Laser Control Status A. Masi, T. Feniet, K. Szczurek Awake Technical Board November 12 th 2015 Thanks for inputs from: M. Donze`, V. Fedosseev, C. Hessler.

Slides:



Advertisements
Similar presentations
European Gravitational Observatory25/01/20061 Alignment : Hardware & Software Status Henrich Heitmann, Julien Marque with the contribution of: INFN Frascati,
Advertisements

FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
Dayle Kotturi Controls April 29, 2004 Injector Controls LCLS Facility Advisory Committee April 29-30, 2004 Outline Description.
MICE Installation and Commissioning meeting RAL, 12 June 2007 Diffuser Oxford University.
Dayle Kotturi Facility Advisory Committee Meeting October 12, 2004 Injector/Linac Controls An overview of the status of each of.
Ion source RF system Andy Butterworth BE/RF Mauro Paoluzzi BE/RF 14/11/2013Linac4 ion source review.
BI SW for LINAC4 On behalf of BE/BI/SW BI software development process Specifications List of BI Systems – Not covered: PSB ring systems Conclusions Lars.
2 Lines Electronics I 2 C Analyzer Ching-Yen Beh Robert S. Stookey Advisor: Dr. J. W. Bruce.
Agenda Adaptation of existing open-source control systems from compact accelerators to large scale facilities.
Laser DCS meeting, Utrecht, 13 June 2005Børge Svane Nielsen, NBI1 TPC laser controls adjustable mirrors Laser Controls, Power, Cooling DCS: 1/ Laser controls.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
Summary of the AWAKE Technical Board Meeting September 2014 – March 2015.
SSRF Beamline Control System
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
DCS planning for ITS/SDD Vojtech Petracek Jiri Kral CTU Prague DCS workshop CERN.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
Field Robot Project to Develop a Fully Autonomous Vehicle for a Field Environment.
Status and plans for online installation LHCb Installation Review April, 12 th 2005 Niko Neufeld for the LHCb Online team.
S. Zelepoukine CMS Electronics Status Report: ECAL Detector Control System S. Zelepoukine IHEP Protvino/ETHZ
Electron Spectrometer Work Package Simon Jolly 19 th May 2014.
1 20th March 2007 – Tango Meeting – G.Abeillé ICALEPS 2005 Overview architecture of SOLEIL technical solutions for Beam Lines Control « A control system.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
G. Carboni – Muon Meeting – April 2002 Muon Meeting LHC schedule is now official (Council Committee) First protons (Pilot run) delayed to
D. Beavis (RSC) May 4, 2010 EBIS ARR Radiation Safety.
9 th AWAKE Technical Board 11 March Actions from Last Technical Board WP laser and MPP: decide until March 2015 which compressor design will be.
Status Report #2 Autonomous Lawnmower Team 5 April Fowler Jose Manzanares Ranjith Raghunath Christopher Gerhardt 5 Feb 07 To design and implement an autonomous.
DIFFUSER HARDWARE REPORT V. Blackmore J. Cobb, M. Dawson, J. Tacon, M. Tacon.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Status of Vacuum Control System MACS week June 2011 PP a-JWA-VacControlStatus.ppt Joachim Wallner 1.
Update on the Laser Beam Line
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
Page 1HMI/AIA Science Meeting – February 13, 2006 HMI Instrument Status HM/AIA Science Meeting February 13, 2006 Barbara Fischer HMI Deputy Program Manager.
Contribution from Pakistan to CLIC & CTF-3 Project. NASIR ABBAS
Mar 18, 2003PFIS CDR1 Control System Summary of Changes Since PDR All the motors, drivers, sensors, switches, etc. have been chosen Built up a mechanism.
Emulsion handling tools for plate changer oil solution N. D’Ambrosio (LNGS Group) LNGS May 2006.
25 January 2007VELO sub-projectsEddy Jans 0 VELO-meeting January 25, 2007 Sub-projects: SX & SX connectorize cooling cables alignment procedure.
Current NML Layout.  Overall length of building is 72M 3 cryomodules with feed and end cans ~40M Not enough room for both photoinjector and downstream.
FourStar Status SAC Meeting 13mar2010 Persson, Murphy, Birk, Monson, Kelson, Uomoto.
Status of the AWAKE Control System Edda Gschwendtner, Janet Schmidt, Marine Gourber-Pace, Roman Gorbonosov, Peter Sherwood AWAKE Technical Board, 27 January.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
Seungyu Rah (Pohang Accelerator Laboratory, POSTECH, Korea) Nov
BI motors control AWAKE Secondary BL mtg, 18/1/
Calva update Nicolas Leroy for the CALVA group (LAL, ESPCI, LAPP, LMA) Main Laser Cavity 1Cavity 2 Aux. Laser L1 L2 M1M2M3.
AWAKE p+ beam line HWC C. Bracco, J. Schmidt Acknowledgment: MCS, EPC, MPE, SPS-OP, BI, ABP (survey),STI, EA, ACE, RP.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
Status of AWAKE Laser Line Installtion For the EN-STI Management Board - 30 May 2016 Presented by Valentin Fedosseev.
V Review SPARC Diagnostic & Control Status G. Di Pirro On behalf control and diagnostic group.
4m. Blanco TCS Upgrade: Signals and Interfaces
4m. Blanco TCS Upgrade: Electronic Status at March/2010
Beam diagnostics from GSI
Pulse energy measurement for the CTF lasers.
LAPP BPM Read-out Electronics
LIU Wire Scanner Milestones June 2017
PLC-based control systems at SOLEIL - ICALEPCS 2017
MICE Target Report Video Conference 29/11/07
ATF2 Magnet Power Supplies
T1 Electronic status Conclusions Electronics Cards:
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
352MHz Klystron Control for the 3MeV Linac test stand
M7 controls Cryo, vacuum, ODH information available
MEDICIS Facility Isotope Separator Controls and HMI
4m. Blanco TCS Upgrade: Signals and Interfaces
Linac 4 Devices Controls and Monitoring Status
LLRF and Beam-based Longitudinal Feedback Readiness
LCLS Cavity BPM Electronics Undulator Week January 22, 2008
VELO-meeting January 25, 2007 Sub-projects: SX & SX
Control System Summary of Changes Since PDR
Advanced Research Electron Accelerator Laboratory
Drive Laser Commissioning Status
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Presentation transcript:

