NOAA GPRC Report Fangfang Yu and Fred Wu 05 March 2012.

Slides:



Advertisements
Similar presentations
10 th GSICS EXP Meeting, June , Geneva NOAA GPRC Report to the GSICS 10 th EXP 6-8 June 2011, Geneva, Switzerland.
Advertisements

Combining Multiple References GSICS Web Meeting
Likun Wang 1, Yong Han 2, Xin Jin 3, Yong Chen 1, Xiaozhen Xiao 3 and Denis Tremblay 4 1. UMD/ESSIC/CICS, College Park, MD
1 Weekly Report on GOES-14 PLT Science Test NOAA / NESDIS / STAR X. Wu, G. Rancic, F. Yu December 18, 2009.
China Meteorological Administration National Satellite Meteorological Center Training Course on Satellite Meteorology 2012 ) Oct.22-Nov.2 Beijing China.
Assessment of GOES Imager Infrared Radiometric Calibration Accuracy toward Long-term Climate Data Record Fangfang Yu 1*, Xiangqian Wu 2, Scott Lindstrom.
OpenDAP Server-side Functions for Multi-Instrument Aggregation ESIP Session: Advancing the Power and Utility of Server-side Aggregation Jon C. Currey (NASA),
NASA, CGMS-41, July 2013 Coordination Group for Meteorological Satellites - CGMS Calibration/validation of Operational Instruments at NASA Langley Research.
GSICS Bias Monitoring Routine comparisons of satellite radiances against reference GSICS Correction Function to correct issued radiances For consistent.
Center for Satellite Applications and Research (STAR) Review 09 – 11 March 2010 Effective shift of SRF assuming 2.1  m ice Global Space-based Inter-Calibration.
Xiangqian Wu and Mitch Goldberg NOAA/NESDIS Center for Satellite Applications and Research (STAR) P1.16 GLOBAL SPACE-BASED INTER-CALIBRATION SYSTEM (GSICS)
GSICS Coordination Center Update GSICS Executive Panel Meeting 10 6 June 2011 Fuzhong Weng and Bob Iacovazzi, Jr. GSICS Coordination Center.
Global Space-based Inter- Calibration System (GSICS) Progress Report Mitch Goldberg, NOAA/NESDIS GSICS Executive Panel chair.
The Global Space-based Inter- Calibration System Mitch Goldberg, NOAA/NESDIS GSICS Executive Panel chair NOAA/NESDIS.
GSICS Coordination Center Report GSICS Executive Panel Meeting 14 GSICS Coordination Center.
Mathew M. Gunshor* 1, Scott Lindstrom 2, Timothy J. Schmit 3, David C. Tobin 1, W. Paul Menzel 1 1 Cooperative Institute for Meteorological Satellite Studies.
Japan Meteorological Agency, June 2016 Coordination Group for Meteorological Satellites - CGMS JMA’s Cal/Val activities Presented to CGMS-44 Working Group.
Agency xxx, version xx, Date xx 2016 [update in the slide master] Coordination Group for Meteorological Satellites - CGMS Introduction to GSICS Presented.
GSICS web meeting on Planning for Annual GSICS WG meeting Agenda.
Characterizing Diurnal Calibration Variations using Double-Differences Fangfang Yu.
Bias analysis and correction for MetOp/AVHRR IR channel using AVHRR-IASI inter-comparison Tiejun Chang and Xiangqian Wu GSICS Joint Research and data Working.
GSICS Coordination Center Report Fangfang Yu, Fuzhong Weng, Fred Wu and George Ohring NOAA/Center for Satellite Applications and Research 8 April, 2013.
2013 GSICS Joint Meeting, Williamsburg VA, USA, March GSICS Collaboration Servers Status: 2013 Peter Miu (EUMETSAT) CMA, CNES, EUMETSAT, ISRO,
NOAA GPRC Report 2013 GSICS Annual Meeting Williamsburg, VA 03/04/ /08/2013.
JMA GPRC report Arata OKUYAMA Meteorological Satellite Center,
Impacts of GSICS inter-calibration on JAXA’s HIMAWARI-8 SST
Monitoring of SST Radiances
GSICS Web Meeting, 17 November 2011
GRWG/GDWG Joint Web Meeting Agenda
2016 GSICS Annual Meeting 29 Feb. – 4 March 2016 Tsukuba, Japan
Spectral Band Adjustment Factor (SBAF) Tool
Masaya Takahashi Meteorological Satellite Center,
GOES-East DCC analysis
FY2-IASI and FY3C-IASI towards Demo
Fangfang Yu and Fred Wu 22 March 2011
3.m. GEO-LEO IR Progress at NOAA
NOAA-20 and Suomi NPP ATMS On-orbit Performance
Users' Feedback on GSICS Products in Demonstration Phase
Meteosat Second Generation
VIS/NIR sub-group discussion
Intercomparison of IASI and CrIS spectra
Diurnal and Seasonal variations of COMS IR inter-calibration
Radiometric Consistency between AVHRR, MODIS, and VIIRS in SST Bands
Update on GSICS Product Development
Xiuqing Hu, Zhe Xu, Lin Chen
Dorothee Coppens.
GSICS IR Reference Uncertainty & Traceability Report
GSICS Research Working Group Web Meeting :00-13:00 UTC Reference Instruments and their Traceability.
Meteorological Satellite Center, Japan Meteorological Agency
GRWG+GDWG Web Meeting on Calibration Change Alerts
Progress on COMS IR inter-calibration
GSICS Coordination Center (GCC) Report
SRF Retrieval Using VIIRS/AIRS/IASI radiances
Use of GSICS to Improve Operational Radiometric Calibration
Developing GSICS products for IR channels of GEO imagers Tim Hewison
Likun Wang Univ. of Maryland, College Park, MD;
Spectral Correction for Inter-comparion between VIIRS and MODIS TEB
Hot summary of the Fourth GSICS Users Workshop
GSICS IR Reference Uncertainty & Traceability Report Tim Hewison
GSICS Products’ Improvements and Developments
GSICS Data and Products Servers
GSICS Server Upgrade - Requirements for New Deliverables
Tim Hewison1 and all GSICS Developers EUMETSAT
G16 vs. G17 IR Inter-comparison: Some Experiences and Lessons from validation toward GEO-GEO Inter-calibration Fangfang Yu, Xiangqian Wu, Hyelim Yoo and.
IASI / AIRS / CRIS cross-calibrations 5a 0:20
Infrared Sub-Group Report Tim Hewison
GSICS: A WIGOS Component
Inter-calibration result of COMS/MI using before and after reprocessed CrIS data March 2019 Minju Gu and Dohyeong Kim.
GSICS IR Reference Uncertainty & Traceability Report
Midnight calibration errors on MTSAT-2
Presentation transcript:

NOAA GPRC Report Fangfang Yu and Fred Wu 05 March 2012

7 th GSICS Working Groups Meeting, Beijing, China, 5-8 March 2012  Operation Status »GEO Imager vs. AIRS/IASI »Bias monitoring Web  Support NOAA’s Satellite Operations »GOES-14/15 PLT »METOP-B AVHRR Re-calibration »GOES-13 Stray Light Correction  Emerging Capacity »NPP »METOP-B Outline 2

MTSAT-1R FY-2C AIRS IASI GOES-10 GOES-8 Aug2003 Jun2007 Aug08 Meteosat-7 Jun06 GOES-12 GOES-11 Jun06 Meteosat-8 Aug08 Jan2004 Oct2004 Jun W GEO-LEO Retro- Processing Apr/04 Jan07 Jun07 Aug08 Completed! GCC

7 th GSICS Working Groups Meeting, Beijing, China, 5-8 March 2012 Time-series of mean Tb bias for GOES-12 Imager IR Channels G12 Ch2 (3.9μm, midnight)G12 Ch3 (6.5μm, daytime) G12 Ch4 (10.7μm, daytime)G12 Ch6 (13.3μm, daytime)

7 th GSICS Working Groups Meeting, Beijing, China, 5-8 March 2012 SRF Correction for G12 Imager Ch13.3um during its Mission Life using back- processing + forward-processing data Yu and Wu, 2012, “Correction for GOES Imager spectral response function using GSICS II: Applications ”, submitted to IEEE special issue on the instrument inter-calibration. Relation between the mean Tb bias and the optimal SRF shift Mean Tb Bias before SRF Correction Mean Tb Bias after SRF Correction Decontamination Events

7 th GSICS Working Groups Meeting, Beijing, China, 5-8 March 2012 GEO-LEO Inter-Calibration Products  Products download server: » » Near Real-time Correction – update everyday » Re-analysis Correction – updated once per month  New product monitoring wiki-website: » 6

GOES-14/15 PLT Imager Ch3 & Ch 6 SRF Time-series of Tb bias to AIRS/IASI for GOES-14 Ch3 (left) and GOES-15 Ch3 (right) Tb bias to IASI with RevE SRF (black) and RevG SRF (red). Left: GOES-14, right: GOES-15 7 Bias with ITT Rev. E (K) Bias with ITT Rev. H (K) Bias with NOAA Correction (K) NOAA Correction (Shift) (cm -1 ) GOES-14 Ch −8.25 GOES-14 Ch GOES-15 Ch GOES-15 Ch

