David Hitlin EMC R&D Meeting April 1, 2009 1 Responsibilities ItemResponsible institution/person LYSO crystal development, order optimization Forward EC.

Slides:



Advertisements
Similar presentations
1 David Hitlin Frascati SuperB Workshop March 17, 2006.
Advertisements

1 Status of the CMS Pixel project Lorenzo Uplegger RD07 Florence 28 June 2007.
Proton test facilities Uppsala, TSL, GWC, B-line (Blue hall): Energy ±0.80 MeV. Flux reduced from normal 2·10 8 s -1 to 900 s -1 with a profile as.
David Hitlin US/Canadian SuperB Meeting Sept. 3, EMC R&D for SuperB David Hitlin US/Canada Super B Meeting September 3, 2008.
Especially concerning optimization of identification power, energy resolution, efficiency, optimal readout device for the barrel part of CALIFA, a calorimeter.
Status of the Calorimeter Working group activities GSI, 16 th October 2007.
1 Raw Event : ByteStream implementation Muon Workshop, April 2002 A. Nisati, for the Muon Trigger group.
David L. Winter for the PHENIX Collaboration PHENIX Silicon Detector Upgrades RHIC & AGS Annual Users' Meeting Workshop 3 RHIC Future: New Physics Through.
The Design of Barrel Electromagnetic Calorimeter (BEMC) October Lu Jun-guang.
February 12 th, 2004 Heidelberg TPC Meeting J.B. TPC SECTOR TEST at T10 May 3 rd – June 2 nd MOTIVATION REQUIREMENTS STATUS OF SYSTEM TIME SCHEDULE CONCLUSIONS.
Development of New Detectors for PET Imaging at BNL DOE/JLAB Meeting Bethesda, MD May 20, 2004 Craig Woody Physics Dept Brookhaven National Lab RatCAPBeta.
M. Gilchriese ATLAS Upgrade Introduction January 2008.
Jiawen Zhang, IHEP, 2008, April 10, frascati Status of BEPCII/BESIII and Physics preparation Jiawen Zhang 2008/4/7—10 , PHIPSI08, Frascati.
Electron Spectrometer Work Package Simon Jolly 19 th May 2014.
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
A Silicon vertex tracker prototype for CBM Material for the FP6 Design application.
DESPEC A Algora IFIC (Valencia) for the Ge array working group.
Apollo Go, NCU Taiwan BES III Luminosity Monitor Apollo Go National Central University, Taiwan September 16, 2002.
CALICE / Silicon PM activities Detector and readout electronics development Development of a system for mass production of AHCAL “HBU” scintillator/PCB.
C. Kiesling, 1st Open Meeting of the SuperKEKB Collaboration, KEK, Dec , The DEPFET-Project: European Collaboration for a Pixel SuperBelle.
CMS ECAL End Cap WACH4, 28 Nov 2002 D Cockerill - RAL (1) - Yield, e/MeV with production crystals and production VPTs - Pre-calibration precision using.
B.G.Cheon Mini-Trigger/DAQ workshop,OCU ECL Trigger overview ByungGu Cheon (SKKU) Outline  ECL calorimeter  ECL trigger scheme & performance.
Peter Sharp CERN CMS Tracker Summary of the Tracking Trigger Working Group Peter Sharp 21 November 2008.
Activity related CMS RPC Hyunchul Kim Korea university Hyunchul Kim Korea university 26th. Sep th Korea-CMS collaboration meeting.
Blair Ratcliff, SLACUS R&D Meeting, Sept. 3, 2008 Blair Ratcliff SLAC Detector R&D: Overview and Opportunities Detector Overview (some old news!). Present.
CGEM-IT project and beam test program G. Felici for the FE-LNF-TO team Partially supported by the Italian Ministry of Foreign Affairs under the Program.
Slide 1 UCSB CDMS Group Neutron Trigger. Slide 2 UCSB CDMS Group Neutron Trigger PROGRESS: à Electronics Fabrication Complete for SN1 à Simulation Work.
Feb 24, Abnormal Events in HF: TB04, Simulation, and Feb.08 Fermi Testbeam Anthony Moeller (U. Iowa) Shuichi Kunori (U. Maryland) Taylan Yetkin (U.
Geant4 Tutorial, Oct28 th 2003V. Daniel Elvira Geant4 Simulation of the CMS 2002 Hcal Test Beam V. Daniel Elvira Geant4 Tutorial.
