Muon Collider 6 D Cooling Model Magnets M. Tartaglia Technical Division, Magnet Systems Dept. Fermilab MAP Aug. 26, 2011M. Tartaglia1.

Slides:



Advertisements
Similar presentations
Q1 for JLAB’s 12 Gev/c Super High Momentum Spectrometer S.R. Lassiter, P.B. Brindza, M. J. Fowler, S.R. Milward, P. Penfold, R. Locke Q1 SHMS HMS Q2 Q3.
Advertisements

Zian Zhu Superconducting Solenoid Magnet BESIII Workshop Zian Zhu Beijing, Oct.13,2001.
Undulator R & D Jim Clarke STFC Daresbury Laboratory, UK BAW-2 SLAC Jan 2011.
MUTAC Review, 9 April MuCOOL and MICE Coupling Magnet Status Michael A. Green Lawrence Berkeley Laboratory Berkeley CA
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
Twin Solenoid Twin Solenoid - conceptual design for FCC-hh detector magnet - Matthias GT Mentink Alexey Dudarev Helder Pais Da Silva Leonardo Erik Gerritse.
Aug 29, 2006S. Kahn T HTS Solenoid1 A Proposal for a 50 T HTS Solenoid Steve Kahn Muons Inc. August 29, 2006.
Development of Superconducting Magnets for Particle Accelerators and Detectors in High Energy Physics Takakazu Shintomi and Akira Yamamoto On behalf of.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
Superconducting Large Bore Sextupole for ILC
Muons, Inc. AAC Feb. 4, 2009 V. Kashikhin 1 Fermilab AAC  V. Kashikhin for Superconducting Magnet Team Superconducting Helical Solenoids.
MCTF Alexander Zlobin MUTAC Meeting 8-10 April MCTF Magnet and HTS Conductor R&D.
1 A Joint Proposal for US-Japan Cooperation Program Proposal to JSPS US-Japan collaboration fund R&D of superconducting magnet technology for high intensity.
Status of CEPC Detector magnet
Magnets for muon collider ring and interaction regions V.V. Kashikhin, FNAL December 03, 2009.
LQ Goals and Design Study Summary – G. Ambrosio 1 LARP Collab Mtg – SLAC, Oct , 2007 BNL - FNAL - LBNL - SLAC LQ Goals & Design Summary Giorgio Ambrosio.
LQS01 Test Preparation and Test Plan LARP Collaboration Meeting 12 LBNL - April 8-10, 2009.
Sep 26, 2006S. Kahn T HTS Solenoid1 A Proposal for a 50 T HTS Solenoid Steve Kahn Muons Inc. September 26, 2006.
Superconducting R&D – Now Strand and Cable R&D FERMILAB Magnet Systems Department – Now SC Materials Department (TD) HTS Insert Coil Test in External Solenoid.
HTS R&D for High Field Magnets
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
Review of Quench Limits FermilabAccelerator Physics Center Nikolai Mokhov Fermilab 1 st HiLumi LHC / LARP Collaboration Meeting CERN November 16-18, 2011.
Fermilab 02/01/07NFMCC on MCTF Magnets1 Magnet R&D… through the MCTF Michael Lamm.
Subscale quadrupole (SQ) series Paolo Ferracin LARP DoE Review FNAL June 12-14, 2006.
Harold G. Kirk Brookhaven National Laboratory High-Field Solenoids for a MC Final Cooling System AAC 2012 Austin, Texas June 11-15, 2012.
Test Program and Results Guram Chlachidze for FNAL-CERN Collaboration September 26-27, 2012 Outline Test program Quench Performance Quench Protection Magnetic.
Dipole design at the 16 T frontier - Magnet R&D for a Future Circular Collider (FCC) at Fermilab Alexander Zlobin Fermilab.
HTS High-Field Solenoid Development March xx, 2013 Presenter’s Name | DOE Mini-Review of MAP (FNAL, March 4-6, 2013)1 Advanced Quench Protection System.
BNL High Field and HTS Magnet Program Ramesh Gupta BNL, NY USA H T.
