WP leaders meeting R. Aleksan October 5 th, 2009 TIARA 1.Objectives 2.WP management 3.General rules 4.Conclusion Work Packages.

Slides:



Advertisements
Similar presentations
1 Information and Publicity in programming period.
Advertisements

EURO EURO 1)Welcome 2)Status of negotiations and GA 3) “ of Consortium Agreement 4) “ of website, mailing lists, logo, etc 5)Management Structure 6)Bodies.
University of Trieste PHD school in Nanotechnology Writing a proposal … with particular attention to FP7 Maurizio Fermeglia.
TIARA: Status WP4 C. Omet, GSI 1.Update on WP members 2.Tasks 3.Meetings 4.Schedule 5.Status 14/06/2012TIARA Mid Term Meeting1.
Sustainable Energy Systems Overview of contractual obligations, procedures and practical matters KICK-OFF MEETING.
ASPERA-2 WP2: Extension of the network and update of the status of Astroparticle Physics  Objectives  Structure  Tasks  Milestones & Deliverables Kickoff.
Helsinki Sept 2007 S.Galés ERA-NET Supporting Cooperation for research infrastructures in all S&T fields 7 th FP Call Capacity Work Program: Infrastructures.
Chapter 3: The Project Management Process Groups
CLARIS NCT1 Management, coordination and dissemination activities J-P Boulanger (CNRS) and Carlos Ereño (UBA) (CNRS, CONICET, UBA, UR) k To manage the.
STRUCTURE SCIENTIFIC REPORT / MANAGEMENT REPORT Progress / objectives (WP and project level) Progress / milestones (WP and project level) Progress / deliverables.
Specific Programme Cooperation in FP7 - Proposal submission -
2 nd Steering Committee Meeting October 2008, Athens and Aegina.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Overview of EuCARD-2.
TIARA WP2 Report and wrap-up Final Annual Meeting R. Aleksan Nov. 27 th, 2013.
1 Framework Programme 7 Guide for Applicants
The Preparatory Phase Proposal a first draft to be discussed.
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
Coordinating EC Research Projects Paul Drath Singleimage Limited 3 Foundry Walk St Ives Cambs PE27 5FW phone fax
APPLICATION FORM OF ROBINWOOD SUBPROJECT SECOND STEP 1. The short listed Local Beneficiaries work together to create international partnerships and prepare.
Reporting Guidelines (FP5) Karen Fabbri Scientific Officer Natural & Technological Hazards DG Research European Commission Brussels
EPOCA – 11. June EPOCAConsortiumOrganisation.
WP1 – Project management EuroVO-ICE– First review – 26 October 2010 Françoise Genova, EuroVO-ICE coordinator,1 WP1 Management.
Project Reporting for the EuCARD Integrating Activity Project Based on: - Provisions of the Grant Agreement (GA) and its annexes - FP7 Guide on Project.
1 NOT LEGALLY BINDING Energy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007 International Co-operation FP7 Energy Theme Energy EU-Russia Call European.
Dunstaffnage Marine Laboratory Oban, Argyll, Scotland PA37 1QA ECASA Kick-off Oban 8-9, December 2004.
“Thematic Priority 3” Draft Evaluation of IP + NoE.
ESTELA Summer Workshop, 26 June 2013 The EU-SOLARIS project.
HL-LHC FP7 DS Status of the proposal Lucio Rossi - CERN 3rd General Meeting for application preparation – CERN 20 October.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt CBM Collaboration meeting Status Interim MoU J. Eschke, GSI.
SLHC – PP Management Plan April 3 rd, 2008 M. Capeans, M. Ropka CERN April 3, 20081M.C.
TIARA kickoff R. Aleksan February TIARA 1.WP2 objectives 2.Deliverables 3.Who does what 4.Organization matters 5.Conclusion
1 Direction scientifique Networks of Excellence objectives  Reinforce or strengthen scientific and technological excellence on a given research topic.
1 ASTRONET Coordinating strategic planning for European Astronomy.
