Project X: Introduction, Strategy, and Collaboration Meeting Goals Steve Holmes Project X Collaboration Meeting September 11, 2009.

Slides:



Advertisements
Similar presentations
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Advertisements

1 BROOKHAVEN SCIENCE ASSOCIATES Procurement Dave Paveglio, Contract Administrator NSLS-II PAC Meeting May 25, 2007.
Beyond the ALCPG David B. MacFarlane Associate Laboratory Director for PPA.
Project X: News & Strategy Steve Holmes Project X Working Group Meeting November 19, 2009.
Project X: Project Status & Progress Steve Holmes Project X Working Group Meeting March 2, 2011.
February 19, 2008 FACET Review 1 Lab Overview and Future Onsite Facilities Persis S. Drell DirectorSLAC.
1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
Nufact09-IIT 107/24/2009 Project X and a Muon Facility at Fermilab Milorad Popovic FNAL.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Project X RD&D Plan Conventional Facilities (Civil Construction) Russ Alber AAC Meeting February 3, 2009.
Project X Update Steve Holmes SPAFOA Meeting November 13, 2012
Project X: Project Status Steve Holmes Project X Working Group Meeting December 15, 2011.
Greetings to Veljko from Fermilab December 9, 2010.
Project X: A Multi-MW Proton Source at Fermilab Jim Kerby for the Project X team HZB 22 February 2011.
American Neutrino Strategy: Consequences of P5 Report Jim Strait, LBNE Project Director NuFact August 2014.
Project X: A multi-MW Proton Source at Fermilab Steve Holmes Extreme Beam Lecture Series June 11, 2009.
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
Executive Session Director’s CD-1 Review of the LBNE Project September 25, 2012 Jim Yeck.
F Project X Overview Dave McGinnis October 12, 2007.
Project X: A Multi-MW Proton Source at Fermilab Manfred Wendt & Steve Holmes SPL/ESS Collaboration Meeting Lund June 30, 2010.
Steve Holmes and Brendan Casey DPF Project X Forum August 10, 2011 Project X: A 5 MW Proton Accelerator Accelerator and Particle Physics.
An Integrated Intensity Frontier Strategy Steve Holmes & Bob Tschirhart LBNE Reconfiguration Workshop April 25, 2012.
Office of Science U.S. Department of Energy 1 International Linear Collider In August 2004 ICFA announced their technology selection for an ILC: 1.The.
Project X Injector Experiment (PXIE) Sergei Nagaitsev Dec 19, 2011.
Mu2e, August 15, 2007 E Prebys 1 The Steering Group and mu2e Eric Prebys.
MegaWatt Proton Beams for Particle Physics at Fermilab Steve Holmes P5 Meeting/BNL December 16, 2013 projectx-docdb.fnal.gov/cgi-bin/ShowDocument?docid=1232.
Fermilab Proton Driver Project Weiren Chou for Bill Foster Fermilab, U.S.A. October 20, 2004 Presentation at the Proton Driver Session ICFA-HB2004, Bensheim,
PIP-II: Why a new accelerator? Paul Derwent Fermilab Community Advisory Board 23 July 2015.
Welcome and Presentation of Charge Steve Holmes Accelerator Advisory Committee ( May 10-12, 2005.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
Overview of the Project X RD&D Plan Sergei Nagaitsev AAC Meeting February 3, 2009.
Proton Improvement Plan: View from the Directorate (and the DOE) Stuart Henderson PIP Meeting Jan 3, 2012.
Proton Source & Site Layout Keith Gollwitzer Accelerator Division Fermi National Accelerator Laboratory Muon Accelerator Program Review Fermilab, August.
International Design Study for a Neutrino Factory in the 5 Year Plan A. Bross NFMCC CM January 15, A. Bross NFMCC CM January 15, 2009.
Fermilab Perspective: Where are We Going with Project-X, and How Can it Benefit Nuclear Energy? Stuart Henderson PASI Meeting April 5, 2013.
