Study of Line-used Magnetically Controlled Reactor(MCR) Zhanfeng Deng China Electrical Power Research Institute.

Slides:



Advertisements
Similar presentations
“Power Factor” In Transmission System
Advertisements

Shunt Capacitor Switching For Power Factor Improvement Clayton H Reid.
Modeling of Reconnection of Decentralized Power Energy Sources Using EMTP ATP Ing. Dušan MEDVEĎ, PhD. Železná Ruda-Špičák, 25. May 2010 TECHNICAL UNIVERSITY.
Understanding Electrical TransmissionDemonstration C2 A Guide to the National Grid Transmission Model Demonstration C2 Why are high voltages used for transmission?
Resource Data Needed For Dynamic Simulations
EXPERIMENTAL STUDY AND COMPARATIVE ANALYSIS OF TRANSFORMER HARMONIC BEHAVIOUR UNDER LINEAR AND NONLINEAR LOAD CONDITIONS.
System Voltage Planning Brian Moss PD / Transmission Planning Transmission Planning Overview October 30, 2007.
Dry type transformers Zaragoza Traction application
Application of Power Electronics
Per Unit Representation Load Flow Analysis Power System Stability Power Factor Improvement Ashfaq Hussain.
Power Engineering Society Chicago Chapter Reactive Power: Sources and Solutions 12 February 2003 David E. Mertz, PE Burns & McDonnell Engineers, Inc.
© ABB Group August 7, 2015 | Slide 1 Variable Shunt Reactors Optimize Transmission Systems Dr. Claes Bengtsson, Global Product Manager, Reactors. PowerGen.
Disconnect Switches There are many purposes for disconnect switches in substations and power lines. They are used to isolate or deenergize equipment for.
AUTOMATIC CONTROL SYSTEM FOR VOLTAGE AND REACTIVE POWER REGULATION IN ACTIVE-ADAPTIVE GRID OF POWER CLUSTER “ELGAUGOL” Alexander Voloshin Ph.D., LYSIS.
System Operator Conference Simulator Drill Orientation 2014 System Operator Conferences Charlotte NC & Franklin TN SERC/SOS Facilitator Team.
Substations. Substations Chapter 4 Substations Major types of equipment found in most transmission and distribution substations with their purpose,
F. Ferrandis_SP_ALPHA 2_BLOCK 2_Paper 35_Presentation Barcelona May POWER FACTOR CORRECTION WITHIN INDUSTRIAL SITES EXPERIENCES REGARDING.
POWER FACTOR CORRECTION
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Voltage and frequency control of the grid Minute Lectures A complex system In Europe, all electrical grids are interconnected This large international.
ON DIMENSIONING LVDC NETWORK CAPACITANCIES AND IMPACT ON POWER LOSSES
PQSynergy TM 2011 Harmonic Assessment of PEA North1, Chiangmai’s Customers in North Industrial Estate Chotepong Pongsriwat. M.Eng(EE) Chief of Power.
Svc. Transformer A step-down transformer is usually placed between the AC system bus-bar and the low voltage bus-bar to which the thyristor valves are.
2. Terms and definitions1 # Terms and Definitions # Voltage Sags and Interruptions.
Book Reference : Pages To understand how electricity is distributed in the UK via the National Grid 2.To understand how transformers are used.
Tubas ELECTRICAL NETWORK STUDY Prepared by : Omar Abu-Omar Ahmad Nerat Sameed banifadel PRESENTATION TO: Dr.MAHER KHAMASH.
Long Term Study Task Force Update Transmission Study Practices and Methodologies April 5th,2011 LTS.
Module- optimizer ECOD. Feigin Electric solution-Module Optimizer “ECOD” New product which allows you to optimize the voltage within the norms laid down.
By J DAVID MANOHAR (08A31A0232). NECESSITY OF SUPERCONDUSTOR  Damage from short circuit is constant threat in power systems  All the power systems components.
Voltimum Expert Topic – Power Harmonics. What are Harmonics? They are waveforms with frequencies that are multiples of the fundamental frequency (Typically.
Clemson University Electric Power Research Association CHANDANA BOMMAREDDY CLEMSON UNIVERSITY DG VOLTAGE CONTROL IN AN ISLANDING MODE OF OPERATION.
Power Quality Karsten KAHLE Electric Power Converter Group (TE-EPC) High Power Converter Section Review of CERN’s Electrical Power Network October.
UNIT-VII Static Series Compensators
REACTIVE POWER COMPENSATION
Transmission Voltage Management Ross Owen Oncor Electric Delivery.
A Training Presentation On 132 KV GSS JAIPUR Submitted in partial fulfillment For the award of the degree of BACHELOR OF TECHNOLOGY Submitted To:- Submitted.
SARDAR VALLABHBHAI PATEL INSTITUTE OF TECHNOLOGY PREPARED BY: 1)BALDIWALA ALIABBAS ( ) 2)PARTH GUPTA ( ) 3)ANIL KHATIK ( )
Reactance and Resonance. Some Review of Important Concepts AC waves have constantly changing voltage and currents. We need to use RMS voltage and RMS.
Power Quality Issues Power Electronics Group.
Utilize Distributed Power Flow Controller (DPFC) to Compensate Unbalanced 3-phase Currents in Transmissions Systems By UNDER THE GUIDENCE OF.
 The common type of wind power generators are squirrel cage induction generator (SCIG),doubly fed induction generator (DFIG)  For more secure and.
POWER FACTOR CORRECTION
Power Factor Correction The Definitive power solution
Harmonic Issues of AEP Welsh HVDC System Bob Malek Kiril Andov Richard Gutman Ben Mehraban 10/12/2015.
Power Factor Correction The Definitive power solution
Effects of Harmonics on Capacitors Electrical System
A Project Review On POWER QUALITY IMPROVEMENT IN GRID USING STATECOM
HVDC LIGHT:- NEW TECHNOLOGY FOR A BETTER ENVIRONMENT
APFC-03 Reactive Power Compensation Method & Settings
POWER FACTOR CORRECTION
The Clutch Control Strategy of EMCVT in AC Power Generation System
SIMULATION AND IMPLEMENTATION OF FC-TCR
MEDIUM VOLTAGE APPLICATIONS.
IG BASED WINDFARMS USING STATCOM
PSCAD models.
Management Of Tulkarm Electrical Network
Analysis of the Amplitude and Frequencies of the Voltage Magnification Transients in Distribution Networks due to Capacitor Switching Mohamed Saied Electrical.
Combined operation of different power plants PREPARED BY : Priyanka Grover Btech (EE) SBSSTC,FZR.
Wind turbine technology
Transmission Solutions
A DC/DC Modular-Multilevel Converter for DC Grid
Transient Analysis of Shunt Reactor Switching on 500kV System
Introduction To Reactive Power
POWER SYSTEM ANALYSIS INTRODUCTION.
DEC System Voltage Planning - June 2018
Distributed Generation (DG) Modeling Criteria
Protective Relaying Conference
User Experience with New Solar PV Models California ISO
Biosco: MV/LV prefabricated substations IEC Presentation of the standard Safety is a choice.
National Institute of Wind Energy(NIWE)
Presentation transcript:

Study of Line-used Magnetically Controlled Reactor(MCR) Zhanfeng Deng China Electrical Power Research Institute

Main Topic Why controllable reactor is needed Why controllable reactor is needed Types of controllable reactor Types of controllable reactor Principle of MCR Principle of MCR Functions of MCR Functions of MCR MCR vs. TCR MCR vs. TCR Prospect of application in China Prospect of application in China Simulation Simulation Experimental result of low voltage model Experimental result of low voltage model Demonstration project in Jingzhou Demonstration project in Jingzhou

Why controllable reactor is needed Surplus reactive power of transmission lines causes over-voltage in the line at small load; Surplus reactive power of transmission lines causes over-voltage in the line at small load; Conventional reactor reduced the carrying capacity of lines greatly; Conventional reactor reduced the carrying capacity of lines greatly; Low compensation degree is used, which reduces the efficiency of the over-voltage limiting capacity of reactor; Low compensation degree is used, which reduces the efficiency of the over-voltage limiting capacity of reactor; To solve the conflict between over-voltage limiting and carrying capacity reduce, some kind of reactor with changeable parameters must be made. To solve the conflict between over-voltage limiting and carrying capacity reduce, some kind of reactor with changeable parameters must be made.

Type of controllable reactor Transformer type of controllable reactor Transformer type of controllable reactor

Magnetically controlled reactor Bypass Circuir Breaker Rectifier

Principle of MCR

Functions of MCR Increase carrying capacity of transmission lines Increase carrying capacity of transmission lines Limit power frequency over-voltage Limit power frequency over-voltage Limit switching over-voltage Limit switching over-voltage Stabilize network voltage Stabilize network voltage Inhibit second-arc currency Inhibit second-arc currency Reduce network loss Reduce network loss Reduce maintenance cost of switches of capacitors Reduce maintenance cost of switches of capacitors

MCR vs. TCR MCRTCR Lifetime >20 years About 10 years Over-Load Capacity 50% overload for 20min 100% overload for 20sec 50% overload for 20sec 100%overload for 2sec Over-voltage Capacity 2.3 times rated voltage 1.8 times rated voltage THD3%5.8% Space10 sq. ft / Mvar100 sq.ft / Mvar. Capacity limit No theoretical limit Limit by the capacity of main transformer

