City of Buda ElectroPurification Water Supply Evaluation Drew Hardin, PE Council Workshop - January 20, 2015.

Slides:



Advertisements
Similar presentations
Rivanna Water & Sewer Authority Community Water Supply Plan Update Public Meeting Monticello High School September 21, :00 pm.
Advertisements

Short-Term Alternatives for City Offices. Background and History Citys current lease for City Marketplace offices ends October 31, 2014 For 22,221 square.
Wakulla County Sewer Project Eutaw Utilities Presentation April 7, 2011.
DREDGING YOUR DOCKS 2013 Supported by: USACE Galveston District U. S. Coast Guard Sabine Neches Navigation District.
City of Farmersville, Texas Water and Wastewater Rate Study February 2011.
1 Water and Wastewater System Information. 2 PWCSA Water Purchase Key Points From April 21, 2008 Meeting With PWCSA PWCSA is willing to re-open discussions.
Brushy Creek Municipal Utility District Water Facility Project Status Update Presented at April 9, 2009 Board Meeting Joseph Jenkins, P.E., CH2M HILL.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
 Why  Project Status  Future Course Lime Sludge Biosolids Water/Wastewater System Life Cycle Raw Water Wells (12) Water Treatment Plant Storage Tanks.
1 TOWN OF NEWMARKET FLOODING ON SEPT. 13, 2006 Committee of the Whole February 5, 2007.
Utilities Planning Group UPCOMING REQUESTS FOR PROPOSALS Larry Tunnell, PE, PG Chief Engineer.
12” Segment “A” 12” 16” Rockin J (Rancho del Lago) HH RANCH PROPERTIES, L.C. Request for TWA Wholesale Water GLENBROOK PARTNERS, LTD. Request for TWA Wholesale.
DREDGING YOUR DOCKS 2012 Organized By CRA Hydrographic Surveyors Orion Marine Group.
Colorado Springs’ ASR Program Presented by Cortney Brand Western Water Workshop, Gunnison, CO July 28, 2005.
2007 Idaho Climate and Water Forecast Workshop Sponsored by: Climate Impacts Group at the University of Washington and the Idaho Department of Water Resources.
HAYS CALDWELL PUBLIC UTILITY AGENCY ENSURING WATER FOR COMMUNITIES AND OUR ECONOMIC FUTURE HAYS COUNTY HOMEBUILDERS ASSOCIATION Graham Moore, P.E. March.
Overview and Project Approach  Clinton is currently experiencing surface water supply shortages in their raw water source, Clinton Lake, and has been.
United Water & Sanitation District Stonegate Village Metro District Water Supply Opportunities 1.
Public Transit Department Bus and Fuel Procurement Strategy AzTA/ADOT Transit Conference April 2013.
Equus Beds ASR Program – Wichita’s Future Water Supply September 6, 2012.
Imagine the result Impact Study on MSD Rate Payers of Proposed Consolidation/Merger Phase II – Towns of Biltmore Forest, Montreat and Weaverville Presentation.
Southern Delivery System NSPE-Colorado State Meeting February 19, 2010.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
Independent Review of FY 2008 Proposed Rates D.C. Water and Sewer Authority Public Hearing June 13, 2007.
N. Burleson St. – Status Update I. Typical Sections & Pavement Design II. Budget and Preliminary Cost Estimates III. Schedule S EPTEMBER 16, 2014.
Monterey Peninsula Water Supply Project April 23, 2012.
Western Water Issues: The Challenges of Growth NARUC Water Committee Summer Meetings July 2008, Portland, Oregon Walton Hill, United Water.
LCWDBoardMtg_ pptx/1 LCWD Board Meeting January 14, Carneros Avenue, Napa Los Carneros Water District.
Demand Response: Keeping the Power Flowing in Southwest Connecticut Presented by: Henry Yoshimura Manager, Demand Response ISO New England September 30,
SOLAR vs. PG&E OVERVIEW OF TOPICS Last 15 years of PG&E rates. Solar/PG&E rates. PPA: Pros and Cons. Benefits of going Solar/Rebates Shade structures &
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Policies and procedures for developing acquisition plans; determining whether to use commercial or Government resources; whether it is more economical.
