Bopp/Shafiu/Cobelo/Chilvers et al. UK ALPHA 4 – Block 3 Barcelona May Commercial and Technical Integration of Distributed Generation into Distribution Networks Thomas BOPP, Ahmed SHAFIU, Iñigo COBELO, Ian CHILVERS, Nick JENKINS, Goran STRBAC, Haiyu LI, Peter CROSSLEY Contact:
Bopp/Shafiu/Cobelo/Chilvers et al. UK ALPHA 4 – Block 3 Barcelona May Distribution Management System Controller State Estimation Control Scheduling Local Measurements Remote Terminal Unit Remote Terminal Unit Remote Terminal Unit Network Data, Pseudo Measurements Constraints, Contracts DG, AVC, STATCOMs Loads, Switched Capacitors, CBs Information
Bopp/Shafiu/Cobelo/Chilvers et al. UK ALPHA 4 – Block 3 Barcelona May State Estimation for DMSC Applications Challenges High R/X ratio Limited number of measurements Large or meshed networks Solutions Identification of best locations for measurements Use of historic data/load profiles
Bopp/Shafiu/Cobelo/Chilvers et al. UK ALPHA 4 – Block 3 Barcelona May Uncertainty of Voltage Estimates Uncertainty % Bus number
Bopp/Shafiu/Cobelo/Chilvers et al. UK ALPHA 4 – Block 3 Barcelona May Commercial Integration of DG Challenge Maximisation of the economic benefit of DG and active management Solution Combination of optimal power flow simulation and cost benefit analysis Comparison net present values of different DG and active management scenarios
Bopp/Shafiu/Cobelo/Chilvers et al. UK ALPHA 4 – Block 3 Barcelona May Case Study
Bopp/Shafiu/Cobelo/Chilvers et al. UK ALPHA 4 – Block 3 Barcelona May Protection Problems Relay selectivity DG transient stability Autoreclose scheme issues Solution 11kV numerical distance protection –Utilise existing equipment –No communication or additional VT