Fermilab: Prospects and Plans Giorgio Apollinari Fermilab New Opportunities in Physics May 10-13, 2009.
Project X and the Future of the Fermilab Accelerator Complex Steve Holmes Accelerator Physics & Technology Seminar April 22, 2008.
News Y2K June 25, Summary of June 12 Face-to-Face Meeting.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
June 3, 2004G.W.Foster - Proton Driver Proton Driver Project Development, Tactics & Strategy G. W. Foster Fermilab User’s Meeting June 3, 2004.
Fermilab: Present and Future Young-Kee Kim Data Preservation Workshop May 16, 2011.
Budget Outlook Glen Crawford P5 Meeting Sep
F A Fermilab Roadmap Dave McGinnis May 28, f Fermilab Roadmap - McGinnis Timelines  Divide the road map into three parallel paths  ILC - Energy.
Status of Project X Keith Gollwitzer Accelerator Division Fermilab MAP Winter Meeting - March 1, 2011.
Project X Collaboration Plan Steve Holmes Accelerator Advisory Committee Meeting May 6-8, 2008.
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
Project X RD&D Plan 325 MHz Linac including High Intensity Neutrino Source (HINS) Program Bob Webber AAC Meeting February 3, 2009.
NuFACT06 Muon Source at Fermilab David Neuffer Fermilab.
Steering Group Meeting 10:30 – 12:30 am CDT Monday, July 23, 2007 Y2K.
Protons for Neutrinos: Mid-Term and Project-X Bob Zwaska Fermilab Intensity Frontier Neutrino Working Group Meeting October 24, 2011.
Project X Update Steve Holmes Accelerator Advisory Committee Meeting November 7, 2011.
Nigel Lockyer Fermilab Operations Review 16 th -18 th May 2016 Fermilab in the Context of the DOE Mission.
Overview of Project X ICD and RD&D Plans David Neuffer material from Paul Derwent & Sergei Nagaitsev (AAC Meeting, February 3, 2009)
Project X: Accelerators Sergei Nagaitsev September 2, 2011.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
Fermilab SRF Linac Development Steve Holmes Workshop on High Intensity Proton Accelerators October 19, 2009.
Nigel Lockyer Fermilab Operations Review 16 th -18 th May 2016 Fermilab in the Context of the DOE Mission.
U.S. Plans for High Power Proton Drivers Steve Holmes Fermilab Workshop on Physics with a Multi-MW Proton Source CERN May 25, 2004.
Intensity Frontier Physics with a Mega-Watt Proton Source R. Tschirhart Fermilab Science & Technology Review November
F Sergei Nagaitsev (FNAL) Aug Project X ICD2 Briefing.
The Fermilab Roadmap, Project X, and Muon Facilities Steve Holmes NFMCC Meeting March 17, 2008.
Project X as a Muon Facility Platform Keith Gollwitzer Fermilab Accelerator Advisory Committee November 7-9, 2011.
Project X/ILC/SRF Integrated Plan Steve Holmes Fermilab DOE Annual Science & Technology Review July 12-14, 2010.
8 GeV Linac (Project X) and mu2e Chuck Ankenbrandt Fermilab Mu2e Collaboration Meeting August 1, 2007 My Preferred title: Linac & Recycler & Accumulator.
Fermilab-India Agreements and Collaboration Shekhar Mishra Project-X, International Collaboration Coodinator Fermi National Accelerator Laboratory Batavia,
Welcome! Robert Zwaska 23 November 2015 Workshop on Booster Performance and Enhancements.
Particle Physics Sector Young-Kee Kim / Greg Bock Leadership Team Strategic Planning Winter Workshop January 29, 2013.
Steve Holmes DNP Meeting/Santa Fe November 6, 2010 Project X: A Multi-MW Proton Source at Fermilab.
FNAL SCRF Review R. Kephart. What is this Review? FNAL has argued that SCRF technology is an “enabling” accelerator technology (much like superconducting.
Project X: Cryogenic Segmentation Issues
Presentation transcript:

Project X: Introduction, Strategy, and Collaboration Meeting Goals Steve Holmes Project X Collaboration Meeting September 11, 2009

Outline Strategic Context and Goals Update on Activities of the Last Year Project X Goals and Initial Configuration(s) FY2010 Plan Meeting Goals, Agenda, and Organization Our websites: 2PX Collaboration Meeting, 9/11/09 – S. Holmes

Strategic Context: Fermilab and the World Program Fermilab currently operates the highest energy collider, and the highest power long baseline neutrino beam, in the world. In 2009: LHC will capture the energy frontier J-PARC will initiate a competitive neutrino program To Soudan Page 3PX Collaboration Meeting, 9/11/09 – S. Holmes

Strategic Context: Fermilab Long Range Plan Fermilab is the sole remaining U.S. laboratory providing facilities in support of accelerator-based Elementary Particle Physics. The Fermilab long-term strategy is to provide world-leading accelerator facilities supporting forefront research at the Energy and Intensity Frontiers − Consistent with the HEPAP/P5 plan for U.S. EPP ( Page 4PX Collaboration Meeting, 9/11/09 – S. Holmes

Evolution of the Accelerator Complex A multi-MW Proton Source, Project X, is the linchpin of Fermilab’s strategy for future development of the accelerator complex. Project X is designed to provide flexibility in evolving the Fermilab program in response to research results anticipated circa –Energy Frontier: Tevatron  ILC or Muon Collider  Technology alignment  Project X development retains ILC and MC as options for the Fermilab site –Intensity Frontier: NuMI  NO A  LBNE/mu2e  multi-MW Proton Source  NuFact  Continuously evolving world leading program in neutrino physics and other beyond the standard model phenomena Page 5PX Collaboration Meeting, 9/11/09 – S. Holmes

Evolution of the Accelerator Complex: LBNE PX Collaboration Meeting, 9/11/09 – S. HolmesPage 6

Physics Opportunities: Long Baseline ’s (LBNE) A long baseline, a massive detector, and high beam power are required to access CPV at low sin 2 2  13 : – 2 nd oscillation maximum visible at 1300 km –More straightforward separation of CPV and matter effects –Longer baseline enhances matter effects (at first maximum) PX Collaboration Meeting, 9/11/09 – S. HolmesPage 7  → e probability

Near Term Strategy Project X is moving through the DOE system in coordination with the Long Baseline Neutrino Experiment (LBNE) and the muon to electron coversion experiment (Mu2e) –LBNE and Mu2e will both establish mission need (CD-0) on the basis of modest upgrades to the existing complex.  Both have been told to expect CD-0 “shortly”, and to be prepared for CD-1 at the end of FY2010. –The Project X mission will be to provide significant extension of the reach of these two initiatives, while simultaneously creating a broader range of intensity frontier opportunities (Bob Tschirhart presentation) Several briefings for the Office of Science on strategy, including to Bill Brinkman by Pier Oddone on August 13  CD-0 for LBNE & Mu2e are pre-requisites to CD-0 for Project X Page 8PX Collaboration Meeting, 9/11/09 – S. Holmes

Outline Why the intensity frontier answers fundamental questions Why Project X is the key And how Project X can lead us back to the energy frontier

Update on FY09 Activities Initial Configuration Document (ICD-1 V1.1) and updated RD&D plan (V2.2) released in March 2009 –Available at Initial cost estimate based on ICD-1 released and subject to Director’s Review in March –The review utilized Collaboration members as reviewers, and included DOE observers. ICD-1 is currently under (soft) configuration control. –TPC = $1.5B. Work initiated on developing an alternative design concept based on a 2 GeV CW linac, followed by a 2-8 GeV rapid cycling synchrotron. –Initial Configuration Document (ICD-2) in preliminary draft –Associated cost estimate under development.  Primary motivation for ICD-2 is to provide a more flexible base for the low energy rare processes program supported by Project X PX Collaboration Meeting, 9/11/09 – S. HolmesPage 10

Update on FY09 Activities $42M received from ARRA funds for superconducting rf infrastructure at Fermilab and development of U.S. vendors. Project X Collaboration MOU signed by all potential U.S. participants; Serves as the overall governing document for the collaboration –A number of secondary MOU’s have now been established within the collaboration, covering specific scopes of work. CD-0 is now currently expected in FY2010 (following LBNE) –Based on: ICDs, preliminary cost estimates, P5 mission definition Anticipated funding for Project X R&D in FY10 will total $9.2M  The September 2009 Collaboration Meeting will provide an opportunity to discuss ICD-2 and to develop/finalize the plan for FY2010. PX Collaboration Meeting, 9/11/09 – S. HolmesPage 11