Hays Trinity Groundwater Conservation District Education and Technology “a role for today, a goal for tomorrow” Commissioners Court Presentation.
Rulemaking for Central Florida Coordination Area Coordinated Rulemaking by the South Florida, St. Johns River and Southwest Florida Water Management Districts.
Broad Beach Sand & Dune Habitat Restoration Project Broad Beach Revetment Owners August 29, 2015.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASIBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
Equus Beds ASR Program A Case Study in Success Texas Innovative Water 2010 Seminar October 11, 2010 Texas Innovative Water 2010 Seminar October 11, 2010.
Adjusting Supply and Demand: Technical Analysis to Support the ESPA Management Plan Idaho Water Resource Board Meeting May 17, 2007.
City of Palm Coast, Florida City Council Meeting October 2, 2012.
OPTION 9 CO 2 PLANT PROCESSING Description: Operate the existing Castle Valley CO 2 plant to process the Price area coal-seam gas. Plant can processes.
Northeast Corridor Greenway Acquisition Project – Design and Permitting Status Update City Council Workshop August 25, 2015.
1 Public Hearing User Rate Adjustments April 8, 2008.
Sonoma Valley Groundwater Management Planning. 2 Presentation Overview SCWA/USGS Groundwater Study Stakeholder Assessment Groundwater Management Work.
Withlacoochee Regional Water Supply Authority Final Water Supply Plan Update July 2014.
Water System Master Plan & Rate Study City of DeKalb, Illinois City Council Presentation May 16, 2015.
Potential Consolidation of WMWD’s Murrieta Division into EMWD April 15, 2015 Paul D. Jones II, P.E. General Manager, Eastern Municipal Water District
EASTERN MUNICIPAL WATER DISTRICT County Water Company Consolidation Project Greg Kowalski, P.E. Senior Civil Engineer April 1, EXHIBIT.
June 17, 2015 (Regina) June 18, 2015 (Saskatoon) SaskEnergy 2015 Rate Application.
1 EASTERN MUNICIPAL WATER DISTRICT Water Supply Strategic Plan Brian Jack Powell, P.E. Director of Planning June 17, 2015.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Recycled Water Pipeline Joe Mouawad Sr. Director of Engineering September 2, 2015.
1 Energy/Compost Facility Action Plan City Council Meeting July 2, 2012.
SEWER TRUNK LINE REHABILITATION PROJECT (Alexandria Place, Black Oak and Navy Drive) COUNCIL AGENDA ITEM 14.1.
1 EASTERN MUNICIPAL WATER DISTRICT Cactus II Feeder Transmission Pipeline Joe Mouawad, PE Sr. Director of Engineering September 2, 2015.
Planning Commission Work Session February 19, 2015.
HAYS CALDWELL PUBLIC UTILITY AGENCY HAYS COUNTY COMMISSIONER’S COURT WORKSHOP JULY 22, 2014.
Presentation to CITY OF PALM COAST, FLORIDA FINANCIAL FORECAST AND CAPITAL FACILITIES FEES ANALYSIS Prepared in Conjunction With the Utility System Revenue.
1.  Quick Overview of the History and Need  What is Planned for the Fire Department  What is Planned for the Police Department  Financial Details.
1 | emwd.org Indirect Potable Reuse (IPR) Public Outreach and Preliminary Design Services Joe Mouawad, P.E. and Jolene Walsh August 11, 2016.
Strength through History & Innovation City of Beaumont Salt Mitigation Feasibility Study Summary of Findings.
STOCKTON DELTA WATER SUPPLY PROJECT (DWSP) Final Environmental Impact Report (EIR) Certification Hearing November 8, 2005 Mark J. Madison, Director Municipal.
CHANNEL ISLANDS BEACH COMMUNITY SERVICES DISTRICT
CONGAMOND ROAD ROADWAY IMPROVEMENT INFORMATIONAL MEETING
Irvine Ranch Water District Distributed Energy Storage Case Study
Water & Sewer Rates Workshop
Joshua Basin Water District Draft Findings & Rate Scenarios
Joshua Basin Water District Revised Rate Recommendations
Brackish Water Desalination Project
Biltmore C Proposed Water & Sewer Improvement Project
PWO 13 Freeway Well Planning Project
Presentation transcript:

