Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e 9-1 © 2004 by Prentice Hall, Inc.,

Slides:



Advertisements
Similar presentations
Transparency Masters to accompany Operations Management, 5E (Heizer & Render) 1-6 © 1998 by Prentice Hall, Inc. A Simon & Schuster Company Upper Saddle.
Advertisements

PowerPoint presentation to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
To accompany Quantitative Analysis for Management, 8e by Render/Stair/Hanna 6-1 © 2003 by Prentice Hall, Inc. Upper Saddle River, NJ Chapter 6 Inventory.
Operations Management
9 Layout Strategies PowerPoint presentation to accompany
Operations Management Layout Strategy Chapter 9
Location Strategy and Layout Strategy
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.
Layout Strategy. Objectives of the Layout Strategy Develop an economical layout which will meet the requirements of: product design and volume (product.
Operations Management
Process A collection of tasks, connected by flows of goods and information, that transforms various inputs into more valuable outputs Transparency Masters.
Transparency Masters to accompany Operations Management, 5E (Heizer & Render) 4-20 © 1998 by Prentice Hall, Inc. A Simon & Schuster Company Upper Saddle.
PRODUCTION AND OPERATIONS MANAGEMENT
© 2006 Prentice Hall, Inc.9 – 1 Layout Strategy Chapter9.
Facility Layout Ross L. Fink. Facility Layout Types Classic Classic –Process (functional, departmental) –Product (assembly line) –Fixed Position Cellular.
Layout Strategy. Introduction What – Layout Decisions Where – For efficiency or customer appeal Why – Improve Profitability.
Operations Management
Session Pooja patnaik.
Process Selection and Facility Layout
PowerPoint presentation to accompany Operations Management, 6E (Heizer & Render) © 2001 by Prentice Hall, Inc., Upper Saddle River, N.J Operations.
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Operations Management
Operations Management
© 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Operations Management Material Requirements Planning (MRP) & ERP Chapter 14.
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
PowerPoint presentation to accompany Operations Management, 6E (Heizer & Render) © 2001 by Prentice Hall, Inc., Upper Saddle River, N.J Operations.
Process Selection Chapter 3, Part 2. Intermittent Operations Intermittent operations: processes used to produce a variety of products with different processing.
22/04/2017 Process selection.
© 2006 Prentice Hall, Inc.7 – 1 Operations Management Chapter 5 – Process Strategy © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany Heizer/Render.
PowerPoint presentation to accompany Operations Management, 6E (Heizer & Render) © 2001 by Prentice Hall, Inc. Upper Saddle River, N.J Material.
Chapter 9 : Layout Strategies
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e 9-1 © 2004 by Prentice Hall, Inc.,
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.
PowerPoint presentation to accompany Heizer/Render - Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.
Assembly Lines – Reliable Serial Systems
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
Process Technology Chapter 3, Part 3. Computer-Aided Design & Engineering Computer-aided design (CAD): use of computer software to design products Similar.
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
© 2006 Prentice Hall, Inc.9 – 1 Operations Management Chapter 9 – Layout Strategy © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany Heizer/Render.
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e 9-1 © 2004 by Prentice Hall, Inc.,
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e 9-1 © 2004 by Prentice Hall, Inc.,
PowerPoint presentation to accompany Heizer/Render - Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
Chap 4 - Facility Layout: Manufacturing and Services.
Process Selection Chapter 3, Part 2. Intermittent Operations Intermittent operations: processes used to produce a variety of products with different processing.
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e 9-1 © 2004 by Prentice Hall, Inc.,
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
PowerPoint presentation to accompany Heizer/Render - Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
PowerPoint presentation to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 6 Process Selection and Facilities Layout.
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
Part 3.
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
© 2007 Pearson Education DD DD GG GG GG MM MM MM AA AA L LL LL LL L Process Layout Chapter 8.
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
Operations Management
Chapter 3 MANAGING THE TRANSFORMATION PROCESS
Organization of Workstations
SECTION 2 STRATEGIC DESIGN
Operations Management Aggregate Scheduling Chapter 13
9 Layout Strategies PowerPoint presentation to accompany
Management Science 2 Material Requirements Planning (MRP)
7 Layout Strategies PowerPoint presentation to accompany
For these two jobs rate each of Hackman and Oldham ´s core job characteristics on a scale from 1 to 10. What is your total score? What about the job could.
For these two jobs rate each of Hackman and Oldham ´s core job characteristics on a scale from 1 to 10. What is your total score? What about the job could.
9 Layout Strategies PowerPoint presentation to accompany
Presentation transcript:

Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e 9-1 © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J Product-Oriented Layout  Facility organized around product  Design minimizes line imbalance  Delay between work stations  Types: Fabrication line; assembly line

Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e 9-2 © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J Product-Oriented Requirements  Standardized product  High production volume  Stable production quantities  Uniform quality of raw materials & components

Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e 9-3 © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J Product-Oriented Layout - Assumptions  Volume is adequate for high equipment utilization  Product demand is stable enough to justify high investment in specialized equipment  Product is standardized or approaching a phase of its life cycle that justifies investment in specialized equipment  Supplies of raw materials and components are adequate and of uniform quality to ensure they will work with specialized equipment

Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e 9-4 © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J Product-Oriented Layout Types  Assembles fabricated parts  Uses workstation  Repetitive process  Paced by tasks  Balanced by moving tasks  Builds components  Uses series of machines  Repetitive process  Machine paced  Balanced by physical redesign Fabrication LineAssembly Line

Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e 9-5 © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J Product-Oriented Layout Advantages  Lower variable cost per unit  Lower material handling costs  Lower work-in-process inventories  Easier training & supervision  Rapid throughput

Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e 9-6 © 2004 by Prentice Hall, Inc., Upper Saddle River, N.J Product-Oriented Layout Disadvantages  Higher capital investment  Special equipment  Any work stoppage stops whole process  Lack of flexibility  Volume  Product