MCR vs. TCR MCRTCR Loss 0.05% at no load mode 0.5% at rated load mode 0.1% at no load mode 1% at rated load mode Cost of Equipment $20/kvar for 0.02s response time $10/kvar for 1s response time $20/kvar, response time is 0.02s Cost of installation, operation and maintenance Special personnel Not need Need special personnel to install, operate and maintain

Prospect of application in China 220kV Grid 220kV Grid In xinjiang and neimong province, load in the day and at the night changes greatly in some long-distance transmission line. In xinjiang and neimong province, load in the day and at the night changes greatly in some long-distance transmission line. 330kV Grid 330kV Grid In xibei grid, hydro-power accounts for great ratio and power flow changes greatly and frequently. when water is abundant and less power plants run, the capacity of voltage adjustment is weak. In xibei grid, hydro-power accounts for great ratio and power flow changes greatly and frequently. when water is abundant and less power plants run, the capacity of voltage adjustment is weak.

Prospect of application in China 500kV Grid 500kV Grid In the long-distance transmission lines with heavy load, compact transmission line, and the interconnect line, controllable reactor is needed to stabilize the network voltage, increase the carrying capacity and limit over-voltage. In the long-distance transmission lines with heavy load, compact transmission line, and the interconnect line, controllable reactor is needed to stabilize the network voltage, increase the carrying capacity and limit over-voltage.

Prospect of application in China 1000kV Grid ( Excessively high voltage ) 1000kV Grid ( Excessively high voltage ) Its capacitive power is 4-5 times larger than 500kV lines, controllable reactor is more necessary than other voltage-level lines to limit over- voltage, compensate reactive power to stabilize voltage and protect the line against over-voltage. Its capacitive power is 4-5 times larger than 500kV lines, controllable reactor is more necessary than other voltage-level lines to limit over- voltage, compensate reactive power to stabilize voltage and protect the line against over-voltage.

Simulation Model

V-I Characteristic of MCR AC voltage (p.u.) AC current(p.u.) Ic=25% Ic=50% Ic=100% MCR v-I curve looks very like a constant current source when the control current is constant.

Control Characteristic of MCR Output AC Current (p.u.) Control current(p.u.)

Harmonic Characteristic of MCR The characteristic harmonic is 5 th,7 th, 11 th ; the calculation value of harmonic currents is slightly higher than experiment. I_harm/INorm(100%) THD (100%) IAC (p.u.) 5 th 7 th 3 rd 9 th

Simulation Result at 10% Branch 2current (kA) Phasecurrent (kA) Branch 2current (kA) time(10ms/div)

Simulation Result at 25% Branch 2current (kA) Phasecurrent (kA) Branch 2current (kA) time(10ms/div)

Simulation Result at 50% Branch 2current (kA) Phasecurrent (kA) Branch 2current (kA) time(10ms/div)

Simulation Result at 100% Branch 2current (kA) Phasecurrent (kA) Branch 2current (kA) time(10ms/div)

Dynamic Characteristic of MCR Controlcurrent (kA) Phase Acurrent (rmskA) Phase Acurrent (kA) time(10ms/div) Step from 0 to 100%

Dynamic Charateristic of MCR Controlcurrent (kA) Phase Acurrent(,rmskA) Phase Acurrent (kA) time(10ms/div) Step from 100 to 10%

Recovery Voltage and Second-arc Current Peak-peak second-arc current:2.3A Peak-peak recovery voltage: 69kV Second-arc current (kA) time(0.2s/div) Recovery voltage (kA) time(0.2s/div)

Experiment Result MCR Model

Experiment Result at 50% IA IA1 IA2 Branch 2 current(0.25A/m) Phase current(0.25A/m) Branch 2 current(0.25A/m) time(10ms/div)

Experiment Result at 100% IA IA1 IA2 Branch 2 current(0.25A/m) Phase current(0.25A/m) Branch 2 current(0.25A/m) time(10ms/div)

Demonstration project Simulation results show that network voltage of Jingzhou station can increase by 2.3kV and network loss can decrease by 7.2MW as the conventional reactor is replaced by MCR, the over-voltage limit capacity of them are equal.

Demonstration project 120Mvar/500k V MCR

Parameters of 120Mvar/500kV MCR Rated voltage:550kV Rated voltage:550kV Rated Current:126A Rated Current:126A Norm capacity range: 0.05~1.0Qn Norm capacity range: 0.05~1.0Qn Maximum capacity: 1.6Qn Maximum capacity: 1.6Qn No-load Loss: <0.1% No-load Loss: <0.1% Rated Load Loss:<0.6% Rated Load Loss:<0.6% Noise :<75db Noise :<75db It will be put into operation in March,2007.

Control system

Control System

Thank You!