D. Li, Project X Collaboration Meeting, Fermilab (October 25-27, 2011) Overview of Project X Frond-End R&D at LBNL Derun Li Project X Collaboration Meeting.

Slides:



Advertisements
Similar presentations
Imperial College 1 Progress at the RAL Front End Test Stand J. Pozimski Talk outline : Overview Ion source development LEBT RFQ Beam Chopper MEBT.
Advertisements

Final Design of a CW Radio-Frequency Quadrupole (RFQ) for the Project X Injector Experiment (PXIE)* Abstract: The Project X Injector Experiment (PXIE)
Laboratori Nazionali di Legnaro (Italy) DTL design status A. Pisent.
C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
Project X Injector Experiment (PXIE) Steve Holmes Fermilab Proton Accelerators for Science and Innovation: Second Annual Meeting Rutherford Appleton Laboratory.
RF Measurement Plan Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory January 20, 2011 MICE Video Conference Meeting.
MICE RF Cavity Measurements Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory March 26, 2010 University of California, Riverside,
 An h=4 (30 MHz) RF system will be used for electron operation. For protons, this would correspond to h=56, and the 1 kV maximum gap voltage would only.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Front End Test Stand Klystron Commissioning Alan Letchford UKNF Plenary Meeting 22 nd April 2009.
201 MHz and 805 MHz Cavity Developments in MUCOOL Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Nufact 2002 Workshop, London,
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
Ion Source and RFQ Douglas Moehs Fermilab Accelerator Advisory Committee May 10 th – 12 th, 2006 Thanks to Martin Stockli (SNS), Robert Welton (SNS), Jens.
Technical aspects of the ATLAS efficiency & intensity upgrade Peter N. Ostroumov ATLAS Users Workshop, August 8-9, 2009.
Normal Conducting RF Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory March 5-6, 2013.
Imperial College 1 Plans and Costs Front End Test Stand Aim is to demonstrate a 60 mA, 2 ms, 50 pps chopped beam at 3 MeV RAL/ISIS (ION SOURCE, CHOPPER,
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
Neutrino Factory Workshop, IOP, 28th October 2003 RF Systems David M Wilcox.
Anders Sunesson RF Group ESS Accelerator Division
Status of the Front End Test Stand April Infrastructure R8 refurbished Laser lab under construction Vacuum system for first section delivered Stands.
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
Project X Injector Experiment (PXIE) Sergei Nagaitsev Dec 19, 2011.
ICFA-HB 2004 Commissioning Experience for the SNS Linac A. Aleksandrov, S. Assadi, I. Campisi, P. Chu, S. Cousineau, V. Danilov, G. Dodson, J. Galambos,
Overview and Status of the Fermilab High Intensity Neutrino Source R&D Program Giorgio Apollinari for Bob Webber.
MICE RF Cavity Measurements Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory July 8, 2010 Rutherford Appleton Laboratory, UK.
LIU Day – 11 th april 2014 ALESSANDRA LOMBARDI LINAC4 COMMISSIONING OVERVIEW.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
MICE RF System Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Andrew Moss STFC Daresbury Laboratory MICE UK.
RFQ – Design, Components and Fabrication 1 We aim to design and manufacture a Radio Frequency Quadrupole (RFQ).