Goals and Strategy: Mission Need The P5 report defines mission need for a multi-MW proton source based on : –A neutrino beam for long baseline neutrino oscillation experiments  2 MW proton source at GeV –High intensity, low energy protons for kaon and muon based precision experiments  Operations simultaneous with the neutrino program. –A path toward a muon sourcefor a possible future neutrino factory and/or a muon collider at the Energy Frontier.  Requires upgrade potential to 2-4 MW at ~8 GeV. Page 12PX Collaboration Meeting, 9/11/09 – S. Holmes

Initial Configuration-1 Project X Design Criteria –2 MW of beam power over the range 60 – 120 GeV; –Simultaneous with at least 150 kW of beam power at 8 GeV; –Compatibility with future upgrades to 2-4 MW at 8 GeV Page 13PX Collaboration Meeting, 9/11/09 – S. Holmes

Initial Configuration-1 Performance Goals Linac Particle TypeH - Beam Kinetic Energy8.0GeV Particles per pulse1.6  Linac pulse rate2.5Hz Beam Power500kW Recycler Particle Typeprotons Beam Kinetic Energy8.0GeV Cycle time1.4sec Particles per cycle to MI1.6  Particles per cycle to 8 GeV program1.6  Beam Power available for 8 GeV program kW Main Injector Beam Kinetic Energy (maximum)60-120GeV Cycle time sec Particles per cycle1.6  Beam Power at GeV>2000kW Page 14PX Collaboration Meeting, 9/11/09 – S. Holmes

Initial Configuration-1 Operating Scenarios Operating scenarios for 120 GeV (2.1 MW) –194 kW at 8 GeV to mu2e experiment in parallel Page 15PX Collaboration Meeting, 9/11/09 – S. Holmes

Initial Configuration-1 Provisional Siting Page 16PX Collaboration Meeting, 9/11/09 – S. Holmes

Initial Configuration-1 Operational Challenges Page 17 We know that ICD-1 does not provide an ideal platform for mounting a low energy flavor program. – “Golden Book” requirements: –The Recycler is ill-suited to providing high intensity slow spilled beam  In ICD-1 the Recycler delivers 15 Hz packets to the Debuncher for slow spill to mu2e. –The Debuncher appears limited to <150 kW in this mode –ICD-1 does not yet have a solution for the kaon requirements  We are able to generate substantially more beam power in ICD-1 than we can effectively utilize. PX Collaboration Meeting, 9/11/09 – S. Holmes

Initial Configuration-2 Consideration of alternative designs is required by the DOE Project Management Order. A primary consideration is the low energy program –The Recycler as utilized in the ICD-1 has limitations in providing a flexible source of useful beam to the low energy flavor program Primary alternative we are looking at: –Linac operated in CW (1 mA) mode up to 2 GeV –Rapid cycling synchrotron for acceleration from 2 GeV to 8 GeV  “Mix and match” opportunities for the evaluation phase –Upgrade to NF/MC power capabilities requires more thinking Initial Configuration Document-2 (ICD-2) under development –Document, and associated cost estimate, to be prepared utilizing same team, methodology, and design criteria as ICD-1 –Anticipate release late summer Page 18PX Collaboration Meeting, 9/11/09 – S. Holmes

Initial Configuration - 2 Project X Design Criteria –2 MW of beam power over the range 60 – 120 GeV; –Simultaneous with 2 MW beam power at 2 GeV; –Compatibility with future upgrades to 2-4 MW at 8 GeV PX Collaboration Meeting, 9/11/09 – S. HolmesPage 19

Initial Configuration-2 Page 20PX Collaboration Meeting, 9/11/09 – S. Holmes 2-GeV SC Linac RFQ H- p RCS To neutrino, 8-GeV programs RF splitter Kaons µ2e Other 2-GeV programs

