House Finding Management Supervisor: Mr. Trần Đình Trí & Avengers Team www.nhatroso.com 1.

Slides:



Advertisements
Similar presentations
Supervisor: Mr. Huỳnh Anh Dũng
Advertisements

Software Testing Levels Philippe CHARMAN Last update:
Supervisor: Mr. Huynh Anh Dung Students: To Quang Duy Pham Ngoc Tien Nguyen Luong Ngoc Chau Nguyen Hoang Phuc Nguyen Thi Trang.
CONTENTS  ABSTRACT  INTRODUCTION  HARDWARE & SOFTWARE REQUIREMENTS  PROBLEM ANALYSIS  MODULES DESCRIPTION  TABLE DESIGN  ER DIAGRAM  SCREEN SHOTS.
Supervisor: Mr. Huynh Anh Dung Students: To Quang Duy Pham Ngoc Tien Nguyen Luong Ngoc Chau Nguyen Hoang Phuc Nguyen Thi Trang.
Members: Trần Huy Thường Trần Mạnh Cường Đào Anh Thư Nguyễn Duy Tiến
Ihr Logo Data Explorer - A data profiling tool. Your Logo Agenda  Introduction  Existing System  Limitations of Existing System  Proposed Solution.
OPEN-ONES PROJECT MANAGEMENT SYSTEM INSTRUCTOR. LÊ NGỌC THẠCH (MR) TEAM MEMBERS. NGÔ ĐỨC DUY MẠNH HOÀNG TR ƯƠ NG PHẠM NGUYỄN TR Ư ỜNG GIANG TÔ CÔNG THANH.
LOGO Server. Contents Introduction 1 Problem Definition 2 Proposed Solution 3 Architecture Diagram 4 Server Technology 5 Hardware and Software.
TEACHER FEEDBACK WEBSITE HTVN TEAM. AGENDA 1.TEAM INTRDUCTION 2.PROJECT OVERVIEW 3.PLAN 4.PRODUCT ARCHITECTURE 5.DATABASE DESIGN 6.TEST PLAN & TEST REPORT.
Topic Cafeteria Management System
MOBILITY BILL DEFRAYMENT
3TC Company e-Restaurant Project management plan lick to add Title 2 Contents Introduction add Title 1 Requirement Specifications 3 Design Description.
OPEN-ONES PROJECT MANAGEMENT SYSTEM INSTRUCTOR. LÊ NGỌC THẠCH (MR) TEAM MEMBERS. NGÔ ĐỨC DUY MẠNH HOÀNG TR ƯƠ NG PHẠM NGUYỄN TR Ư ỜNG GIANG TÔ CÔNG THANH.
CAPSTONE PROJECT OPEN-ONES PROJECT MANAGEMENT SYSTEM INSTRUCTOR. LÊ NGỌC THẠCH (MR) TEAM MEMBERS. NGÔ ĐỨC DUY MẠNH HOÀNG TR ƯƠ NG PHẠM NGUYỄN TR Ư ỜNG.
Members: Trần Huy Thường Trần Mạnh Cường Đào Anh Thư Nguyễn Duy Tiến.
Supervisor: Mr. Huynh Anh Dung Students: To Quang Duy Pham Ngoc Tien Nguyen Luong Ngoc Chau Nguyen Hoang Phuc Nguyen Thi Trang.
Software Architect and Design Final Project– K15T2 – Team 04.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 1 Slide 1 6/6/2016 1/25 IT076IU Software Engineering Project Review 2.
Online Newspaper CMS 1 Date: 27/12/2012. Contents Introduction Project Management Requirement Specifications Design Description Test Documentation Summary.
Capstone Project FPT University VIETNAM TRAVEL SHARING NETWORK Supervisor: Mr. Nguyen Van Hien Team member: Dao Dang Dan Tran Van Su Nguyen Van Nam Nguyen.
Introduction Software Project Management Plan Software Requirements Specifications Software Design Description Software Test Result.
APARTMENT MAINTENANCE SYSTEM M.Tech( Ph.D) HOD of C.S.E & I.T Dept.
Programming Contest Management System Supervisor : Lecturer Phan Tr ư ờng Lâm Students : Hoàng Quang Mạnh Trần Đình Tuấn Nguyễn Thành Trung Phạm Thị Hồng.
DEAL AGGREGATOR Supervisor Supervisor: Trần Đình Trí Students Students: Nguyễn Mạnh Huy Nguyễn Thanh Thủy Nguyễn Quốc Tuấn Đinh Văn Thể Đỗ Duy Việt.
VNCreatures Project Presentation V-creatures
LOGO Accounting Module In ERP Supervisor: Mr. Nguyễn Hồng Kỳ Students: Hoàng Phương Thảo Tạ Trung Kiên Nguyễn Tấn Trí Lưu Hằng My Nguyễn Văn Tiệp.
Smart Navigator Application Supervisor: Mr. Phan Truong Lam.
HMSI Hotel Management System Integrated 01 STARTTHE IDEAPLANREQUIREM ENTS DESIGNTESTDEMO.
Supervisor: Tran Dinh Tri Group Members: Duong Ngoc Nhat-NhatDN01687 Nguyen Quang Minh-MinhNQ01717 Nguyen Quang Minh-MinhNQ01717 Duong Hoang Nam-NamDH01552.
Supervisor: Nguy ễ n V ă n Sang -Đ ỗ Giang Long -Nguy ễ n M ạ nh Hùng -Nguy ễ n Duy Anh -Ph ạ m Tu ấ n Hoàng MY FURNITURE STORE PROJECT.