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
Muon Cooling Channel Superconducting Magnet Systems Muon Collider Task Force Meeting on July 31, 2006 V.S. Kashikhin.
Magnet R&D for Muon Beam Cooling at FNAL Alexander Zlobin Fermilab Muon Collider Design Workshop, BNL December 1-3, 2009.
HQM01 Test Summary Outline -Magnet Instrumentation and Shim System -SG Data -Short Sample Limits -Quench Training at 4.6 K and 2.2 K -Ramp rate and Temperature.
Fermilab AAC MCTF 08/08/07MCTF Hardware Plans1 MCTF Hardware Development Plans Michael Lamm Focus on Support for Muon Collider Magnets at Fermilab.
Helical Solenoid Development
Highlights of Prototype SC Magnet Tests (LCLSII- 4.5-EN-0612) and Proposed Production Magnet Test Plan (LCLSII-4.5-EN-611-R0) and XFEL Magnet Test Results.
Magnet R&D for Large Volume Magnetization A.V. Zlobin Fermilab Fifth IDS-NF Plenary Meeting 8-10 April 2010 at Fermilab.
XVII SuperB Workshop and Kick Off Meeting - La Biodola (Isola d'Elba) Italy May 28 th June 2 nd 2011 P.Fabbricatore Sezione di Genova The air core magnets.
IR Magnets for Muon Collider Alexander Zlobin and Vadim Kashikhin Muon Collider Physics Workshop, Fermilab November 12, 2009.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
Fermilab’s TRAC Summer Experience Joshua Louis Naperville District 203.
MQXFS1 Test Results G. Chlachidze, J. DiMarco, S. Izquierdo-Bermudez, E. Ravaioli, S. Stoynev, T. Strauss et al. Joint LARP CM26/Hi-Lumi Meeting SLAC May.
Answers to the review committee G. Ambrosio, B.Bordini, P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
MQXFSM1 results Guram Chlachidze Stoyan Stoynev 10 June 2015LARP meeting.
LQS01a Test Results LARP Collaboration Meeting 14 Fermilab - April 26-28, 2010 Guram Chlachidze.
FNAL Workshop, July 19, 2007 ILC Main Linac Superconducting Quadrupole V.Kashikhin 1 ILC Main Linac Superconducting Quadrupole (ILC HGQ1) V. Kashikhin.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
September 27, 2007 ILC Main Linac - KOF 1 ILC Main Linac Superconducting Quadrupole V. Kashikhin for Magnet group.
Magnet Strategy Michael Lamm Technical Division/Magnet Systems Department Fermilab Muon Accelerator Program Review Fermilab, August 25, 2010.
Jim Kerby Fermilab With many thanks to Vladimir Kashikhin, the FNAL, KEK, and Toshiba teams. SCRF BTR Split Quadrupole ILC ML & SCRF Baseline Technical.
Generic technology development - High field magnet R&D
A model superconducting helical undulators wound of wind and react MgB2 and Nb3Sn multifilamentary wires Center for Superconducting & Magnetic Materials.
11T Magnet Test Plan Guram Chlachidze
Model magnet test results at FNAL
MQXF Goals & Plans G. Ambrosio MQXF Conductor Review
Superconducting Helical Solenoids
Q0 magnet, cooling, support ideas
EuroCirCol: 16T dipole based on common coils
HTS Magnet R&D at BNL Ramesh Gupta November 17, 2017.
MBHSP02 test STATUS and first results
the MDP High Field Dipole Demonstrator
Yingshun Zhu Accelerator Center, Magnet Group
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
Guram Chlachidze Stoyan Stoynev
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
as a prototype for Super c-tau factory
MQXFS1e – PH-to-Coil hipot tests
Long term behavior of MQXFS1
Presentation transcript:

Muon Collider 6 D Cooling Model Magnets M. Tartaglia Technical Division, Magnet Systems Dept. Fermilab MAP Aug. 26, 2011M. Tartaglia1

MAP Aug 26, Topical Workshop on the Neutrino Factory and Muon Colliders 2 Colliding Ring/IR Magnets ~10 T, wide aperture/ open midplane Wide aperture 20 T solenoids HCC solenoid rings up to 20 T (one of many options-most challenging magnet-wise) Very High Field Solenoids Interesting Magnets in Muon Colliders 6-D Cooling ChannelTransverse Cooling up to 50 T

MAP Aug. 26, 2011M. Tartaglia3 The helical solenoid (HS) concept (FNAL/Muons Inc.) : Coils follow the helical beam orbit generating solenoidal, helical dipole and helical quadrupole fields Multi-section HCC Would require 160 meters of magnets Wide range of fields, helical periods, apertures  Room for RF system Field tuning is more complicated at high fields  NbTi, Nb3Sn/Nb3Al and HTS in final stage (progression of models) Early Specs, ca K. Yonehara, S. Kahn, R. Johnson et al. Helical Cooling Channel

MAP Aug. 26, 2011M. Tartaglia4 Hoop Lorentz forces intercepted by stainless steel rings around the coils Transverse Lorentz forces intercepted by support flanges Outer LHe vessel shell provides mechanical rigidity to the structure The peak stress is ~60 MPa Two short models built and tested successfully HS Mechanical Concept (FNAL)

MAP Aug. 26, 2011M. Tartaglia5 HSM 01, HSM 02 NbTi Model Magnet Design & Documentation  Design, Fabrication, Testing Primary Responsibility Program OversightMike Lamm Sasha Zlobin, John Tompkins Magnetic DesignVladimir Kashikhin Mechanical Design & FabricationSasha Makarov Nikolai Andreev, Miao Yu Testing & AnalysisMike Tartaglia Guram Chlachidze, MTF !  Documents  Tiweb.fnal.govMagnet Description Documents TD Test of Four Coil Helical Solenoid Magnet HSM01 PAC’09Four Coil Superconducting Helical Solenoid For MANX TD HSM02 Magnet Fabrication and Test Summary MT-22Model NbTi Helical Solenoid Fabrication and Test Results

MAP Aug. 26, 2011M. Tartaglia6 HSM 01, HSM 02 NbTi Model Magnet Design Features 4 coil prototype model magnets with large aperture  1 st Two models in planned series: Technology Demonstration  HSM02 same design with improvements based on HSM01 experience  Largest diameter that can be tested in VMTF R&D stand (OD ~ 25”) “Hard Way Bend” winding of NbTi cable (LHC quad – not optimized)  Smooth transition without splices between 4 offset coils  “keystoned” cable hard to wind with high packing factor  HSM02 cable flattened, improved winding  Embedded quench protection strip heaters Epoxy-impregnated coil package  Stainless steel rings control hoop Lorentz stresses  Sharp edges require care with insulation scheme  but provide no pre-stress on coils to constrain conductor motion  Next step in the progression will use Aluminum outer rings No Iron Flux Return  Large stray field, forces on SC leads  SC Lead motion in HSM01 led to some quenches, ground fault

MAP Aug. 26, 2011M. Tartaglia7 HSM 01, HSM 02 NbTi Model Magnet Design HSM01 Dissection After Testing

MAP Aug. 26, 2011M. Tartaglia8 HSM 01, HSM 02 NbTi Model Magnet Assembly

MAP Aug. 26, 2011M. Tartaglia9 HSM 01, HSM 02 NbTi Model Magnet Tests Main Test Goals: Measure Mech. Stresses Quench Performance vs Temperature vs Ramp Rate Protection Heater Effic. Magnetic Field Map HSM01 tested in Nov/Dec 2008 TD , PAC’09 Ground Insulation issues Epoxy voids, packing factor SC lead support Coordinate System HSM02 tested in Nov/Dec 2010 TD , MT-22 2 thermal cycles (quench re-training) LN 2 Conduction cooling study

MAP Aug. 26, 2011M. Tartaglia10 HSM 01, HSM 02 NbTi Model Mechanical Stress  Detailed HSM01 mechanical stress analysis made in TD FEM analysis of Cool down (.2-.3%); Lorentz Force <.007%) stresses Transverse (radial), Azimuthal, Longitudinal, compensating (T,B) gauges on coils Predicted Max On Coils: 13 MPa (T), 10.5 MPa (A), 34.5 MPa (L) Predicted Max On Links: 116 (T), 101 (A), 306 (L) “Acceptable” for 304 S.S., “designed far beyond required even for Nb3Sn” Hard to measure with any confidence Imperfect compensation, gauge calibrations? Debonding from surface measured stresses were < or ~ consistent with calculated  HSM02 has same mechanics Instrumented with fewer gauges (4 Azimuthal + 1 comp.) Cool down stress analysis not completed – inconsistent gauge data (warm/cold) suggests debonding Lorentz force stresses were <~0.008%