Writing the Proposal: Scientific and technological objectives PHOENIX Training Course Laulasmaa, Estonia
Consortium building PHOENIX Training Course Laulasmaa, Estonia
IDARI Workshop, Tartu, June 2005 NUI Galway Work Package 4 Administration Lorna Ryan The IDARI project is financed under the FP5 Quality of Life and Management.
S 1 Annual Meeting 2013 Management and reporting (WP6) Chiara Bearzotti NACLIM project manager.
STRUCTURE SCIENTIFIC REPORT / MANAGEMENT REPORT −Progress / objectives (WP and project level) −Progress / milestones (WP and project level) −Progress /
Project Management Birutė Markevičiūtė Joint Technical Secretariat Lead Partner Seminar 13 October 2008, Riga.
Project management and communication structure Nataša Urbančíková Faculty of Economics Technical University of Košice.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
10 February “FP6 Networks of excellence” Colette Renier Research DG.
WP4 – Cloud Platform & Provisioning Technical Review Period 1 This document produced by Members of the Helix Nebula consortium is licensed under a Creative.
Mathias DEPRETZ – EuroVO-DCA Project Manager Work Package 1 – Management First Board Meeting – 2&3 october 2006 WP1 Management EuroVO-DCA Project FIRST.
JRA1 Activities Administrative issues –Financial accounting system established at DESY Based on SAP, traces all WP`s in JRA Based on EXEL, traces all cost.
TIARA – WP6 Involving Industry in TIARA Lucio Rossi (WPD) CERN.
Fabrizio Gagliardi EGEE Project Coordinator EGEE is proposed as a project funded by the European Union under contract IST
Presentation of Work Package 6 (WP6) “Design and implementation of Dissemination Activities” MATcHES Kick-off meeting Feb 2014 Ruse, Bulgaria TEMPUS BG-TEMPUS-JPHES.
Consumers, Health, Agriculture and Food Executive Agency 3rd Health Programme The Electronic Submission System (JA 2015) Georgios MARGETIDIS.
SC meeting R. Aleksan February 11 th TIARA 1.General Information 2.Final Budget 3.Meeting Objectives 4.Organizational matters 5.Kickoff meeting 6.Conclusion.
WP leaders meeting R. Aleksan October 5 th, 2009 TIARA 1.Objectives 2.General Context 3.Building TIARA 4.Conclusion.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
GC meeting R. Aleksan February TIARA 1.Meeting objectives 2.General Information 3.Final Budget 4.Consortium Agreement 5.Next meetings 6.Conclusion.
TPB meeting R. Aleksan November 2 th, 2009 TIARA-PP 1.Objectives 2.Deliverables 3.Schedule Work Package 1.
TIARA-PP Governing Council 1 representative per contractor TIARA-PP Coordinator Industry advisory committee? Project Management (WP1) Project Office Dissemination.
11/19/ Third Meeting of the EuCARD Steering Committee 1 EuCARD Management Report J.P. Koutchouk, S. Stavrev for the Coordination Office.
AMICI WP1 – Management, coordination and dissemination
Writing LIFE Integrated Project
Innovative Training Networks
TIARA TIARA website: General Information
TIARA Executive Office
Funded by the Erasmus+ Programme EPP JO-EPPKA2-CBHE-JP Lina Tsakalou
BioMedBridges – Work Packages 2 & 12
FP7 SCIENTIFIC NEGOTIATIONS
Information session SCIENTIFIC NEGOTIATIONS Call FP7-ENV-2013-two-stage "Environment (including climate change)" Brussels 22/05/2013 José M. Jiménez.
Information session SCIENTIFIC & TECHNICAL NEGOTIATIONS Call FP7-ENV-2013-WATER-INNO-DEMO "Environment (including climate change)" Brussels 24/06/2013.
AMICI WP1 – Management, coordination and dissemination
ANTICORRP ANTICORRP General Assembly Meeting Administrative update
Presentation transcript:

WP leaders meeting R. Aleksan October 5 th, 2009 TIARA 1.Objectives 2.WP management 3.General rules 4.Conclusion Work Packages

