Contract Schedules 1313 Safety Conditions 1315 Certification Requirements 1354 Prime Agreement.

Slides:



Advertisements
Similar presentations
EQT Production Company - exploration and production company in the Appalachian basin.
Advertisements

The Role of the IRB An Institutional Review Board (IRB) is a review committee established to help protect the rights and welfare of human research subjects.
National Committee on Trade Facilitation. Origin of the proposal National Group that follows up on the WTO negotiation WTO Committee (W/157) Report of.
ATS QUALITY ASSURANCE PROGRAMMES. 2 NAV CANADA: THE COMPANY NAV CANADA, a non-share capital, private sector corporation incorporated May 1995 Financially.
Benefits of Construction Management
Monitoring and tender procedures for infrastructure projects Baltic Retreat 2013 Federal Department of Foreign Affairs FDFA Swiss Agency for Development.
Final Project 7th semester Maria Amparo Prieto Project: Svanekøkkenet Århus Office Building.
Fawzy Al-Alami G Term Paper.  Introduction.  Effect of Teamwork in Design-Build. Construction Contract.  Factors Can Enhance Design-Build.
2 3 There are two basic areas where there is a need to have resources available. Internal:  Financial  Personnel  Assets  Time External  Consultants.
CMGC Contracting at UDOT Program, Projects & Lessons Learned
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Damage Prevention PHMSA Update Annmarie Robertson PHMSA/Office.
1 Queensland University of Technology A Tender Management System for Capital Works.
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
Construction Cost Estimating Class #2: Bidding Process Prof. Ralph V. Locurcio, PE.
RETENTION SCHEDULES Alberta Education. Retention Scheduling at Alberta Education Future Practice Government of Alberta Alberta Education Flexible Scheduling.
MANAGING CONTRACTORS PERSPECTIVES FROM THE MHSA. copyright reserved 2003, department, company INTRODUCTION More work is being outsourced to contractors.
‘The H in Workplace Health and Safety – a workplace experience’ Lisa Burnell – Director / WHS Working Group.
CAST IRON INVENTORY DARIN BURK PIPELINE SAFETY PROGRAM MANAGER, IL COMMERCE COMMISSION PAST CHAIRMAN, NATIONAL ASSOCIATION OF PIPELINE SAFETY REPRESENTATIVES.
Snow and Ice Maintenance Tenders and Contract Interpretation Robert Kennaley McLauchlin & Associates.
CRICOS Provider Number 00103D OHS Management of Contractors in Capital Works and Maintenance Physical Resources / Risk, Health and Safety.
DPW General Conditions Articles 32 through 37. Articles Covered Today  32 Owner’s Right to Withhold Payment  33 Owner’s Right to Stop Work and Terminate.
Contractor Safety Management
CTC-470 Construction Administration Project Management Concepts.
Health and Safety Executive Health and Safety Executive Welcome to CDM 2015 Stakeholder Briefing HM Inspector of Health and Safety.
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
Supplier Ethics: Program Checklist
Health and Safety in Agriculture in Ireland - Challenges and successes experienced and foreseen John McNamara Teagasc Advisory, Training, and Research.
Top Tactics for Maximizing GMP Compliance in Blue Mountain RAM Jake Jacanin, Regional Sales Manager September 18, 2013.
Surety Bonds The Sensible Choice For Managing Risk.
Surety Bonds The Sensible Choice For Managing Risk.
ILS CONFERENCE – MARITIME LABOUR CONVENTION Shipowner Obligations under the MLC 1.
Honoraria for Design Build Projects Methodology Assessment Matrix.
By Anthony W. Hill & Course Technology 1 User Support Management Beisse.
Regulatory Affairs Personnel Training and Qualification (RA T&Q) Overview.
NEW CONSTRUCTION REGULATIONS 7 February 2014 Master Builders KwaZulu-Natal | masterbuilders.co.za.
The Netherlands Charter Group for Public Accountability Multiple modes of accountability By Roeland in ‘t Veld Chairman Audit Committee.
Development and Construction of On- Shore Windfarms Andrew Aveyard Green Cat Renewables Jim Wilkinson CA Blackwells.
Copyright 2013 Risk Management Stephen Vono, Principal NAPLIA.
A Strategy for an Effective Accident Prevention Program
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
ISO / IEC : 2012 Conformity assessment – Requirements for the operation of various types of bodies performing inspection.
STATE COMMITTEE for STANDARDIZATION of the REPUBLIC of BELARUS.
CON 2001-CVE 4070 Construction Engineering Project Organization & Stakeholders Prof. Ralph V. Locurcio, PE.
Safety Stand Down – Together We Will Make the Difference.
UNDP Bangladesh Procurement Fair Objectives of the Fair; - UNDP Procurement principles; - Procurement plan ; - UNDP Procurement Roadmap;
The 4 th Railway Package: Impact for the keepers Clio Liégeois.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Approvals and Permits Division Isreal Mallard Transportation Specialist,
Agency Construction Management :CM NOT AT-RISK
Board of Trustees Study Session March 8, 2005 CONTRACTOR PREQUALIFICATION INFORMATION BRIEFING.
1 © The Delos Partnership 2004 Project Management Executing the Project.
LACCD Building the Future THOMAS HALL Director Facilities Planning and Development.
Health and Safety Executive Health and Safety Executive Welcome to CDM 2015 The role of the client Paul Harvey HM Principal Inspector of Health and Safety.
MARCH 1 Risk Management Introduction l Generic approach è Type of project è The length of the project è Experience of the risk manager è The attitude of.
BSBPMG408A Apply Contract and Procurement Procedures Apply Contract and Procurement Procedures Unit Guide C ertificate IV in Project Management Qualification.
OSHA Safety and Health Program Management Guidelines
1 Don’t Let Construction Administration Services Become a Claims Maker Architects and Engineers Professional Liability Workshop.
The International Society for Quality in Health Care (ISQua) – Guidelines.
MANAGING HSE IN CONTRACTS 2016
Things to look for in owner contracts
Topics For PRT Proposals
Improving Community Safety through procurement practice and process Tim Oakley Head of Consultancy Trusted procurement for better buildings and homes.
UNIT V QUALITY SYSTEMS.
SAFETY OBSERVATIONS Record observations of safe or at-risk behaviors or conditions using customized data-entry forms and track feedback Standardize risk.
CR GR HSE 501 – HSE Requirements for Contractors
Principal Contractor Licensing Scheme Standard
Roadmap to COR.
Primavera Contract Management r14
Honoraria for Design Build Projects Methodology Assessment Matrix
CR GR HSE 501 – HSE Requirements for Contractors
Presentation transcript:

Contract Schedules 1313 Safety Conditions 1315 Certification Requirements 1354 Prime Agreement

Schedule 1313 General Safety Conditions Article 1General Provisions Notice of Project Reporting to BCTS Consider BCTS concerns Minimum requirement if exempt

Schedule 1313 General Safety Conditions Article 2 Prime Contract Provisions Principal = Prime Remuneration Endorsed New entrants Cooperate with Prime Report concerns to BCTS

Schedule 1315 Certification Requirements Sub Contractors Qualification Exemptions from Qualification Certification vs Renewal Certification Loss

Schedule 1354 P.C. Agreement (PCA ) Qualification Evaluation Knowledge and control PC Obligations No Assignment Notification of others

Road Use Controls Assessments 23-1 Safe Road Use Plan 23-2

Access Assessment 23-1 All Projects Guide Risk Based Intensity

Access Assessment 23-1 Methods and Info Sources Correspondence/ Phone Calls Data Bases Google Earth Field Inspections Past Assessments User Intel Other assessments

Access Assessment 23-1 Results and Info Disposition Informs Project Planning Informs Budgeting Process Informs Tender Packages Informs Clients

Safe Road Use Plan 23-2 MFR Commitment Road Safety Committees VS SRUP BCTS/MFR = Facilitator Multi Owners

Safe Road Use Plan 23-2 Sources of Info Methods Suggestions Communication!!!