Progress on MICE RFCC Module for the MICE Experiment * Allan DeMello, Nord Andresen, Michael Green, Derun Li, Heng Pan, Steve Virostek, Michael Zisman.
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
Development of High Current Bunched Magnetized Electron DC Photogun MEIC Collaboration Meeting Fall 2015 October 5 – 7, 2015 Riad Suleiman and Matt Poelker.
Progress of Bunched Beam Electron Cooling Demo L.J.Mao (IMP), H.Zhang (Jlab) On behalf of colleagues from Jlab, BINP and IMP.
THE LINAC4 RFQ – Experience with Design, Fabrication and Tuning C. Rossi and the RFQ Project Team GSI Review – 20 November 2013.
LINAC4 emittance measurements BI Day Divonne, 24 th November 11/24/2011 B.Cheymol, E. Bravin, D. Gerard, U. Raich, F. Roncarolo BE/BI 1.
PXIE Ion Source and LEBT Installation Status L. Prost, B. Hanna, R. Andrews Project X Technical Meeting October 29 th, 2013.
Status of MICE RF for Step V’ (at LBNL) Derun Li Lawrence Berkeley National Laboratory December 6, 2014.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
The Front-End System Study of Project X Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory March 16, 2010 Fermi National Accelerator.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
PIP-II R&D Program PXIE Ion source and LEBT Lionel Prost PIP-II Machine Advisory Committee Meeting March 2016.
D. Li and S. Virostek for PXIE RFQ team Center for Beam Physics Lawrence Berkeley National Laboratory March 6, 2012.
Front-End System: Ion Source and RFQ Accelerator
PXIE RFQ Engineering Design Steve Virostek Engineering Division Lawrence Berkeley National Laboratory April 10, 2012 Project X Collaboration
Warm Front End Concept A. Shemyakin PIP-II Machine Advisory Committee 9-11 March 2015.
PXIE RFQ Derun Li Lawrence Berkeley National Laboratory PXIE Program Review January 16-17, 2013.
WG8 – Linac Front-End Bob Webber/Derun Li Group Leaders Project X Collaboration Meeting September 8-9, 2010.
PXIE RFQ Design Overview Derun Li for PXIE RFQ Design Team Center for Beam Physics Accelerator and Fusion Research Division Lawrence Berkeley National.
High Intensity Neutrino Source HINS Linac Front-End R&D --- Systems Integration, Beam Diagnostics Needs, and Meson Lab Setup Bob Webber.
PXIE RFQ Engineering Design and Fabrication Project X Fall 2011 Collaboration Meeting Fermilab – October 25, 2011 Steve Virostek - Engineering Division.
Welcome to the RFQ Meeting
NICA injection complex status
A. Martynov on behalf of accelerator division.
Overview of the RFCC Module and 201-MHz Cavity Design
Progress in the Multi-Ion Injector Linac Design
Physics design on Injector-1 RFQ
BUNCH LENGTH MEASUREMENT SYSTEM FOR 500 KV PHOTOCATHODE DC GUN AT IHEP
Status of the Front End Test Stand April 2007.
Injector Performance Requirements Conventional Facilities Update
ADS Accelerator Program in China
LINAC4 commissioning plans etc.
Advanced Research Electron Accelerator Laboratory
commissioning and measurements
Physics Design on Injector I
(Beam) Commissioning Plan
ICAP 2006, Chamonix Mont-Blanc
Status of the JLEIC Injector Linac Design
Injector for the Electron Cooler
Multi-Ion Injector Linac Design – Progress Summary
Presentation transcript:

D. Li, Project X Collaboration Meeting, Fermilab (October 25-27, 2011) Overview of Project X Frond-End R&D at LBNL Derun Li Project X Collaboration Meeting October 25-27, 2011 Fermi National Accelerator Laboratory Batavia, IL

D. Li, Project X Collaboration Meeting, Fermilab (October 25-27, 2011) Summary of the Front-End R&D H - Ion Source (Qing Ji)H - Ion Source (Qing Ji) –Procurement of D-Pace H- Ion Source –Acceptance Test at TRIUMF –Acceptance Test at LBNL Setup and MeasurementsSetup and Measurements LEBT Studies (John Staples and Qing Ji)LEBT Studies (John Staples and Qing Ji) –Physics Design Studies Simulations and LEBT TestingSimulations and LEBT Testing –LEBT Chopper MHz CW RFQ162.5 MHz CW RFQ –Beam Dynamics Design (J. Staples) –RF Design Studies (G. Romanov) –Thermal Analysis and Engineering Design (S. Virostek) OutlookOutlook

H - Ion Source Purchased a D-Pace Ion SourcePurchased a D-Pace Ion Source –Acceptance test at TRIUMF in May 2011 –Measurement of beam current, emittance and beam stability emittance and beam stability –Emittance scan from 1 mA to 10 mA at 20, 28 and 30 kV at 20, 28 and 30 kV LBNL test setup and testLBNL test setup and test –Testing setup at LBNL –Verify acceptance testing results Currents and emittance scansCurrents and emittance scans Measured normalized rmsMeasured normalized rms emittance  0.2  mm.mrad emittance  0.2  mm.mrad D. Li, Project X Collaboration Meeting, Fermilab (October 25-27, 2011)

LEBT R&D Transport the beam from Ion Source and match to RFQTransport the beam from Ion Source and match to RFQ Current LEBT configuration: (two ion sources): 30 keV, 5 mA DC beam and > 90% neutralization and three solenoids (two per arm);  20-degree selecting magnet and LEBT chopper at endCurrent LEBT configuration: (two ion sources): 30 keV, 5 mA DC beam and > 90% neutralization and three solenoids (two per arm);  20-degree selecting magnet and LEBT chopper at end Physics design studyPhysics design study –LEBT and LEBT chopper –Time dependent simulations simulations Experimental studyExperimental study –Hardware engineering (LEBT copper) –Design and build a testing LEBT incrementally incrementally –LEBT testing D. Li, Project X Collaboration Meeting, Fermilab (October 25-27, 2011)

162.5 MHz CW RFQ D. Li, Project X Collaboration Meeting, Fermilab (October 25-27, 2011) Ion type: H- Beam current: 5 mA (nominal); 1 – 10 mA Transverse emittance (norm, rms): < 0.25 mm-mrad Longitudinal emittance (rms): 0.8 – 1.0 keV-nsec Input energy: 30 keV Output energy (kinetic): 2.1 MeV Duty factor: 100% (CW) Frequency: MHz

Summary of the PX RFQ Beam dynamics design complete Beam dynamics design complete – Measured beam distribution – Transport through LEBT – Matched to the RFQ RF structure studies in collaboration with Fermilab RF structure studies in collaboration with Fermilab – Mode stabilization – RFQ termination Summary of preliminary PX RFQ structure design:Summary of preliminary PX RFQ structure design: o RFQ:  4.4 meters long consists of four modules o 32 Pi-mode stabilization rods o 2 RF power couplers o 80 plug-tuners (20 per module) o 48 RF sensing probes o Preliminary termination (cut-back) design D. Li, Project X Collaboration Meeting, Fermilab (October 25-27, 2011)

RFQ Engineering and Fabrication Preliminary RFQ engineering design completePreliminary RFQ engineering design complete –Thermal analysis –Structure design –Fabrication process Fabrication testFabrication test

Outlook (1/2) Ion source and LEBTIon source and LEBT –LBNL will continue the ion source testing, and use the ion source to test the proposed LEBT and verify LEBT physics simulation studies, beam transport, LEBT chopper and matching to the RFQ –Detailed plan and schedule need to be developed based on available resources, support at Fermilab and LBNL –LEBT component design and fabrication: solenoids,  20 degree magnet, LEBT chopper, diagnostics D. Li, Project X Collaboration Meeting, Fermilab (October 25-27, 2011)

Outlook (2/2) PX RFQPX RFQ –RFQ design progressing well and will continue the engineering, thermal analysis and design of cut-backs, and error/tolerance studies at LBNL –Deliver fabrication drawings to Fermilab by FY12 –LBNL will oversee the fabrication, RFQ measurement and tuning –LBNL-Fermilab collaboration started to include engineering, fabrication, future installation and commissioning at Fermilab –Sub-systems/components needed for the RFQ RF power coupler and RF windowsRF power coupler and RF windows RF power system and PSRF power system and PS RFQ support structureRFQ support structure Water cooling systemWater cooling system Vacuum systemVacuum system Instrumentation and controlsInstrumentation and controls D. Li, Project X Collaboration Meeting, Fermilab (October 25-27, 2011)