In TIARA, 3 categories of WP 1. Management of TIARA-PP 2. General TIARA issues 3. Specific R&D infrastructure issues We have To define the work plan of each WP with clear objectives, deliverables, milestone and time schedule  To define the work plan of each WP with clear objectives, deliverables, milestone and time schedule To ensure the complementary of the WPs and their proper interconnection in order to form an overall coherent proposal  To ensure the complementary of the WPs and their proper interconnection in order to form an overall coherent proposal To define who does what and to estimate their cost  To define who does what and to estimate their cost Write down a convincing description of all of the above  Write down a convincing description of all of the above Objectives

WP management WP-PE  WP-leaders WP-DE  WP-deputy WP-PC  WP- PC Time is short!Need to be pragmatic and efficient Identify (in consultation with TPB) 1.WP-Principal Editor 2.WP-Deputy Editor 3.Participant Contacts Proposal: responsible WP-PE is responsible to define, cost and write the work plan close interaction in close interaction (as deemed appropriate) with its deputy(ies) consultation in consultation (as deemed appropriate) with participant contacts If proposal is successful, Normally: All WP leaders will be members of the TIARA steering committee

TIARA management (cont’d) WP-leaders: General WPs R. Aleksan WP2: R. Aleksan (CEA, F) O. Brüning WP3: O. Brüning (CERN, Int.) F. Cervelli WP4: F. Cervelli (INFN, I) P. Burrows WP5: P. Burrows (STFC, UK) W. Singer WP6: W. Singer (DESY, DE) Candidate Specific WPs (proposed by the projets) E. Jensen WP7 (CLIC): E. Jensen (CERN, Int.) K. Long WP8 (n-facility): K. Long (STFC, UK) M. Biagini WP9 (Super-B): M. Biagini (INFN, I) P. Bousson WP10 (EURISOL): P. Bousson (CNRS, F) Contact me for WP Deputies and contacts names

TIARA management (cont’d) General rules for writing the WP sections WP number1Start date1 WP TitleMaNaGeMent of the consortium Activity TypeMGT Participant number 1 Participant short name CEA Person- months 90 Objective: Management of the TIARA consortium Example of document to be filled; WP1

TIARA management (cont’d) Description of work The coordinator will be the single point of contact to the EC. The coordinator will provide the annual reports on the activities of the consortium and take care of the financial statements. The Coordinator will provide the Consortium Agreement and obtain the signatures of all participants before the beginning of the project. The coordinator reports to the bodies of the Consortium, in particular to the Governing Council, the representation of the participants. The coordinator maintains direct contact with the national authorities and funding agencies whenever needed to ensure a proper communication and their awareness of the development of the work. The coordinators will establish link with others majors partners in the field of accelerator science in the other regions of the world. The coordinator will be in charge of organizing general events and ensuring that the objectives, the status and achievements of TIARA, and its importance within the European and the world of science and research, is widely disseminated to the relevant communities and as well as the general public in the European Union, and their governments, in as many languages of the EU as is practicable. The work in this WP will be structured in 2 tasks as detailed below Task breakdown Task Num Short Name Description 1.11_CoCCoordination of the Consortium 1.21_DaODissemination and Outreach

TIARA management (cont’d) Deliverables (brief description and month of delivery) NumNatShort nameDescriptionmonth 1.1OConsAgrmntConsortium Agreement between participants ready (task 1.1) 0 1.2OContractContract of the Consortium with the EC signed (task 1.1)1 1.3OWebSiteWeb Site Frame ready with all functionalities (task 1.1)3 1.4OKickMeetOrganization of Kickoff meeting (task 1.1)3 1.5OFinMeetOrganization of Final General Meeting (task 1.1&1.2)35 1.6RFinRepFinal Report delivered (task 1.1&1.2)36 Milestones NumNatShort nameDescriptionmonth 1OWebSitePreliminary Web Site Frame set up (task 1.1)0 2OMidMeetOrganization of Mid term General Meeting (task 1.1&1.2)16 3RMidRepMid term Report ready (task 1.1)18 In addition a Gantt chart is requested