City of Buda ElectroPurification Water Supply Evaluation Drew Hardin, PE Council Workshop - January 20, 2015

Key Discussion Points Water Supply Needs & Strategy Electro Purification - Review –Background –Sustainability / Impacts –Cost September 29 Council Meeting - Recap Electro Purification - Contract Terms Status Update – HCPUA Kyle / Buda Pipeline Action & Next Steps

Water Supply Needs & Strategy 2.0 MGD 5.6 MGD 3.6 MGD Existing Supply Future Need (2060) Deficit (2060) HCPUA Interim: 1.5 to 2.0 MGD (2017) Permanent: 3.6 MGD (2027) Electro Purification: 1.0 MGD Factor of Safety 2 nd source by 2017 Delay HCPUA Permanent Safety Factor Year Needed 2017 to 2020

Private Wholesale Water Supplier Water Source: Trinity – Cow Creek Formation Maximum Projected Production: 5.0 to 6.0 MGD Other Users: –Goforth: 3 MGD –Clark Wilson: 1.3 MGD Delivery Point: Kohler’s & FM 1626 (Utilizes HCPUA Pump Station/ Pipeline) Three alternative delivery points Identified 4 Electro Purification - Background EP HCPUA

EP Water - Considerations Viability Sustainability & Impact Cost of Service

EP Water - Considerations EP has some history developing water supplies in TX Trinity Aquifer is viable water source at this location. 3 Test Wells = 1.99 MGD. Limited safety factor included by EP. Independent review projects approx. 25% less. Additional wells required to produce > 3 MGD (Goforth). Production of future wells unknown. Water quality does vary significantly between 3 test wells - blended water quality of existing and future wells unknown. No current jurisdictional/permitting limitations at this time. Schedule for delivery of water = 2 to 3.5 years. Viability

EP – Impact to Wells Approximately 30 wells within 4 miles of EP well field may be completed in or close proximity to the same producing formation (Cow Creek formation) Approximately feet of artesian pressure decline may be experienced in some of these wells If pumps are set deep enough, supplies will likely still be obtainable with small increases in lift cost 7 Sustainability

EP – Impact to Springs Cow Creek Springs –Jacob’s Well Spring – 6 miles west of EP wells –Pleasant Valley Spring – 11 miles west of EP wells –Likely no effect to very diffuse effect over long-term, springs likely disconnected to EP wells due to faulting Edwards Springs –Spiller Ranch Spring – 10 miles northeast of EP wells –No effect 8 Sustainability

Exist vs Future Pumpage Sustainability

Nearby Well Hydrographs Sustainability Top of Cow Creek: ~670 feet MSL Top of Cow Creek: ~230 feet MSL

$137 $113 $123 EP Water - Considerations Cost

September 29 Council Meeting Council Action: Move forward with EP to secure 1.0 MGD water supply Follow-up: Discuss with HCPUA potential for shared facilities Negotiate terms of contract with EP for 1.0 MGD water.