METRO CALENDAR A new way to manage your life 1. Table of contents ›Introduction ›Problem definition ›What’s metro calendar ›Project organization ›Project.
Supervisor: Mr. Tran Binh Duong Students: Nguyen Duc Thuong Nguyen Duc Thuong Duong Hong Loc Duong Hong Loc Chu Minh Tung Chu Minh Tung Pham Van Khanh.
LOGO HOTEL ROOM BOOKING. Company Logo Contents V. Q&A IV. Organization III. System features II. Goals I. Introduction.
Online Debating System P R E S E N T A T I O N O.D TEAM 1 Instructor: Mr. Tr ầ n Đình Trí Students: Tr ầ n Tr ọ ng Hùng | Nguy ễ n Duy Khánh |
SMART HOME Capstone project introduction Capstone project _Star team. Dec-12 1.
Travel Experience Website Capstone Project Hanoi, Apr 24th, 2014.
WHERE TO TRAVEL Capstone Project. Content Introduction Project Management Plan Requirement Specification Design Description Implementation Testing Summary.
ROBUST MARKETING. RM TEAM MEMBER Mr.TrungNT Supervisor DucMA Developer HaDV QA & Tester Leader HuongPM QA & Tester TungNT Developer AnhND Project Manager.
LOGO e-Citizen. Phan Nhật Minh Phạm Thị Dinh Vũ Xuân Đông Phạm Thị Huyền Nguyễn Thùy Trang
RFH Team Supervisor: Mr. Phan Trường Lâm Nguyễn Việt Nam – Cao Quốc Hưng – Võ Hoàng Việt – Trần Thị Bích – Nguyễn Tiến Chung -
Capstone Project Chatting secure on Android. Introduction Project Management Plan Requirement Specification Software Design Specification Testing & Evaluation.
Location Information Networking Supervisor: Mr. Luong Trung Kien Students: Le Tien Dung Tran Quang Ngoc Duong Duc Quyen Nguyen Bao Trung Hoang Khac Tien.
LOGO Supervisor: Mr.Huỳnh Anh Dũng Students: Nguyễn Công Tuyến Nguyễn Cảnh Phương Phạm Thị Hằng Bùi Thị Huệ Trần Đức Bình Nguyễn.
LOGO YOFOTO WEBSITE Capstone Project Yofoto Team Supervisor Nguyễn Hồng Kỳ Vũ Phương Dung Lương Xuân Hải Đào Thiện Đăng Trần Quang.
ISS Team Group Member ◦ Nguy ễ n Nh ậ t Minh ◦ Nguy ễ n Kh ắ c Khu ◦ Ph ạ m Ng ọ c Hi ế u ◦ Nguy ễ n Ng ọ c Khánh ◦ Nguy.
Top.Not.59 Group: Trần Hùng Team Leader Mai Thị Thu Hà Vũ Hồng Quân Lê Thị Hoài Thu Vũ Đình Thắng Supervisor: Mr. Nguy Ễ n T Ấ t Trung.
Soccer Fields Management Supervisor: Mr.Bùi Đình Chiến Team member: Trịnh Bá Ngọc Tạ Quang Hùng Lê Vũ Việt Anh.
Future Lock Security Group Member Nguy ễ n V ă n Tuy ề n – SE02119 Vũ Ng ọ c Linh – Vũ V ă n An – SE02207 Supervisor Hoàng Xuân S ơ n Project Code.
Cemetery Information Management System CEMETERY INFORMATION MANAGEMENT SYSTEM Supervisor: Mr.Trần Bình Dương Team Members:  Phạm Văn Bình  Ngô.
LOGO AutoCarParking Capstone Project. LOGO Project Role HungPD Supervisor Huynb Project Manager, Developer Truongpx Developer Tuanhh Developer, tester.
Team Collaboration Application HAKI Team collaboration - HAKI Nguyễn Văn Hiệp – SE01961 Nguyễn Hoàng Anh – SE02151 Đỗ Hữu Chiến – SE02258 Lê Mạnh Linh.
LOGO Supervisor: Mr. Tran Binh Duong Students: 1 4. Nguyen Huong Thanh 5. Pham Thi Bich Thuy 6. Nguyen Thi Thu Huyen Funny Contents Sharing Community 1.
The commercial center's restaurant management Supervisor: Trần Đình Trí Team member: Nguyễn Tuấn Vương Nguyễn Văn Hoàng Nguyễn Xuân Tùng Phạm Sỹ Vinh Phạm.
MUSIC IN ME Supervisor : Trần Đình Trí. TEAM G5 Trần Hà Huy Bùi Quốc Anh Nguyễn Phúc Lộc Trần Quang Tùng Hoàng Anh Minh.
Blood Bank Phạm Tiến Lập – SE02683 Nguyễn Sơn Hải – SE02879
WEB TESTING
Online Event Organizing Company Managemant System
ONLINE SHOP MANAGEMENT SYSTEM
Coach Route Searching System
Capstone Project W-CMS `.
Suraki-Bhoomi ” - Landslides Early Warning System
STOCK TRADING SIMULATION SYSTEM
Supervisor : Trần Vinh Thu
RA-Team Supervisor: Tran Dinh Tri Member: Nguyen Hoang Duc(PM)
Capstone Project MIDAS PROJECT
INFORMATION RETRIEVAL AND KNOWLEDGE MANAGEMENT SYSTEM
Pregnant healthcare website
Smart Tendering System
Online Solution for Small Shop
Presentation transcript:

House Finding Management Supervisor: Mr. Trần Đình Trí & Avengers Team 1

The Members Hà Tuấn Đạt - Developer Nguyễn Vũ Sơn - Developer Nguyễn Tùng Bách – Test Lead Nguyễn Thái Bình - Leader 2

Contents Introduction Project Management Plan Requirement Specifications Design Description Testing 5 Demo & QA 6 3

Easy to use Exactly HàTuấn Đạt Nguyễn Vũ Sơn Nguyễn Tùng Bách Nguyễn Thái Bình The idea Benefit Benefit Group of Developers Purpose Introduction 4

Project Management Plan Proposed System Development Enviroment Process Project Organization Project Planning 5 5

Proposed System The website will include main function: Simple Search Advanced Search Contact 6

Development Environment: Hardware CPU: Intel Core 2 Duo 2.3 GHz or better Ram: 1 GB for Windows 7 Connect internet or USB 3G 7

Development Environment: Software 8

Process Follow Iterative Model 9

Project Organization Developer Analysis and design team QA & Tester BinhNT BachNT DatHT SonNV BinhNT Project Manager BinhNT Project Manager BinhNT BachNT 10

Project Planning 11

Requirement Specifications Business Model Functional Requirements Non-functional Requirement Entity Relationship Diagram 12

Business Model Supplier will contact us We sent Staff to meet Supplier and check information After confirming, take money for each room Post available room on website Supplier change status room become hired, they will be returned some money 13

Functional Requirement Topic Management Create Topic View Topic Edit Content Change Status Delete Topic Staff Management Create Staff Edit Staff Delete Staff Search Simple Search Advanced Search Supplier Management Create Supplier Edit Supplier Delete Supplier Statistics Fees Rent Room 14

Load time: Depend on Server Capacity: Depend on Server Compatibility: Chrome Follow coding standard When maintain, it must have a message Easy to use Simple and beautiful interface Run 24/7 Usability Maintainability Performance Non-functional Requirement Availability Password is encrypted by MD5 (available) Security 15

Entity Relationship Diagram 16

Design Description System Architecture 17

Design Description Component Diagram 18

Design Description Overall Class Diagram 19

Design Description 20

Design description Database Table Design 21

Testing: Test Model Requirements Analysis System Design Architecture Design Module Design Coding Acceptance Testing System Testing Integration Test Unit Testing Acceptance Test Design System Test Design Integration Test Design Unit Test Design 22

Test Report 23

Demo 24

Thank for your watching ! 25