TIARA management (cont’d)  Gantt chart : proposed tool = MS project  Limit the number of deliverables to the minimum needed, it is preferable to have milestones, showing that we will follow closely the work.  Text for the description of the work: about 1 page, in any case 2 pages max.  Proposed Manpower rules For WP3, 4, 5, 6 WP leader: 25% FTE (i.e. a total of 9 person-month) WP deputy (ies): a total of 20% FTE ( i.e. a total of 7.2 person-month) WP 2 will have a bureau with 4 persons (14.4 person-month) WP contacts: 10% FTE (i.e. a total 3.6 person-month) per participant contact Most of the cost will be manpower and travels  Proposed expense rule per travel: 800€ (ticket=500€+ 2 days at 150€) For WP7-n WP leader: 20% FTE (i.e. a total of 9 person-month) WP deputy (ies): a total of 10% FTE ( i.e. a total of 7.2 person-month)

TIARA management (cont’d) WPLWPDWPC p-mtravelp-mtravelp-mtravel WP WP WP WP WP WP WP WP WP WP Other specific resources may needed depending of WP Ex. WP2 will need people for legal and financial matters

TIARA management Milestone&schedule DateDeliverableResponsible persons 25/9/2009Finalization of the Proposal Editing Group Coordinator 2/10/2009Formation of Editing Group for each WP WP PE 5/10/2009Meeting of Proposal Editing Group (Coordinator+WP leaders) Coordinator+WP PE Presentation of Draft Structure of the WP sections for the proposal WP PE 12/10/2009Initial version of the WP sections for the proposal, including detailed description, task breakdown, list of deliverables and milestones, Gantt chart WP PE Initial version of the general sections for the proposal Coordinator 14/10/2009Meeting of Proposal Editing Group (Coordinator+WP leaders) Coordinator+WP PE 28/10/2009Advanced WP documents, (description, task, deliverables, milestones, Gantt WP PE 2/11/2009Meeting of TIARA Contractors + Proposal Editing Group (Coordinator+WP leaders) Contractors + Coordinator+WP PE 9/11/2009Final WP documents, including description, task breakdown, list of deliverables and milestones, Gantt chart WP PE 16/11/2009Meeting of Proposal Editing Group (Coordinator+WP leaders) Coordinator+WP PE Initial integration of the full TIARA proposal Coordinator 23/11/2009Reserved date for meeting of Proposal Editing Group (backup; will be used in case of crisis) Coordinator+WP PE 25/11/2009Final integration of all section of the proposal ready Coordinator Initial Electronic submission of TIARA-PP Coordinator 2/12/2009Final minor correction & Final Electronic submission of TIARA-PP Coordinator

Conclusions Accelerator science could be a powerful mean toward scientific, technical and industrial breakthroughs… i.e toward building a society and economy of knowledge With TIARA TIARA is on the way to develop an ambitious structure, which is aiming at strengthening accelerator R&D is a sustainable and comprehensive way The challenge is huge!!! We have now a lot of work ahead of us to make a strong proposal for FP7 Preparatory Phase It will require strong commitment from all of us

TIARA management (cont’d) Management perimeter of TIARA (deliverable 1, Report)  Term of reference (mandate, domain of competence, scientific and technical perimeter (field, type of infrastructures, R&D programme)...)  Expertise, Term and Location of central coordination Determination of structural needs to achieve TIARA objectives (deliverable 2, Report)  For addressing scientific and technical issues (with inputs from WP3 and WP4)  For addressing education and training aspects (with inputs from WP5)  For handling legal, financial and administrative matters  For enabling efficient dissemination and outreach Implementation of TIARA (deliverable 3, Report)  Overall legal structure of the central coordination (need to include EC in the work) including reporting and organization chart  Financing model and engineering for supporting TIARA activities (infrastructures, R&D programs, education&training, collaboration with industry)  Interactions with other bodies (NuPECC, EUROFEL…)  Impact of TIARA and related indicators… WP2