SMED at Ryanair. SMED at Ryanair Ryanair results 2016  from 2015 To 2016 Profit  43% €1.24 billion Revenue  16% €6.536 billion Average fare 

Slides:



Advertisements
Similar presentations
Setup reduction / quick changeover
Advertisements

Freeleansite.com The Lean Enterprise Set-up Reduction/ Quick Changeover Lean Foundations Continuous Improvement Training Lean Foundations Continuous Improvement.
AS Leisure Studies Unit 2 – A People Business. Starter Why is good customer service so important for a leisure organisation? Increased sales More customers.
Going Lean Can it work for the Medical University? Jennifer Hooks MBA Manager, Performance Improvement Six Sigma Master Black Belt Lean Sensei.
Process Improvement (Lean Concepts) References (sources of graphics): (1)Fiore, Clifford, Accelerated Product Development: Combining Lean and Six Sigma.
Achieving Changeover Flexibility Brigham Young University Prepared by: Kortney J. Jurado.
Making your Portable Restroom business Lean and mean – How to boost productivity and increase your bottom line.
Alistair Murdoch Key Account Manager Finning UK Ltd.
Beni Asllani University of Tennessee at Chattanooga
© ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited Six Sigma TOTAL QUALITY MANAGEMENT 6 
Leading engineering and expertise service company in industrial equipment segment Etteplan Oyj.
What is Yield Management?  Experienced overbooking by an airline?  American saved $1.4 billion from 1989 to 1992 (50% more than its net profit)  Management.
Matthew Stangel. What is Six Sigma?  Engineering process Not specific to software  Designed to keep defects at a minimum  Named for the goal of minimum.
Dubai International Airport 70.5m passengers in 2014 (top busiest airport by international passenger traffic) 6,900 weekly flights to 260 destinations.
Development of Six Sigma
Setup Reduction Module
Introduction to Lean1 LSSG Green Belt Training Lean: An Introduction.
1 SIX SIGMA "Delivering Tomorrow's Performance Today" AIR CDRE ABDUL WAHAB.
Manufacturing Processes Copyright © Texas Education Agency, All rights reserved.
Quick Changeovers & SMED
1 Employability skills (a) Employers value people who: fit well into their team and workplace use initiative to solve routine problems work productively.
Pg 1 What Is A Value Stream? All actions (Value and Non-Value-Added) currently required: – To design a product from concept to launch – To produce a product.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 15 JIT and Lean Operations.
Avon Plastic Products, Inc. Company Overview Manufacturing Facilities: Rochester Hills, MI Established 1978 ISO Registered TS compliant.
Value Analysis/ Flow Analysis
JIT and Lean Operations
Chapter 7 – Just-in-Time and Lean Systems
Desigh by Parichat1 JUST IN TIME LIMIT JUST IN TIME JUST ON TIME JUST OUT TIME TIME
Program Participants: This program is designed for the managers, engineers and professionals working in the service / transactional environment, who want.
Home Public Training Courses Contact Us for public training courses on operational excellence through lean and six sigma Hands on Implementation Contact.
Lean Thinking and Just-in-Time Systems
Quick Changeover Basics This material is provided by Industrial Solutions, Inc. and is intended for internal use only. Any reproduction or re-use outside.
The Office of Audit and Performance Manuel Mendez Director.
IGCSE Business Studies
Single Minute Exchange of Die OR Quick Changeover
Lean Manufacturing Chapter 15 pp June 29, 2012.
Lean Six Sigma: Yellow Belt Advanced © Max Zornada (2012) Process Objective: Establish current/baseline performance or process and quantify customer requirement.
Lean is a business system that focuses on doing only those things that add value to the customer, creating continuous one piece flow, and placing a high.
Ryanair Limited Low cost airline company 297 Boeing 737 aircrafts.
Quick Changeover/SMED Patrick Bye, President Dan Brook, General Manager 11/16/09.
1 Driving Growth, Productivity & Performance Performance Driving Growth, Productivity & Performance Performance.
Lean Training Quick Changeover.
Assets Returned From Lease Project: Bill Cody Black Belt September 25, 2003.
Developing Dementia Friendly Businesses Phil Freeman, Partnerships Manager, Dementia Friendly Communities.
Other Performance Measurement Systems Benchmarking.
Project Chiron SMU TEAM ALCON
Lean training through the Lean Academy Darren Ruane, Carillion PLC
Nick Sykes Lean Coordinator Process Owner: 3.1.1
In Progress Queensland. Upcoming Events March 13thCIWG – OH&S at Bluescope; (920 Nudgee Rd. Banyo) Free to members and guests 13&14 th RCA problem solving;
1. BSc (hons) Food Science & Technology 8 TH Semester (Self Support) INSTITUTE OF FOOD SCIENCE AND NUTRITION UNIVERSITY OF SARGODHA 2.
1 DEFINE Determine Bench mark Determine Customer requirements Set Baseline Get Customer Commitment Map Flow process.
Six Sigma.
Lean Manufacturing Series
Quick Changeover Single Minute Exchange of Dies
LEAN ORGANIZATION SUMMARY
CUSTOM BOXES As Australia’s leading custom corrugated cardboard box supplier, we have developed a groundbreaking, practical solution. With advanced machinery,
Lean Six Sigma Training in Australia
Total Productive Maintenance and Quick Changeover
Brigade Woods near ITPL Brochure
Lion Air Manage Booking Number
Introduction to Materials Management
Just-In-Time and Lean Production
Project Chiron SMU TEAM ALCON
Quick Changeovers Definitions Analysis and Methods GEOP 4316.
Project Chiron SMU TEAM ALCON
Dan Protzman - Biography
Do I Qualify for the Midsize Enterprise Program?
Quick Set-Up Technique
Chit Fund Software , chit fund Accounting software , Chit Fund Software Online, Chit Fund Management Software,Online chit fund software.
Presentation transcript:

SMED at Ryanair

Ryanair results 2016  from 2015 To 2016 Profit  43% €1.24 billion Revenue  16% €6.536 billion Average fare  1% €46.67 Passengers  18% 106 million Load factor  5% 93% Cost per customer  6%

Quick changeover key steps 1. The start: map the process steps 2. Identify external steps i.e. what can be done off-line in advance of machine stopping 3. Eliminate un-necessary Steps 4. Shorten the remaining activities. Aim for < 9 min changever

Ryanair passenger changeover 1. The start: plane changeover process steps 2. In-flight plane clean out, magazine collection 3. No seat pockets. No seat back adjustment 4. Eliminate queuing for corridors at terminal. Embark/disembark form both ends of plane to tarmac.

For more information on the benefits of SMED, and how to implement it effectively in your organisation, please contact: Pat Cullinane, B. Eng, Master Black Belt, University of Kentucky (Toyota) Certified Lean Manufacturing Expert pat @cordatus.ie 087-7727063