Forward Tagger Simulations Implementation in GEMC Moller Shield Tracking Studies R. De Vita INFN –Genova Forward Tagger Meeting, CLAS12 Workshop, June.
David Hitlin Frascati SuperB Workshop March 16/17, 2006 An EMC for Super B  With the likely time structure of SuperB, backgrounds and radiation damage.
The SuperB EMC Front End electronics Prototypes Valerio Bocci 2009 INFN sezione di Roma Valerio Bocci A. Papi, C. Cecchi, P. Lubrano (INFN Perugia) M.
CALOR 2008 Philippe Rosier – PANDA The Electromagnetic Calorimeter of the future PANDA detector P. Rosier Institut de Physique Nucléaire d’Orsay.
Eurisol DS, Task 11 meeting, Helsinki September‘07 Task 11.2: Fragmentation of post accelerated ISOL beams David Pérez Loureiro Universidad de Santiago.
G-2 Calorimeter test beam “ T-519 has been assigned beam time is from Thursday July 17 to Monday morning July 27 at ESTB” LCLS is operating lower beam.
April 27, 2004 ECAL meeting, Giessen A.Vinogradov Kurchatov Insitute, Moscow 1 PHOS APDs The APDs are very sensitive to Bias/Cooling variations within.
Detector Goals and General Syst. System Parallel Joint Parallel DGWG Mechanical Integ. TDR Organization System Summaries WORKSHOP Structure-Detector +
The SuperB EMC Front End electronics Prototypes
EMC front-end Electronics
Detector Status Francesco Forti, INFN and University, Pisa
Update: EMC R&D David Hitlin SuperB R&D Meeting September 25, 2008.
CERN meeting report, and more … D. Breton
Claudia Cecchi University of Perugia and INFN
The Lund R3B prototype: In-beam proton tests and simulations
Summary of the parallel session. Design and organisation
cooling and supports of the forward endcap EMC
Draft SuperB Organization Chart for TDR Phase
Mini-Trigger/DAQ workshop,OCU
superB Detector Workshop I University of Perugia and INFN
EMC front-end Electronics
Workshop Goals for the Detector Groups
IHEP group Shashlyk activity towards TDR
Update on mechanical structure for the ENDCAP calorimeter
SuperB EMC Computing Foreseen activities and software/computing needs
SuperB R&D Meeting David Hitlin February 14, 2008
EMC Electronics and Trigger Review and Trigger Plan
EMC Barrel Electronics Status
The Detector Status Overall progress Subsystem status
Dave Bailey University of Manchester
An alternative forward endcap calorimeter design
3rd Open Meeting of the Belle II Collaboration
ВОМР Подмярка 19.2 Възможности за финансиране
Споразумение за партньорство
Calorimeter Backgrounds
SVT – SuperB Workshop – Frascati Sept. 2010
R&D for SuperB detector
Electronics, Trigger and DAQ for SuperB: summary of the workshop.
Perugia SuperB Workshop June 16-19, 2009
The Effect of Filtering
Agenda modifications.
Presentation transcript:

David Hitlin EMC R&D Meeting April 1, Responsibilities ItemResponsible institution/person LYSO crystal development, order optimization Forward EC mounting structure Rear EC mechanical structure CsI(Tl) barrel refurbishment and modification Calibration system APD readout and preamps forward EC DAQ system Fast simulation GEANT4 simulation Beam test TDR chapter organization/editing

David Hitlin EMC R&D Meeting April 1, ItemContact person Mechanical design – forward EC Mechanical design – rear EC LYSO crystals APD readout package Electronics, DAQ & Trigger MDI and background Fast Simulation Full Simulation Contact persons

David Hitlin EMC R&D Meeting April 1, Beam test detailed schedule MilestoneDate Order LYSO crystals 0906 Test and characterize CMS APD packages Review design of TB structure Mount APD’s to crystals Complete TB structure Complete temp. control housing Complete DAQ system Insert crystals in structures and test In beam at Frascati