Initial Configuration-2 Operating Scenario H- ion source capable of up to 10 mA DC Variable bunch formats: –Bunch-by-bunch chopping example (ion source at 4.7 mA), chopping and rf splitting for 3 experiments PX Collaboration Meeting, 9/11/09 – S. Holmes21 Transverse kick at rf splitter (81 MHz, similar to crab cavity)

Near Term Strategy FY10 Plan September 11-12, 2009: Collaboration Meeting –Input on ICD-2 –Work plan for FY10 October 1, 2009: Release ICD-2 Rev. 1.0 October 19-21, 2009: Workshop on Applications of High Intensity Proton Accelerators (Fermilab) –Feeds into DOE Symposium/Workshop the following week November 1, 2009: Complete initial cost estimate for ICD-2 November 9-10, 2009: Workshop on Physics with a High Intensity Proton Source (Fermilab) –Emphasis on rare processes/flavor program PX Collaboration Meeting, 9/11/09 – S. HolmesPage 22

Near Term Strategy FY10 Plan November 10-12, 2009: Muon Collider Physics Workshop (Fermilab) –Physics and detector requirements November 12-14, 2009: Fermilab Physics Advisory Committee Meeting November 16-18, 2009: Fermilab Accelerator Advisory Committee Meeting –ICD-2 concept and revised R&D plan January, 2010: Potential Director’s Review of ICD Cost Range PX Collaboration Meeting, 9/11/09 – S. HolmesPage 23

Near Term Strategy FY10 Plan January, 2010: Identify ICD-1 or ICD-2 as preferred option to move forward. Evaluation metrics: –Cost –Performance –Technical risk –Upgradability/flexibility –Interactions with other programs  Weighting associated with metrics is to be determined(!) January, 2010: Initiate conceptual development of the preferred configuration PX Collaboration Meeting, 9/11/09 – S. HolmesPage 24

Working Timeline FY2009 –Complete Initial Configuration Documents (ICD-1 and ICD- 2) and preliminary cost estimates –Develop Upgrade Concepts for 2-4 MW at 8 GeV –Form RD&D Collaboration –Establish Project Management team –Revise RD&D plan and initiate work FY2010 –CD-0 –Initiate work on Conceptual Design Report –Request PED funds for FY2012 –Develop NEPA strategy –Initiate permitting documentation –Draft of all CD-1 documentation Page 25PX Collaboration Meeting, 9/11/09 – S. Holmes

Working Timeline FY2011 –CD-1 FY2013 –CD-2/3a FY2014 –CD-3: Initiate Construction ~FY2014~2018 –Construct Page 26PX Collaboration Meeting, 9/11/09 – S. Holmes

Collaboration Plan A multi-institutional collaboration has been established to execute the Project X RD&D Program. –Organized as a “national project with international participation”.  Fermilab as lead laboratory  International participation via in-kind contributions, established through bi-lateral MOUs. (First MOU with India in place) –Collaboration MOU for the RD&D phase outlines basic goals, and the means of organizing and executing the work. Signatories: ANLORNL/SNS BNLMSU CornellTJNAF FermilabSLAC LBNLILC/ART –Collaborators to assume responsibility for components and sub-system design, development, cost estimating, and potentially construction. Page 27PX Collaboration Meeting, 9/11/09 – S. Holmes

Collaboration Meeting: Goals Discuss Project X configurations –Review of ICD-1 –Introduction to ICD-2 –Comments from collaboration Establish RD&D Plan for FY10 –Discuss required modifications to the current RD&D plan to accommodate ICD-2 –Discuss/establish work plan for FY10  Goals, milestones, assignments  Presentation of planned FY10 budget –Discussions with potential international and university collaborators on possible interests and modes of participation. –Understand the integration with the ILC and SRF infrastructure programs. Page 28PX Collaboration Meeting, 9/11/09 – S. Holmes

Collaboration Meeting: Goals Collaboration Council Meeting –Discussion of working arrangements under the MOU –Review of current institutional responsibilities –Discussion of criteria and process for identifying a CDR configuration –Discuss potential interactions with international and university collaborators  Associates status? –Desired meeting frequency Page 29PX Collaboration Meeting, 9/11/09 – S. Holmes