Laser Control Status A. Masi, T. Feniet, K. Szczurek Awake Technical Board November 12 th 2015 Thanks for inputs from: M. Donze`, V. Fedosseev, C. Hessler

Awake devices control specifications DevicesQtyControl typeFESA Class Op. GUI TimberComments Motorized laser mirrors 18Ethernet Controller + FESA gateway √√√ Motorized translator in Vacuum 1Ethernet Controller + FESA gateway √√√ Controller still to be chosen Motorized translator in air 2Ethernet Controller + FESA gateway √√√ Controller still to be chosen Motorized filter wheels 12PLC + Phytron driver √√√ Cameras12PXIe + Digital acquisition cards √√√ Only 3 cameras will be acquired, beam parameters evaluated thorough online image processing Motorized flipping mounts 2PLC + I/O module √√√ Laser safety shutters 2PLC + I/O module √√√ Laser beam dumps 2PLC + Phytron driver √√√ Interlocks1PLC + I/O module √√√

Awake devices control development status DevicesQtyCables Installed Control electronics Control software Development Status Comments Motorized laser mirrors 18 √ Control chassis to be prepared- Patch panel to be made and installed Working Prototype- Implementation in FESA on going Motorized translator in Vacuum 1 √ Controller still to be chosen Motorized translator in air 2 √ Patch panel to be made and installed Controller still to be chosen Motorized filter wheels 12 √ Control chassis to be produced Working Prototype Cameras12 √ To be ordered To be developed Motorized flipping mounts 2 √ To be ordered and assembled In progress Laser safety shutters 2 √ To be ordered and assembled In progress Laser beam dumps 2 √ To be ordered and assembled In progress Interlocks1 √ To be ordered and assembled Specifications to be clarified

Awake devices control development timeline DevicesQtyCables Installed Control electronics ready and Installed Control software commissioned Comments Motorized laser mirrors 18 √ Dec 2015 Motorized translator in Vacuum 1 √ Controller still to be chosen Motorized translator in air 2 √ Controller still to be chosen Motorized filter wheels 12 √ Dec 2015 Jan 2016 Cameras12 √ Jan 2016 April 2016 Motorized flipping mounts 2 √ Jan 2016 Laser safety shutters 2 √ Jan 2016 Feb 2016 Laser beam dumps 2 √ Jan 2016 Feb 2016 Interlocks1 √ March 2016 Specifications to be clarified

Conclusions  Technical choices to be finalized as soon as possible to proceed with the development  Specifications to be formalized for Cameras image processing and Interlocks  All the materials must be ordered by end of November to be available by the end of the year at the latest