FC Status CM39 1/20 June 2014 OXFORDRALDARESBURY V. BlackmoreV. BaylissT. Hartnett J. CobbT. BradshawS. Griffiths W. LauM. CourtholdI. Mullacrane R. PreeceA.

Slides:



Advertisements
Similar presentations
Q1 for JLAB’s 12 Gev/c Super High Momentum Spectrometer S.R. Lassiter, P.B. Brindza, M. J. Fowler, S.R. Milward, P. Penfold, R. Locke Q1 SHMS HMS Q2 Q3.
Advertisements

Focus Coil Update Roy Preece / Tom Bradshaw / Mike Courthold STFC – RAL VC 17 th Jan 2013.
The Use of Small Coolers for Hydrogen and Helium Liquefaction
AMS-02 Cryosystem Phase III Flight Safety Review January 12, 2010 Phil Mott.
Status of the AFC at RAL Tom Bradshaw John Cobb Wing Lau Matt Hills Elwyn Baynham Mike Courthold Victoria Bayliss MICE Project Board 28 th June 2011.
Progress on the MICE Cooling Channel Solenoid Magnet System
Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
1 Update on Focus Coil Design and Configuration M. A. Green, G. Barr, W. Lau, R. S. Senanayake, and S. Q. Yang University of Oxford Department of Physics.
Acceptance Criteria for the Decay Solenoid Tom Bradshaw Mike Courthold Matthew Hills.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 14, 2009.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #129 February 25, 2010.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
1 Superconducting Magnets for the MICE Channel Michael A. Green Oxford University Physics Department Oxford OX1-3RH, UK.
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #145 December 15, 2011.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
MICE Collaboration Meeting 17 CERN 21 – 25 Feb 2007 Summary on Magnet & MICE Integration talks By Oxford University.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting #26 University of California.
Electrical Installation CM39 Andy Gallagher & Ian Mullacrane.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
MICE - UK Project Progress Roy Preece 30 th April 2013.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
LBNL Test Cryostat Preliminary Design Review Tuning – Field Correction Soren Prestemon, Diego Arbelaez, Heng Pan, Scott Myers, Taekyung Ki.
Magnet quench during a training run Successfully trained to peak currents and operationally tested Thermal performance requirements met 3D magnetic bore.
STFC Technology undulator manufacture and measurement James Rochford On behalf of the Helical collaboration.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
Spectrometer Solenoid Test Plan Workshop: Spectrometer Solenoid Overview Steve Virostek - LBNL February 17, 2012.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
HQ01e CERN test preparation update CERN Team: H. Bajas, M. Bajko, A. Chiuchiolo, G. Deferne, O. Dunkle, J. Feuvrier, P. Ferracin, L. Fiscarelli, F. Flamand,
MICE CC Test Status Ruben Carcagno 11/06/13 1. Cooldown Coil Temperature (calculated average in each of 8 coil segments) SC Transition (voltages across.
MICE magnetic measurements: AFC considerations Alain Blondel see a previous discussion for reference in CM35 (Feb 2013 slides by V. Blackmore, A. Blondel.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Spectrometer solenoid 2. Magnetic shielding 3. Next Collaboration meeting.
Spectrometer Solenoids MICO 197 Steve Virostek LBNL August 15, 2012.
Spectrometer Solenoid: Plans to Fix Magnet 2 Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
CM1 Thermal Cycle CM1 Warmup –1/4/12 (Wed.) to 1/6/12 (Fri.) (~50 hours) –Verified turbo interlock system works CM1 Cooldown –Began 1/9/12 (Monday) –At.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
HL-LHC Annual Meeting, November 2013HQ Planning – G. Sabbi 1 HQ Status and Plans G. Sabbi High Luminosity LHC Annual Meeting Daresbury, UK, November 11-14,
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 6, 2009.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting #28 Sofia, Bulgaria.
1 MICE PM report Target News Outcome of Spectrometer Solenoid Review New plans for Steps II & III RF Power news MICE CMPB, 4th December, 2009.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
Decay Solenoid – what do we have to do to make it work?
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
CM 28 – 6 th October 2010 LH2 Infrastructure M Hills M Courthold T Bradshaw I Mullacrane P Warburton.
FC1 M AGNETIC M APPING V. Blackmore CM39 25 th June, /13.
Helical Undulator Status Jim Clarke ASTeC, STFC Daresbury Laboratory.
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
SPOKESMAN’S UPDATE K. Long Imperial College London/STFC.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 120 May 7, 2009.
Spectrometer Solenoid Design and Test Results Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Spectrometer Solenoid Background Info Steve Virostek Lawrence Berkeley National Lab MICE Spectrometer Solenoid Review: Phone Meeting October 5, 2009.
Spectrometer Solenoids MICO 194 Steve Virostek LBNL July 25, 2012.
FC Status MPB 1/20 April 2014 OXFORDRALDARESBURY V. BlackmoreV. BaylissT. Hartnett J. CobbT. BradshawS. Griffiths W. LauM. CourtholdI. Mullacrane R. PreeceA.
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
Magnet Issues 1/19 Nov 2013 MICE MAGNET ISSUES Brief update on –Coupling Coils (CC) –Spectrometer Solenoids (SS) Both are US responsibilities Details of.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
1 MICE Absorbers work package MPB – 17/04/15 RAL Tom Bradshaw Vicky Bayliss Mike Courthold Matt Hills Andy Nichols Roy Preece Mark Tucker Steve Watson.
Cryogenics for SuperB IR Magnets J. G. Weisend II SLAC National Accelerator Lab.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
S A Griffiths CM42 June 2015 Electrical & Control.
MICE Absorber and Focus Coil Magnet – Test Results
MQXC Nb-Ti 120mm 120T/m 2m models
Project Manager’s Report + DC/MoM Report
Technical Summary - ANL
ESS Spoke cryomodule testing: cryogenic experience
Presentation transcript:

FC Status CM39 1/20 June 2014 OXFORDRALDARESBURY V. BlackmoreV. BaylissT. Hartnett J. CobbT. BradshawS. Griffiths W. LauM. CourtholdI. Mullacrane R. PreeceA. Oates J. TarrantP. Owens M. TuckerC. White S. Watson FOCUS COIL STATUS

FC Status CM39 2/20 June 2014 OUTLINE Reminders –FC 1 history –FC 2 history FC 2 repair FC 1 rides again –Stability –Mapping –(re)-Training Flip – Solenoid – Flip Plans

FC Status CM39 3/20 June 2014 FC 1 HISTORY Trained Feb – Oct 2013 –Full current – 114 Amp – Solenoid mode –188 Amps Flip mode – just 200 MeV/c ‘baseline’ –No overhead Stability not tested Training stopped when FC 2 arrived –Fate of FC 1 was to depend on performance of FC 2 Known faults corrected January 2014 –Tension on CM supports increased –Insulation between stages of cryocoolers added

FC Status CM39 4/20 June 2014 ENTER – AND EXIT – FC 2 FC 2 arrived end October 2013 –Connected –Pumped down –Started to cool with cryocoolers Three faults: –Faulty temp. sensor –He leak Worse when cold –Thermal shorts Couldn’t cool cold mass… Returned to manufacturer

FC Status CM39 5/20 June 2014 Forensic disassembly established source of thermal shorts: 1.Cold mass / rad. shield / warm bore tube not concentric 6mm clearance reduced to 3mm  compressed MLI 2.Debris of pop-rivet on radiation shield impinging on cold mass Calculations agree with observed thermal loads FC 2 INVESTIGATIONS

FC Status CM39 6/20 June 2014 FC 2 REPAIR He leak is somewhere on cold mass Decided – with manufacturer – not to remove cold mass to fix it –Like brain surgery Risk to connections to cold mass, leads… –Impossible to test cold at manufacturers Want to assess electrical performance of FC 2 –To inform FC 1 decisions Manufacturer has: 1.Replaced thermal sensor & wiring 2.Added spare sensor 3.Reassembled carefully Delivered late May –Helium leak marginally worse when warm

FC Status CM39 7/20 June 2014 FC 1 RIDES AGAIN Three training runs after warm-up –It remembered its training ! First estimate of stable operating current in R9 was 185 Amps –Two stable 4-hour runs at 185 Amps Quenched at 183 Amps on third attempt Stable at 180 Amps for two 24 hour runs

FC Status CM39 8/20 June 2014 CRYOCOOLER PERFORMANCE He bath heater activating at full current  excess cooling capacity But marginal 4 hours at 185 A

FC Status CM39 9/20 June 2014 MAPPING FC 1 Spent ~ two weeks at end of May mapping with CERN mapper –Flip mode then solenoid mode 120 Amps = 240 MeV/c + 5% –Then back to flip mode To see what happens… Quasi-infinite number of measurements –~ 450,000 points –Will take some while to digest –More details in V. Blackmore’s talk in analysis // session –Example follows

10 Comparison to calculation 03/13

11 Comparison to calculation Ratio of measured to calculated field in Flip Mode at 150A Ratio of measured to calculated field in Solenoid Mode at 100A 05/ to 1% difference between measured and calculated fields Also seen with ‘probe on a stick’ Surprisingly large   thickness ~ – 5 mm Need to check nominal dimensions of coils with manufacturers Idea is to fit (4 parameters) coil dimensions

FC Status CM39 12/20 June 2014 FC 1 AFTER SOLENOID MODE It went straight to Amps before quenching  Still remembers its training

FC Status CM39 13/20 June 2014 PSU STABILITY Checked by DL team Better than 60 ppm in 12 hours Absolute calibrations agree to ~ 1.1 parts / 1000 (0.11 %)

FC Status CM39 14/20 June 2014 FC 1 & 2 PLANS FC 2StartDuration Cooldown2 Jul3 weeks Solenoid mode training24 Jul2 weeks Flip mode training7 Aug10 weeks Know by mid-September if FC 2 better than FC 1 Know much sooner if He leak is a real problem FC 1 work before south side PRY: LH2 turret leak test using dummy windows Receive real absorber windows, fit & insert absorber Re-commission LH2 vacuum system Leak tests using actual windows and vacuum system

FC Status CM39 15/20 June 2014 FC 1 GOES TO A NEW HOME Moved to Hall 19 June THE END