Purpose of the Project  Construct surface access (industrial) to the Ambler Mining District  Support exploration and development of mineral resources.

Slides:



Advertisements
Similar presentations
County of Fairfax, Virginia Department of Transportation Review and Discussion of Draft Scope of Work for Study of Issues Associated with Increasing Transportation.
Advertisements

Notebook Ref 3.5. Tier 3: No Degradation in ONRWs Applies only to waters classified as Outstanding National Resource Waters (ONRW) This classification.
Rivanna Water & Sewer Authority Community Water Supply Plan Update Public Meeting Monticello High School September 21, :00 pm.
Environmental Scoping Guidance Jerry Vogt Region Environmental Coordinator ODOT – Region 3.
Ecological Survey Reports The level of ESR Report is determined by the type of project and its probable level of impacts.
ROUTE 27 (PARK STREET) CORRIDOR SEWER EVALUATION Mark J. Thompson, P.E. Gus O’Leary Kleinfelder / S E A Consultants Inc.
Technical Information Center
NEPA and Property Acquisition May 19, 2014 Elizabeth Patel Environmental Protection Specialist FTA Office of Planning and Environment.
Careers in Wildlife Management WORKING ON THE WILD SIDE.
Keeping Maine’s Forests Pilot Project Update Fisheries Habitat Restoration Pleasant River Watershed.
Friends of the Fox River November 9, 2014 Longmeadow Parkway Fox River Bridge Corridor.
Environmental Assessment Public Meeting
1 Public Lands Advocacy HOW TO REVIEW A FEDERAL PLANNING DOCUMENT.
National Consortia on Remote Sensing in Transportation – Environmental Assessment ICF Consulting.
Public Location/Design Hearings November 17, 2010 Laughlin, Nevada November 18, 2010 Bullhead City, Arizona.
Utility Extension Project
Longmeadow Parkway Fox River Bridge Corridor
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
 The Mining Law governs access to federal lands for locatable hardrock mineral activities ◦ It is not an environmental statute and doesn’t need to be.
 Life in communities has changed over the years.  One of those changes is in transportation. Transportation is a way of moving people or things from.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Agency Scoping.
Connecticut Department of Transportation Bureau of Policy & Planning.
1 Welcome! West Valley-Taylorsville Transit Corridor Draft Environmental Impact Statement Public Open House/Hearing July 19, 2006.
Future Transportation Projects within the Loxahatchee River Basin Florida Department of Transportation District IV 3400 W. Commercial Blvd W. Commercial.
In-Delta Storage Process OverviewProcess Overview Program BenefitsProgram Benefits Project CostsProject Costs IssuesIssues Proposed Work Plan for FY 2003Proposed.
The Importance of Baseline Data More Than Just Counting Things Presentation to Geology Matters November 14, 2013.
North Slope Rapid Ecoregional Assessment Intermediary results on human footprint and social and economic MQs Update to the AMT and Techteam October 20,
Chapter 10 Land, Public and Private. The Tragedy of the Commons In 1968, ecologist Garrett Hardin described the “tragedy of the commons” Tragedy of the.
Fish and Wildlife Service Mission Conserve, protect and enhance fish, wildlife, and plants and their habitats for the continuing benefit of the American.
Buckhorn Mountain EIS Project August Buckhorn Mountain Exploration Project Echo Bay Exploration is seeking federal and state authorization for.
January 30, 2014 Kurt Parkan, External Affairs Manager Industry Outlook Forum Kenai Peninsula Economic Development District.
Building Strong! 1 US Army Corps of Engineers Regulatory Program Kimberly McLaughlin Program Manager Headquarters Operations and Regulatory Community of.