7 th GSICS Working Groups Meeting, Beijing, China, 5-8 March 2012 METOP-B AVHRR Re-calibration  A307 was calibrated in June 2002  Re-calibration in Jan 2011 found several issues  NOAA worked with NASA, ITT, and EUMETSAT to resolve the anomalies.  One of the tools was Instrument Performance Monitoring 8 Ch 3BCh 4Ch5 NOAA-19, last year+1.6%-0.3%-0.0% METOP-A, last year+1.3%+0.8%+0.3% METOP-A, since 2006/10/30+4.0%+2.8%+1.3%

7 th GSICS Working Groups Meeting, Beijing, China, 5-8 March 2012 Stray Light 9

GOES-13 Imager 12/053/04:39 Southern Hemi, Channel 2 Uncorrected for SL SL Corrected 10 J. Paul Douglas

GOES-13 Imager 12/053/05:09 Southern Hemi, Channel 2 Uncorrected for SL SL Corrected 11 J. Paul Douglas

GOES-13 Imager 12/053/05:39 Southern Hemi, Channel 2 Uncorrected for SL SL Corrected An artifact has been introduced 12 J. Paul Douglas

7 th GSICS Working Groups Meeting, Beijing, China, 5-8 March 2012 Artifact in the 5:39 Corrected Frame (0 GVAR count issue can be addressed next release) 13 J. Paul Douglas

7 th GSICS Working Groups Meeting, Beijing, China, 5-8 March 2012 Suomi National Polar-orbiting Partnership Satellite 14

7 th GSICS Working Groups Meeting, Beijing, China, 5-8 March 2012 Suomi National Polar-orbiting Partnership Satellite 15 ATMS SDR Team

7 th GSICS Working Groups Meeting, Beijing, China, 5-8 March 2012 Suomi National Polar-orbiting Partnership Satellite 16 VIIRS SDR Team

7 th GSICS Working Groups Meeting, Beijing, China, 5-8 March 2012 Suomi National Polar-orbiting Partnership Satellite 17 CrIS SDR Team

7 th GSICS Working Groups Meeting, Beijing, China, 5-8 March 2012 Suomi National Polar-orbiting Partnership Satellite 18 OMPS SDR Team

7 th GSICS Working Groups Meeting, Beijing, China, 5-8 March 2012 Suomi National Polar-orbiting Partnership Satellite 19 M. Goldberg

7 th GSICS Working Groups Meeting, Beijing, China, 5-8 March 2012 AIRS and CrIS image at 900cm-1 CrI S 02/25/2012, 22:38:02 UTC, AQUA at (76.71S, 98.17W), NPP at (76.71S, 98.17W), 0.24 km, 28 second L. Wang

7 th GSICS Working Groups Meeting, Beijing, China, 5-8 March 2012 AIRS CrIS SNO Comparison (740 – 840 cm -1 ) Reduced spectral resolution No missing or bad channels Agrees well L. Wang

7 th GSICS Working Groups Meeting, Beijing, China, 5-8 March 2012 GOES-13 Imager IR SRF & Simulated AIRS/CrIS/IASI TOA Tb over Clear Tropic Ocean

7 th GSICS Working Groups Meeting, Beijing, China, 5-8 March 2012 GOES-13 vs. CrIS Collocation Scenes on 2/24/ Collocations range across multiple LEO orbits, ~5-6 hours 2.Scene Tb range from extremely cold (~210K at Ch10.7um) to very hot (~300K)

7 th GSICS Working Groups Meeting, Beijing, China, 5-8 March 2012 Mean Tb bias (GEO-LEO) vs. median time of the collocated scenes – Ch2 (6.5um) UTC time GOES-13 day-timeGOES-13 night-time

7 th GSICS Working Groups Meeting, Beijing, China, 5-8 March 2012 Mean Tb bias (GEO-LEO) vs. median time of the collocated scenes – Ch3 (10.7um) UTC time GOES-13 day-timeGOES-13 night-time

7 th GSICS Working Groups Meeting, Beijing, China, 5-8 March 2012 Mean Tb bias (GEO-LEO) vs. median time of the collocated scenes – Ch6 (13.3um) UTC time GOES-13 day-timeGOES-13 night-time

7 th GSICS Working Groups Meeting, Beijing, China, 5-8 March 2012 Mean Tb bias (GEO-LEO) vs. median time of the collocated scenes – Ch6 (13.3um) UTC time GOES-13 day-timeGOES-13 night-time METOP-AMETOP-b

7 th GSICS Working Groups Meeting, Beijing, China, 5-8 March 2012 Suomi National Polar-orbiting Partnership Satellite 28 S. Blonski and C. Cao Traditional SNO SNO x for Aqua & NPP (15 min apart – extended to low latitude) Also for METOP-A/B?

7 th GSICS Working Groups Meeting, Beijing, China, 5-8 March 2012  Operation Status »Normal  Support NOAA’s Satellite Operations »Several examples  Emerging Capacity »Expect new challenges and opportunities with NPP and METOP-B Summary 29