André Hoddevik, Project Director Enlargement of the PEPPOL-consortium 2009.

Slides:



Advertisements
Similar presentations
SMEs in the. SMEs in FP7 - why? SMEs are at the core of European industry and key players in the innovation system. SMEs have to respond increasingly.
Advertisements

EUROPEAN NEIGHBOURHOOD AND PARTNERSHIP INSTRUMENT - ENPI CROSS-BORDER COOPERATION PROGRAMMES.
University of Trieste PHD school in Nanotechnology Writing a proposal … with particular attention to FP7 Maurizio Fermeglia.
DR MACIEJ JUNKIERT PRACOWNIA BADAŃ NAD TRADYCJĄ EUROPEJSKĄ Guide for Applicants.
1 EFCA - 21th March 2002 Raul Mateus Paula. 2 This presentation underlines: The key objectives of the Relex Reform The division of the responsibilities.
Provisional draft The ICT Theme in FP7 Submission and Evaluation (preliminary information) ICT-NCP Information Day 19 th October 2006.
AAL2 Active and Assisted Living Research and Development Program Presentation for the Symposium on Active Healthy Home 23 oktober 2014 Greet Bilsen.
Horizon 2020 SME Instrument A recipe for success.
EUROPEAN REGIONAL DEVELOPMENT FUND Event – date, place About INTERREG EUROPE INTERREG EUROPE INTERREG IVC Joint Technical Secretariat Iruma Kravale, The.
TUTORIAL Grant Preparation & Project Management. Grant preparation What are the procedures during the grant preparations?  The coordinator - on behalf.
DIVISION Landstingsdirektörens stab Coral Interreg Europe proposal Project proposal addresses objective 1.2 of the Interreg Europe Programme: Improve the.
1 Framework Programme 7 Guide for Applicants
Regional Policy EU Cohesion Policy 2014 – Regional Policy Why change? Cohesion Policy has been changing already for a long time! ✦ EU has been changing:
The SME Instrument in HORIZON 2020
ICT Policy Support Programme Draft Work Programme October 2008 Totka Chernaeva, NCP.
Technology Strategy Board Driving Innovation Participation in Framework Programme 7 Octavio Pernas, UK NCP for Health (Industry) 11 th April 2012.
1 European Union Regional Policy – Employment, Social Affairs and Inclusion The new architecture for cohesion policy post-2013 High-Level Meeting on the.
Dr. Margaretha Mazura (EMF) ICT Day Opportunities to participate in EU ICT research projects San José, 16 February 2010 Principles of EU Research Funding.
1 THE CITY OF TOMORROW AND CULTURAL HERITAGE Thierry PROST EUROPEAN COMMISSION - DG RTD Directorate I - Preserving the Ecosystem Tel: +32/2/ Fax:
EUROPEAN REGIONAL DEVELOPMENT FUND RECOMMEND Final Event, 11 September 2014, Varna EU Interregional Cooperation State of play and perspectives Jason Martinez.
1 NOT LEGALLY BINDING Energy Info day FP7-ENERGY-2008-RUSSIA 13th December 2007 International Co-operation FP7 Energy Theme Energy EU-Russia Call European.
Dr. Marion Tobler, NCP Environment Evaluation Criteria and Procedure.
“Thematic Priority 3” Draft Evaluation of IP + NoE.
1 SMEs – a priority for FP6 Barend Verachtert DG Research Unit B3 - Research and SMEs.
Regional Policy EU Cohesion Policy 2014 – 2020 Proposals from the European Commission.
PEPPOL is an EU co-funded project CIP-ICT PSP-2007 No PEPPOL Business requiremernts Jostein Frømyr Transport Infrastructure Agreement.
Participation in 7FP Anna Pikalova National Research University “Higher School of Economics” National Contact Points “Mobility” & “INCO”
PROJECT LIFECYCLE.
Danish Agricultural Advisory Service National Centre Possibilities and limits in a Specific Support Action By Erik Fog and Michael Tersbøl, DAAS European.
STAC Extended meeting Coordination/Support Action on Fusion Data General Introduction and Background European Commission Research DG Yvan Capouet Head.
Project preparation workshop “Bringing a transnational project to life” Project idea “Challenges and chances from Climate Change for regional and local.
Dr Aniyan Varghese eGovernment Unit eGovernment Unit Directorate General Information Society Dr Aniyan Varghese eGovernment.
Status of QUACO project
Atlantic Innovation Fund Round VIII February 5, 2008.
Application procedure From theory to practice Dieter H. Henzler, Steinbeis-Transfercenter Cultural Resources Management, Berlin.
1 EUROPEAN FUNDS IN HALF-TIME NEW CHALLENGES Jack Engwegen Head of the Czech Unit European Commission, Directorate General for Regional Policy Prague,
EUROPEAN COMMISSION EUROPEAN UNION IPA 2010 National Programme Bosnia and Herzegovina EU Delegation to Bosnia and Herzegovina Donor Coordination Forum.
EU A new configuration of European Territorial Cooperation Vicente RODRIGUEZ SAEZ, DG Regional Policy, European Commission Deputy Head of Unit.
Negotiation of Proposals Dr. Evangelos Ouzounis Directorate C DG Information Society European Commission.
The EGTC, a suitable instrument for Article 37(6)b? Background and main questions 17 March 2011 | Paris.
Sectoral Operational Programme “INCREASE OF ECONOMIC COMPETITIVENESS” October 2005 MINISTRY OF ECONOMY AND TRADE.
Jörg Niehoff European Commission DG Research - Unit T4: SMEs SMEs in the.
URBACT IMPLEMENTATION NETWORKS. URBACT in a nutshell  European Territorial Cooperation programme (ETC) co- financed by ERDF  All 28 Member States as.
Fabrizio Gagliardi EGEE Project Coordinator EGEE is proposed as a project funded by the European Union under contract IST
ERA-NET Cofund under Horizon 2020 Jörg NIEHOFF DG Research & Innovation Dir. B – Innovation Union and European Research Area Unit B2 – Open Science and.
Consumers, Health, Agriculture and Food Executive Agency 3rd Health Programme The Electronic Submission System (JA 2015) Georgios MARGETIDIS.
2. Status report from WP 3 eCatalogues Copenhagen - 11 December 2008 Giancarlo De Stefano Work Package 3 Coordinator.
Third EU Health Programme National Info day Athens, 21 April 2016 Courtesy of Irène Athanassoudis DG SANTE.
Research and Innovation Actions Innovation Actions Coordination and Support Actions Public Procurement of Innovative Solutions Co-fund SME Instrument ERANET.
Work Plan for the Second Period Bob Jones, CERN First Helix Nebula Review 03 July This document produced by Members of the Helix Nebula consortium.
Launch event ICRI 2016, Cape Town - South Africa Launch event ICRI 2016 Cape Town South Africa David Bohmert Member ESFRI Executive Board Swiss ESFRI Delegate.
Monitoring Expert, NEEMO GEIE
AMICI WP1 – Management, coordination and dissemination
WP3 - Evaluation and proposal selection
3rd Health Programme Grants for Joint Actions What is new
Funding schema to support public/private initiatives
MAES Working Group Meeting Brussels
MACIEJ SZYMANSKI Policy Officer
Micro data linking – call for proposal item 12 of the agenda
Kara Baptista – Evaluation Manager, CEF Telecom - INEA
FP7 SCIENTIFIC NEGOTIATIONS Astrid Kaemena European Commission
ESSnet Projects Pascal JACQUES Unit/B5 Methodology and research
The evaluation process
Directorate General Information Society & Media
EGI-Engage T. Ferrari/EGI.eu.
SOCIAL DIALOGUE WITHIN THE SCOPE OF EUPAN
Juan Gonzalez eGovernment & CIP operations
2012 Annual Call Steps of the evaluation of proposals, role of the experts TEN-T Experts Briefing, March 2013.
Assembly of Members – 12 March 2019
eContentplus 2007 Work Programme
Presentation transcript:

André Hoddevik, Project Director Enlargement of the PEPPOL-consortium 2009

Content Background (CIP ICTPSP Draft Work Programme 2009) Conditions and characteristics Expected impact Methodology to encompass all Member States Conditions for enlargement Criteria for enlargement Terms and conditions Timelines – progress Deliverable

CIP ICTPSP Draft Work Programme 2009 (agreed by the Programme Committee ) Theme 3: ICT for government and governance Objective 3.1: Enlargement of the e-Procurement Pilot PEPPOL Objective 3.2: Enlargement of the e-IDM Pilot STORK Funding instrument Pilot Type A - It is intended to support the extension of the e- Procurement Pilot PEPPOL for up to 5 M€ of EU contribution

Conditions and characteristics (agreed by the Programme Committee ) The pilot extension should have the following characteristics: It must include at least three additional relevant administrations (or legal entities designated to act on behalf of the national administrations) from Member States or associated countries not yet in the PEPPOL Consortium The outcome will lay the foundation for the methodology to encompass all Member States independently of the state of development of their eProcurement strategies It will develop a long term sustainability plan for pan-European deployment The additional activities addressed by the extension and the way they complement the existing PEPPOL pilot will have to be described in the proposal. In particular, attention will be paid on the additional eProcurement cross border cases. Proposal has to be submitted by the coordinator of the running PEPPOL project, acting on behalf of all the participants in the existing project, together with the new participants.

Expected impact (agreed by the Programme Committee ) Improved competitiveness of European businesses and particular SMEs by providing them with the tools to access large European markets for public services. Development of markets for innovative ICT solutions for e-Procurement.