Arctic Mining Northwest Alaska Northwest Arctic Borough.
Selecting the Right Site for New Nuclear Generation Southern Nuclear Operating Company Tom Moorer – Nuclear Development Environmental Manager.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
Energy Exploration & Development On National Forest System Lands Barry Burkhardt
Highway Location Study CE 453 Lecture 4 See also lab 2 and lab 4 instructions, and EIS lecture notes See also 04 DOT development process.doc Refs:
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
INTRODUCTION TO SECTION 4(f) Presented by Ian Chidister Environmental Program Manager FHWA – Wisconsin Division December 4, 2013.
INYO NATIONAL FOREST - TRAVEL ANALYSIS PROCESS Public Meeting – April 21, 2015.
1 C E T A S Purpose and Need Presentation Date Project Name Project location (city, county) ODOT Key Number:
1 C E T A S Triage Presentation, Date Project Name Project location (city, county) ODOT Key Number:
Peabody Coal Lower Basin Pipeline Engineering Appraisal Study Bureau of Reclamation September 18, 2002.
Transmission Siting Considerations, Best Practices, and Lessons Learned Gary Graham, Ph.D. Transmission Project Director.
Dominguez-Escalante National Conservation Area Dominguez Canyon Wilderness Resource Management Plan Scoping Meetings August 30 and 31, 2010.
1 Implementing the Concepts Environment Pre-Conference Workshop TRB MPOs Present and Future Conference August 27, 2006 Michael Culp FHWA Office of Project.
Locally Administered Federal-Aid Project Initiation Workshop Prospectus Part 3 and NEPA Requirements Presenter: Howard Postovit; ODOT Region 5 Region Environmental.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
USA Parkway Project Welcome Public Information Meeting to the
Salt Lake City – Las Vegas High Speed Rail – Alignment Study Student Engineering Associates.
D.d. delivers district department of transportation d.d. delivers FAISAL HAMEED RONALDO T. NICHOLSON. P.E. Innovative Project Delivery Processes Innovative.
Watershed Stewardship Program Status of Marin County Public Works Watershed Program 11/7/08 11/7/08.
24 August 2007 EDR Effort 1 CF&S Environmental Process for an Americas Regional Effort EDR Planning Jerry Aarons & Rod Walton.
HIGHWAY DESIGN PROCESS & ROUTE LOCATION Spring 2016.
August 19, 2015 Port Bienville Rail EIS Scoping Meeting Presented by: Rhea Vincent Mike McGuire.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 9 January 19, 2016.
Texas Department of Transportation Corpus Christi District U.S. 181 (Harbor Bridge) Environmental Documentation and Schematic Development Citizens’ Advisory.
An Introduction to Health Impact Assessment Paul J. Anderson, MD, MPH HIA Program Manager Section of Epidemiology Division of Public Health Department.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Public.
BROOKS BRIDGE REPLACEMENT STUDY February 18, 2016 Project Briefing for Presenters: April Williams, P.E. (FDOT Project Manager) Steve Schnell, AICP (HDR.
Office of Major Project Development (OMPD) Overview November 2015.
Iron Range Tourism Bureau April 25, 2013 Hwy 53 Update.
US Army Corps of Engineers BUILDING STRONG ® Miles City, Montana Section 205 Gwyn M. Jarrett - Project Manager Omaha District April 27, 2016.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
CE 360Dr SaMeH1 Environmental Eng. 1 (CE 360) Associate Professor of Environmental Eng. Civil Engineering Department Engineering College Majma’ah University.
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
Proven Management – Proven Gold Districts – Safe Jurisdictions Symbol:PG Exchange:TSX Hardrock Project Environmental.
STATE OF ALASKA PERMITTING PROCESS
Hard Rock Mining in Oregon
Space Coast TPO State Road (S.R.) 528 Update
Presentation transcript:

Purpose of the Project  Construct surface access (industrial) to the Ambler Mining District  Support exploration and development of mineral resources in the Ambler Mining District

Where is the Ambler Mining District?

Resource Rich Region  75 mile long State- owned mineralized area,  Copper, zinc, lead, silver and gold  Key deposits:  Arctic (Nova Copper)  Sun (Andover Ventures)  Bornite (NANA)  Smucker (Teck Cominco) Mine feasibility studies show overland transportation is required for mining to be economically feasible

Project Development To Date  DOT&PF initiated transportation reconnaissance efforts in 2010  Community outreach/consultation  Project website, 20+ public meetings, newsletters/ s  Preliminary engineering  Design criteria, corridor identification/analysis, cost estimating  Preliminary baseline environmental research  Preliminary wetland/vegetation mapping, baseline biological studies  Socioeconomic analysis, subsistence study data gap analysis  Other work completed  Aerial and contour mapping, geotechnical investigations  Identified feasible routes

Analysis of Preliminary Corridors  Preliminary corridors were evaluated on:  Corridor length  Federal Conservation System units (e.g. wildlife refuges)  Wild and Scenic Rivers  Salmon/sheefish habitats  Caribou habitats  Threatened/endangered species and critical habitats  Wetland habitats  Availability of material sites  Construction/maintenance cost

Brooks East Corridor  200+/- miles long  Four maintenance stations  15 large bridges (>150 feet)  Least caribou impacts, no endangered species impacts  Least impact on salmon/sheefish habitats  Corridor through Gates of the Arctic National Park & Preserve was reserved in ANILCA  Generalized Land Status  120+/- miles on State land  miles on federal (NPS/BLM) land  40+/- miles on ANCSA Corporation lands

Proposed Corridor and Alternatives

Community Input on Proposed Access  High level of interest in communities throughout the region  Many of the comments have centered on:  Subsistence impacts  Economic issues (employment, cost of living, etc.)  Access (restricted vs. public) and number of vehicles  Environmental issues (wilderness, asbestos, acid rock drainage)

Different than Dalton Highway  Was constructed using a public ROW from BLM and closed by Commissioner of Transportation  Dalton Highway ROW was owned by State and road was managed by DOT&PF – Commissioner had authority to open or close road  Dalton Highway was placed on the Federal Aid Highway System – allowed federal funds to be used for maintenance

Similar to Red Dog Mine Road  Controlled access – for industrial use only  Road is narrower and lower than public highway  User tolls used to fund/repay construction and maintenance  Lessons learned on Red Dog Mine Road: − How to deal with caribou crossing road − Working with local community to identify needed road crossings − Covered/closed containers to limit potential for dust − Commercial driver training/enforcement

Red Dog Mine Road

Proposed Project Schedule  Community Outreach/Consultation   Routing/Reconnaissance Studies   Baseline Environmental   Preliminary Engineering   Submit permit app. to initiate EIS  Public Private Partnership Development  2014  2016  Permitting/Final Design   Construction Start  2019

Proposed Tasks FY2015  Environmental documentation/permitting  EIS coordination  Continued Agency consultations  Community outreach/meetings  Additional baseline studies  Additional hydrology studies (UAF, contractor)  Additional biological studies (ADF&G, contractors)  Cultural resources and subsistence studies (ADF&G, contractors)  Additional geotechnical studies (DOT&PF, contractor)  Additional economic/financial studies  Preliminary engineering  Support for NEPA review (alignment refinement, alternative alignments)

FY15 Activities Funding AGENCYFY15SCOPE OF WORK Project Mgmt/Legal$1,250,000AIDEA personnel charges, outside legal counsel for NEPA process. Public Outreach$700,000PI services including local community liaison services. Third-Party EIS$1,000,000Third-party contractor to work on EIS under lead federal agency direction. Hydrology Studies$600,000 Meteorological data collection, stream gauging on the 4-5 major rivers, snow surveys (snow depth and snow water equivalent), suspended/bedload sediment studies. Fisheries Studies$1,200,000Fisheries and habitat studies by ADF&G over 2-3 years. Geotechnical Studies$1,000,000 DOT&PF geotechnical drilling and studies to identify material site, quantify material site quantities, and provide geotechnical recommendations. Health Impact Assessment$500,000 DNR OPMP project coordination manager and HIA development. HIA funding assumed to be split btw FY15 and FY16. Other Enviro/Engineering$1,250,000 Cultural resources, other environmental, engineering support for EIS and permitting. Federal Cost Reimbursement$1,000,000 NPS/FHWA cost recovery as allowed under federal law for processing ROW permit application on federal lands. TOTAL$8,500,000

Project Cost to Completion Estimates PhaseFY15FY16FY17FY18FY19Total Pre-Design/Enviro$8.5 $7.0$6.5 $ % Design/Permitting $5 $10 Right-of-Way $3.5 Design/Construction (Design/Build) $ Total$8.5 $7.0$11.5$ $

Introduction to Public Private Partnerships (P3)  P3 is a project delivery method  Combines design, build, finance, operate & maintain functions  Allocates different risks to the public & private sectors  US leads the world in power P3 but lags in other sectors  Transportation P3 now gaining momentum in US

Rationale for P3  Transfer design, construction, O&M risk to private sector  Provide incentives for cost control & proper maintenance  Attract subordinate equity financing

Spectrum of P3 Options

Questions/Discussion