EP Contract Terms Article 1 – Investigation Phase (Option Period) Article 2 – Reservation & Construction Periods Article 3 – Reservation & Supply of Water Article 4 – Fees, Billing & Payment Article 5 – Metering Article 6 – Regulation of Groundwater Article 7 – Indemnity & Force Majeure Article 8 – Term of Contract Article 9 - Seller’s Other Contracts Article 10 – Default & Remedies Article 11 – Notices Article 12 – General Terms

EP Contract – Article 1 & 2 Contract Requirements Go Into Effect OPTION PERIOD (9 Months) Buda Requirements Independent Verification EP Requirements Quantity Testing – Prove up 5.65 MGD Quality Testing – Meet TCEQ standards WATER DELIVERY (Term: 30 Years) Buda Requirements Reservation Fee (0.50 MGD): $65,700 Take or Pay Fee (0.50 MGD): $593,125 Total Year 1: $658,825 Kyle/Buda Pipeline by HCPUA required. EP Requirements Delivery 0.50 MGD, Year 1 Escalates to 1.0 MGD over 5 years Water Quality – Chlorine + TCEQ requirements CONSTRUCTION PERIOD (Up to 18 Months) Buda Requirements 18-month notice to construct Reservations Fees: $131,400/yr EP Requirements Construct ALL facilities to Delivery Point Acquire ALL easements RESERVATION PERIOD (Up to 5 Years) Buda Requirements Reservation Fees: $131,400/yr EP Requirements None

EP Contract – Articles 3, 4 & 8 Costs decrease over the Term of Contract Cost Performance Index (CPI) escalation added after year 1 to account for inflation. Rates will change if Alternative Delivery Point selected Buda may resale water at own discretion. EP will deliver additional water to Buda if available Groundwater District fees in future would be passed through to Buda Neither party can assign contract without approval. Term is for 30 years with 10 year renewable

HCPUA – Kyle/Buda Pipeline Facilities: –5 to 6 MGD Booster Pump Station –Ground Storage Tank –33,000 LF 18” Pipeline Engineering Underway Schedule: –Engineering:2015 –Easement Acquisition: 2015 / 2016 –Bid: Summer 2016 –Construction: Fall 2016 to Early Summer 2017 –Project Complete: Early Summer 2017

Action & Next Steps Action: Consider Execution of Contract with ElectroPurification for delivery of 1 MGD water supply to Delivery Point at Kohler’s Crossing and FM Next Steps…. 1.Execute EP Contract 2.EP to begin test wells 3.Work with HCPUA to confirm final demands for HCPUA water 4.Continued coordination on delivery of Kyle/Buda Pipeline 5.Independent review of test well data when EP Option Period complete

Questions

Extra slides

GWCD Boundaries (from EP)

Alternatives Comparison 21 Permanent Water Needed: 3.6 MGD (2060) Interim Water Needed: 2.0 MGD ( ) HCPUAEP Water Water (mgd) (mgd) Alternative 1: 1.6 (5.4%) 2.0 Alternative 2: 3.6 (11.3%) 0 Alternative 3: 2.6 (8.4%) 1.0 Alternative 4: 3.6 (11.3%) 1.0 Feasibility Unlikely

Water Supply Cost – Short-Term Feasibility Unlikely

Staff Recommendation 23 Key Drivers: Err on side of more water than needed. Possibility of selling water to others in future to off-set cost. Uncertainty with EP supply – not prudent to reduce HCPUA supply at this time. Would potentially allow HCPUA to push back permanent facilities for several years, reducing cost of all customer cities. City will still have some flexibility to adjust HCPUA demands based on EP findings during Option Period, if desired. Diversifies water supply. Preferred Alternative Alternative 4 – HCPUA = 3.6 MGD, EP = 1.0 MGD

Electro Purification – Pros & Cons 24 ProsCons If HCPUA supply reduced….. Approx. $4M savings (next 10 yrs) Reduces Buda’s share in HCPUA project % to 8.4%. Equates to approx. $10M savings long-term. Blending issues with HCPUA – who is responsible for water quality? Could take up to 12 months to confirm if quantity needed can be produced If added to HCPUA supply…. Potentially delays need for Permanent HCPUA water up to 5 years. Trinity Aquifer – unknown quantity, no Groundwater District, typically lower producing Diversification of Water SupplyPrivate water supplier Requires HCPUA to share facilities. Risk of losing 1.0 MGD from HCPUA if EP goes away in future