NCSX Major Procurement Status July 20, 2005. Steady Progress on C1 and C2 The C1 was transferred to the 5 axis machine last Saturday; finish machining.

Slides:



Advertisements
Similar presentations
DISTRICT FIVE CONSTRUCTION CONTRACT ADMINISTRATION UPDATE TRAINING Submission of Working Schedule Specification SP A.
Advertisements

NCSX Mod Coil C1 features requiring rework at PPPL.
MATERIALS TESTING.
1 Metal Casting Processes Chapter 11 Test yourself!
Forward scintillators in ATLAS: cryostat and MBTS CERN Dubna Michigan State University University of Texas-Arlington presented by J. Huston Michigan State.
First Article Inspection Report
Vacuum Vessel Production Readiness Review
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
FDR Station 3 lift fixture, laser screens and brackets T. Brown and L. Morris with analysis support from A. Brooks December 3, 2007.
Process Specification Guidelines FAA/NASA Workshop 6 August 2002.
NCSX Vacuum Vessel Overview Paul Goranson WBS 12 Manager Vacuum Vessel Manufacturing Study Kickoff meeting April 29, 2003.
MUTAC Review, 9 April MuCOOL and MICE Coupling Magnet Status Michael A. Green Lawrence Berkeley Laboratory Berkeley CA
Tracker Solenoid Module Design Update Steve VirostekStephanie Yang Mike GreenWing Lau Lawrence Berkeley National LabOxford Physics MICE Collaboration Meeting.
Progress on the MICE 201 MHz Cavity Design Steve Virostek Lawrence Berkeley National Lab RF Working Group Fermilab August 22, 2007  automatic.
Status of Coil Structural Design and Magnetic-Structural Analysis Presented by X.R. Wang Contributors: ORNL: D. Williamson UCSD: S. Malang, A.R. Raffray.
TAGGER MAGNET DESIGN Presented by Tim Whitlatch Hall D Tagger Magnet Design Review July 10,
First Article Inspection
Cryomodule Concept for the ODU RF Dipole Crab Cavity Tom Nicol* - Fermilab December 10, 2013 * With lots of help from HyeKyoung, Tom J, Shrikant, Ofelia,
13.4. GENERAL DESIGN CONSIDERATIONS: PRESSURE VESSELS
1 An Overview of the Request for Proposals for Production of NCSX Modular Coil Winding Forms [RFP F] July 12, 2004 P. Heitzenroeder, F. Malinowski,
ZTF Cryostat Finite Element Analysis Andrew Lambert ZTF Technical Meeting 1.
September 30, 2003 NCSX Modular Coil Winding Form Prototype FDR1 NCSX Prototype Modular Coil Winding form FDR Phil Heitzenroeder PPPL September 30, 2003.
NCSX Vacuum Vessel Joint Design Mike Viola PPPL July 1 st, 2003.
F.E.T.S. RFQ Support Structure by Peter Savage 21 ST October 2009.
NCSX NCSX Project Update Hutch Neilson, Project Manager for the NCSX Team Princeton Plasma Physics Laboratory Oak Ridge National Laboratory Briefing for.
BEHAVIOUR OF MATERIALS
1 NCSX Modular coil winding pack To shim or not to shim? NCSX WBS 1 Engineering Meeting July 7, 2004 What is requirement? What is baseline winding pack.
Research Supervisor Training Programme Regulations & Processes.
FNAL QXF Curing Mold Miao Yu, FNAL 05/07/2013. FNAL Short Curing Press 2 2 meter long Capacity (pump psi) Max. force/cylinder kN (ton) Spacing cm(inch)
Refrigeration Plant Design – Progress Report 1 Kevin W. Hunter MANE-6980 Engineering Projects.
Mechanical Design of Process Equipment FUNDAMENTAL PRINCIPLES AND EQUATIONS Principal stresses Theories of failure
Chair of Software Engineering Exercise Session 6: V & V Software Engineering Prof. Dr. Bertrand Meyer March–June 2007.
Beam line Experiment area SC magnet Pion production target
11/2/2005Mike Viola1 November Lehman Review November 2, 2005 NCSX VVSA NCSX Vacuum Vessel Fabrication Major Tool and Machine – S F 3 120° segments.
LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 12 Jul 2011 LAV construction status: a snapshot 2 A1 Arrived at CERN 29 Jun.
NSTX Supported by NSTX Centerstack Upgrade Project Meeting P. Titus April 14, 2010 PF4/5 Terminal Stress Existing PF4/5 Support Weld Algorythm Moment Influence.
SCH Controls Readiness Review- Cryostat Nov 4-5, 2015 Kurt Cantrell.
NCSX NCSX Vacuum Vessel R&D, Risk Management and Manufacture NCSX Preliminary Design Review October 7-9, 2003 Princeton, NJ Mike Viola, Phil Heitzenroeder,
M. Gilchriese - December 2000 Disk Sector Status E. Anderssen, M. Gilchriese, F. Goozen, N. Hartman, T. Johnson, F. McCormack, J. Wirth and D. Uken Lawrence.
Strykowsky 1Project Review November 2, 2005 NCSX Project Review November 2, 2005 Cost and Schedule Ron Strykowsky.
Mechanical Tests on Structure Mechanical Tests are being started using real extrusions. Purpose of the tests are to evaluate the accuracy and validity.
NCSX VACUUM VESSEL PL Goranson Final Design Review November 17, 2005 Man Access Port /Lateral Supports NCSX.
Stresses and Deformations in 14 T Nb 3 Sn Solenoid of 0.8 m I.R. and 1.0 m O.R. & Half Length Bob Weggel 10/7/10.
9/28/20051 Mike Viola 1, T. Brown 1, P. Heitzenroeder 1, F. Malinowski 1, W. Reiersen 1, L. Sutton 1, P. Goranson 2, B. Nelson 2, M. Cole 2, M. Manuel.
Preparations for working on Station 1 November 22, 2005.
Fundamentals of Project Control Chapter 11 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project.
NCSX VVSA / MCWF FDR A Systems Engineering Perspective Wayne Reiersen Bob Simmons NCSX VVSA / MCWF FDR May 19-20, 2004 PPPL.
1 First wall mods status NCSX SIT Meeting July 1, 2002 Points at 0, 30, 60 degrees from Art Points x in cross sections RF launchers bigger issue.
January 22-24, LCLS Week 2 The Extruded Aluminum vacuum chamber…
1 NCSX VV Assembly Joint Issue B. Nelson 17 Mar 2005.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
QXF magnet integration Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013.
1 Space-Frame Endplate Design and Construction for LP2 and ILD Dan Peterson Laboratory for Elementary-Particle Physics, Cornell University LCTPC-Peterson.
1 Long QXF Mirror Fabrication (MQXFPM1) Rodger Bossert HiLumi-LARP Collaboration Meeting May 18-20, 2016 SLAC R. Bossert - HiLumi Collaboration Meeting.
7/24/011 TFTR D&D Status July 24, /24/012 Project Status The TFTR D&D Project will be completed on time and within budget.
NCSX Vacuum Vessel Fabrication
Fredrik Fors Mechanical Engineering, JLab 04/22/2016
PS Internal Dump - actuation system
Cutting and welding First internal LHC Dipole Diode Insulation Consolidation Review 10 Oct 2017 G. Favre / A. Amorim Carvalho G. Favre EN-MME.
Cutting and welding First internal LHC Dipole Diode Insulation Consolidation Review 10 Oct 2017 G. Favre / A. Amorim Carvalho G. Favre EN-MME.
JLAB MEETING FDR – April 23-24th 2013
Mold close→Filling→Packing →Cooling→Mold open→Part ejection.
First Article Inspection
Milan Brumovsky, Milos Kytka, Milan Marek, Petr Novosad
Stress Analysis of Universal Tilt Kit Attachment Points
Project Status Review Purpose: To anticipate prototype performance
LCLS Week 2 The Extruded Aluminum vacuum chamber…
MQXF coil cross-section status
SNS PPU Helium Vessel Design and Assembly
LCLS Vacuum System Plans (July 07)
Presentation transcript:

NCSX Major Procurement Status July 20, 2005

Steady Progress on C1 and C2 The C1 was transferred to the 5 axis machine last Saturday; finish machining is now underway. –Three relatively minor design changes are being processed to resolve recently uncovered issues (lead block attachment; poloidal break insulator; O-ring groove extent). –All machining is expected to be completed in early August and it is expected to ship in the latter half of August. Machining of the C2 continues in accordance with their predictions. –MTM projects completion in the originally projected 12 weeks.

The A1 “Thin Wall” Issue Received Much Attention This Week thin areas In light blue Machined Casting FEA model – thin areas are tan. Note That Much Of the ThinArea is Machined Away,Lessening its Effect

SCANCO data well quantifies the actual wall thicknesses Specified thickness is 1.375” / Thinnest actual section is 1.18”. “Guesstimate” is the thin area is 15% of the wall area. For analysis purposes, the thin area was all modeled as being 1.05” thick to bound the problem

Even with a t=1.05” (which is less than the measured t=1.18”), and ALL Type A coils modeled this way, Stress is NOT an Issue; Deflections Increase ~20%. Max. Stress Is NOT in this region. Model Condition Max. displ. mm Max. Equiv. stress MPa Original Model; E=193 MPa (shell) (coil) 168 (shell) 239 (coil) Simulating ALL Type A castings with a thin sect. similar to A1 with t=1.05”; E adjusted to 145 to reflect spec value (shell) +19.2%; (coil) +21.7% 161 (shell) -4.2% 248 (coil) +4.7% These increases are mostly due to updating the modulus of the alloy from the 193 MPa used in the original analysis to the 145 MPa spec value rather than localized the thinning of the wall.

The Shell Has Good Factors of Safety on the Allowable Stress The allowable is the lesser of ½ ultimate or 2/3 yield. Using the spec minimum, this would be (the lesser of or 322.5) For the thin area of the shell, the factor of safety (FS) on allowable is 327.6/161= 2.03.

Path Forward for the Type A Castings MTK was authorized to proceed with upgrades of A1 last Friday. EIO is taking steps to assure that the walls of the remaining Type A castings will be no thinner than A1 – i.e., 1.18”. We will process the non-conformance report (NCR) and an Engineering Change Proposal for this. –Analysis supports accepting A1 “as is”. –We will likely request that the remaining Type A castings be made similar to A1 but with the wall thicknesses being no thinner than 1.18”. EIO is evaluating schedule impact yet.

Progress on the C3, C4 Castings and the Type B Pattern Is Good C3 was returned from radiography, and processing of defect indications is underway. –Projected to ship to MTM by 8/5. C4 was poured last week, and was broken out of the of the mold. –Initial indications are good. The Type B pattern is on track for shipment to MTK on 9/15.

The Pace is Picking Up on the Vacuum Vessel MTM followed up on discussions held with Mike Viola last week on ways to improve schedule. –Now have a second press in operation and more personnel assigned. –The first 60 degree half field period vessel segment was welded together. –The 5 panels for the upper ¼ period has been welded, and the 5 panels have been for the remaining ¼ period have been formed.