Collaboration Meeting: Agenda Friday, September 11 –Opening plenary session 08:30-10:30  Project X Introduction and StrategySteve H.  Project X ICD-1 and ICD-2 OverviewSergei N.  Project X Physics OpportunitiesBob T. –Coffee Break (1 West)10:30-11:00 –Working Groups session one11:00-12:30 –Lunch (self-serve)12:30-13:30 –Working Groups session two13:30-15:30 –Collaboration Council meeting13:30-14:30 –Coffee Break (WH2, W&C)15:30-16:00 –Working Groups session three16:00-17:30 –Adjourn17:30 Page 30PX Collaboration Meeting, 9/11/09 – S. Holmes

Collaboration Meeting: Agenda Saturday, September 12 –Working Group Reports 08:30-10:00  Linac Design  RCS Design  Cavities and Cryomodules  RF Sources –Coffee Break10:00-10:30 –Working Group Reports10:30-12:00  Cryogenics  Instrumentation and Controls  Main Injector/Recycler  Beam Transfer Line/Injection –Adjourn12:00 Page 31PX Collaboration Meeting, 9/11/09 – S. Holmes

Collaboration Meeting: Working Groups Charge to the working groups: –Discussion/potential modifications to ICD-1 and ICD-2; –Discuss potential modifications to the existing RD&D plan for ICD-2; –Establish goals and work plan for FY2010 (elements and sequencing);  Includes foreseen MOUs  Provisional distribution of responsibility and funding –Identify any issues related to the above that need resolution Provisional FY2010 budget distribution ($K, direct costs only): M&SSWF Labs Total Available$2500$3350$1600$7450 Requested$3210$5540$2170$10920 Page 32PX Collaboration Meeting, 9/11/09 – S. Holmes

Collaboration Meeting: Working Groups RF SystemsJ. Reid/R. Pasquinelli/B. Chase/L. Harwood, A. Nassiri Cavities & CMsM. Champion/B. Rimmer Main Injector/RecyclerI. Kourbanis/U. Wienands Instrumentation/ControlsM. Wendt/J. Patrick/W. Blokland CryogenicsA. Klebaner/D. Arenius Transfer Line/InjectionD. Johnson/D. Raparia Linac Design/IntegrationS. Nagaitsev/N. Solyak/P. Ostroumov/C. Adophsen RCS DesignV. Lebedev/M. Plum Page 33PX Collaboration Meeting, 9/11/09 – S. Holmes

Summary Project X is central to Fermilab’s strategy for future development of the accelerator complex: –Energy Frontier: Aligned with ILC technology development; Fermilab as potential site for ILC or a Muon Collider –Intensity Frontier: World leading program in neutrinos and rare processes; Fermilab as potential Neutrino Factory site Initial Configuration-1, and preliminary cost estimate, established –>2 MW at GeV, simultaneous with >150 kW at 8 GeV –Upgradable to 2-4 MW at 8 GeV –Initial Configuration-2 under development Project X could be constructed over the period ~ Collaboration Meeting Goals: –Look at ICD-2 –Formulate the plan for next year Page 34PX Collaboration Meeting, 9/11/09 – S. Holmes

Working Group Room Assignments (session 1) RF Systems1-West Cavities & CMs1-West Main Injector/RecyclerComitium (WH2-SE) Instrumentation/ControlsScatter Fishtank (WH13-N) CryogenicsMW-9 (follow Arkadiy) Transfer Line/InjectionHuddle (X-Gallery) Linac Design/Integration1-West RCS DesignHuddle (X-Gallery) Page 35PX Collaboration Meeting, 9/11/09 – S. Holmes

Backup Slides PX Collaboration Meeting, 9/11/09 – S. HolmesPage 36

Initial Configuration-1 Operating Scenarios Operating scenario for 64 GeV (2.1 MW) –136 kW at 8 GeV to mu2e experiment in parallel Page 37PX Collaboration Meeting, 9/11/09 – S. Holmes