Methodology to encompass all Member States (I) (To be agreed by the PEPPOL Governing Board and to be aligned with Third Call for Proposal) Gradual approach… Group 1: Ready to contribute in the implementation phase and the whole pilot period – Well functioning national solutions by – Resources and relevant technical competence available for contribution to construction of building blocks based on agreed specifications Group 2: Ready to contribute in whole pilot period – Well functioning national solutions by – Resources and relevant technical competence only available for implementation of building blocks Group 3: Ready to contribute in last part of pilot period – National solutions in advanced pilot stage by Group 4: Able to contribute by end of pilot period – eProcurement strategies developed and national solutions planned by – National solutions in advanced pilot stage by

Timeline (To be agreed by the PEPPOL Governing Board and to be aligned with Third Call for Proposal) Group 2 Group 1 Group 3 Group Pilot phase Construction phase PEPPOL operational

Methodology to encompass all Member States (II) (To be agreed by the PEPPOL Governing Board and to be aligned with Third Call for Proposal) Differentiated strategies… Group 1 and group 2: “Best practice examples” – Role of PEPPOL: Document and share experiences, strategies, functional specifications etc Group 3: “Political will exists” – Role of PEPPOL: Support implementation of national solutions through networking in the operational reference group Group 4: “Starting from scratch” – Role of PEPPOL: Support establishment of eProcurement strategies and implementation of national solutions through networking in the operational reference group

Conditions for enlargement (To be agreed by the PEPPOL Governing Board and to be aligned with Third Call for Proposal) 1.The enlargement will first focus on increasing the geographical coverage, in particular where Member States have now deployed an e- Procurement infrastructure. 2.It will secondly focus on the strengthening of the topics addressed by PEPPOL (e.g. Virtual Company Dossier, etc) by increasing the number of cross- border situations. 3.Thirdly, it must develop a long-term sustainability plan for pan-European deployment.

Criteria for participation (To be agreed by the PEPPOL Governing Board and to be aligned with Third Call for Proposal) Prerequisite: Existing eProcurement infrastructure Relevant administrations or legal entities designated to act on behalf of the national administrations, not yet a PEPPOL- participant Accept the existing Grant Agreement and Consortium Agreement Contribution to: Increasing the geographical coverage Strengthening of the topics addressed by PEPPOL Develop a long-term sustainability plan

Criteria for participation – overall (To be agreed by the PEPPOL Governing Board and to be aligned with Third Call for Proposal) Demonstrate engagement: Reference to national e-strategy documents within eGovernment or eProcurement strategies Political will Existing national solutions and resources enabling participation in one or more PEPPOL work packages Sustainability in national solutions Be prepared to coordinate other national participants – one single PEPPOL national contact point (SPOC) Take the role to establish the National Consortium Be prepared to set up National Consortium Agreements Description of National Solution, including: Volume of transactions National coverage, geographical and number of users…

Geographical coverage – criteria (To be agreed by the PEPPOL Governing Board and to be aligned with Third Call for Proposal) Population, size of economy Public procurement volumes No of transactions in existing eProc solutions No of participants – – Economic Operators and Public Authorities Level of existing cross border trade Strengthening… – National Coverage of eProcurement processes – Contribution to PEPPOL within one or more Work Packages – Existing solutions – Volume of cross border transactions

Strengthening topics – criteria (To be agreed by the PEPPOL Governing Board and to be aligned with Third Call for Proposal) Prerequisite: – Existing nation/ beneficiary in PEPPOL Consortium Strengthening… – National Coverage of eProcurement processes – Contribution to PEPPOL within one or more Work Packages – Existing solutions – Volume of cross border transactions

Long term sustainability for Pan- European deployment – criteria (To be agreed by the PEPPOL Governing Board and to be aligned with Third Call for Proposal) Prerequisite – Capability to enable long term sustainability – Resources & Commitment Long term sustainability – Operational sustainability – Strategically ingrained – Aligned legislation – Allocated resources – Allocated competence

Terms and conditions (To be agreed by the PEPPOL Governing Board and to be aligned with Third Call for Proposal) Accept PEPPOLs existing Grant Agreement and Consortium Agreement Financial contribution: – 50% reimbursement rate of eligible cost from effective date of amended contract – Participation in proposal work: Own risk and cost until effective date of amended contract

Planned timeline (To be agreed by the PEPPOL Governing Board and to be aligned with Third Call for Proposal) The 3rd call supposed to be open: Deadline for submitting proposal or the revised technical annexes. The EC - Evaluation process The scope is to have the negotiation process finished and revised TA signed Newcomers ”onboard” 29 January 09 2 June 09 June 09 October 09 (?) November 09 (?)

Possible timeline – proposal process (To be agreed by the PEPPOL Governing Board and to be aligned with Third Call for Proposal) Letters of intent The 3rd call open Information meeting with our prioritisation of candidate participants Invitation to participate Commitment from invited participants Kick of proposal writing Draft proposal v1 Draft proposal v2 Presentation PEPPOL design and planned deliverables in Oslo conference Draft proposal v3 Final proposal submitted 20 January 29 January 4 February 11 February 27 February 4 March 1 April 29 April 19 May 27 May 2 June

First expected “deliverable” Letter of intent – start immediately – this process requires time - lessons learned 20th of January 2009