cavity each by end of March 2007) STF Phase2 –1 RF unit of ILC being planned –To be constructed in STF Infrastructure –Electro-polishing facility Main part ready in Apr.2007

Infra-structure for SC-RF production Cryogenic compressor Cryogenic liquefier Control Room Klystron Gallery For EP, Clean Room

Beam-handling Technology Development(1) ATF Construction started in 1991 as a damping ring prototype for X-band linear collider and achieved a vertical emittance ~2pm Vital test bench for tuning studies, beam dynamics studies, and instrumentation R&D International collaboration of many labs

2006 Activities at ATF ILC Fast kicker development. (3ns fast rise time) Extraction kicker replacement. (ILC-like 3 bunch extraction) DR BPM upgrade program. (<1micron resolution. SLAC,et.al.) Laser Wire at EXT-line. (fast scan wire for ILC. RHUL,et.al.) FONT experiment. (digital feedback. Oxford,et.al.) nm BPM experiment. (17nm resolution achieved. SLAC,KEK)

Beam-handling Technology Development(2) ATF2 Extension of ATF for R&D of ILC final focus system International collaboration –Europe (laserwire, feedback, stabilization) –US (design, power supply, BPM circuits) –Asia (magnets, BPM, etc) Get the first beam in late 2008