MAP Aug. 26, 2011M. Tartaglia11 HSM 01, HSM 02 Test Results Quench Studies  Quench Protection  MIITS calculation (local heat balance), Peak Temperature Rise LHC Outer cable (30 0.8mm strand NbTi) max. 11 MIITS; data ~3-4 Conductor RRR – Copper stabilizer resistance (higher RRR is better) HSM01 ~ (same as LQXB)HSM02 ~102 (rather low; why?)  Magnet Description Document Low Inductance ~200  E stored (16kA)~26 kJ Dump Resistor energy extraction (t~L/R bus+mag, Vmax=IR dump ) R d HSM01 = 10 m , HSM02 = 60  m   Protection Strip Heaters Study of inducing quenches (for long magnets)

MAP Aug. 26, 2011M. Tartaglia12 HSM 01, HSM 02 Test Results Quench Performance  Quench Prediction: at 4.5 K, HSM01~16 kA, HSM02 ~ 15 kA Magnet Load Line crosses Conductor Critical Current (vs T) Peak field is slightly higher on end coils Somewhat slow quench training to plateau HSM01 (HSM02) reached 85% (100%) of I c Very similar training curves - slightly erratic (char. of epoxy-impregnated coils) Little temperature dependence of training rate (higher Ic, mechanical limitations) Quenches mostly in end coils for both

MAP Aug. 26, 2011M. Tartaglia13 HSM 01, HSM 02 Test Results Quench Performance  Quench Locations Generally only know which coil quenched (one voltage segment across each coil) There has been no detailed analysis of quench velocity HSM02: Two quenches developed ~ simultaneously in adjacent coils presumably originating in transition region between coils

MAP Aug. 26, 2011M. Tartaglia14 HSM 01, HSM 02 Test Results Quench Performance  Quench Prediction: at 4.5 K, HSM01~16 kA, HSM02 ~ 15 kA Design would allow at least 15 % current operating margin Plateau is “remembered” at 4.5 K after reaching highest current at 3.0 K Fast Re-training of HSM02 after 300K T-cycle Virtually no ramp rate dependence (both magnets) to quite high ramp rates (600 A/s) … as expected Quenches Dip at 3K: Allowed 30 minutes recovery between quenches Quench 52: waited 1 hour

MAP Aug. 26, 2011M. Tartaglia15 HSM 01, HSM 02 Test Results Quench Heater Performance  Quench Protection Heaters HSM01 had S.S. strip heaters on Outer Layer of each Coil Three were full length, one 6-inch “spot” heater Time did not allow exploration of heater parameters only one quench induced, at low heater voltage HSM02 S.S. strip heaters on mandrel prior to winding of each Coil All in parallel, with 4W external resistor ; fixed HFU capacitance (to increase range of parameters given heater voltage limits) Mapped out Time (heater fired to quench detected) vs {I, Vhfu} Still needed: calculate heater power density

MAP Aug. 26, 2011M. Tartaglia16 HSM 01, HSM 02 Test Results Quench Heater Performance  Conduction Cooling Study We do not have the facilities to test indirectly cooled magnets Need vacuum vessel for insulation VMTF is not a good vac. Vessel No helium supply to cooling tubes Helium vapor-cooled leads for power testing We tried a simple thermal test Pump out VMTF helium space; we achieved <0.1 Torr Connect LN2 to cooling tubing Measure T vs time on all four coils with 1 RTD/coil +top, bottom Not so great: RTD calibrations are sparse at high T (300, 80K) No one has had time to model expectations, compare with data

MAP Aug. 26, 2011M. Tartaglia17 HSM 01, HSM 02 Test Results Quench Heater Performance  Conduction Cooling Study We learned one very important Lesson Copper tubing wrapped around each coil Makes a beautiful 10:1 transformer! This is not the right way to design the cooling tube layout

MAP Aug. 26, 2011M. Tartaglia18 HSM 01, HSM 02 Test Results Magnetic Field  Magnetic Field Maps: 3D Hall probe scans, vs 3D model prediction What are the tolerances On “field quality” On ring positions ? These will be measured Carefully in HSM02 (better attention to alignment/survey features, Coordinate systems)

MAP Aug. 26, 2011M. Tartaglia19 HSM 01, HSM 02 Test Results Magnetic Field  Magnetic Field Maps: 3D Hall probe scans HSM01 ±10A at 300 K, 2 kA at 4.5 K (in 1.75” warm bore tube) HSM02 5 kA at 4.5 K(warm planned) There is no central axis (offset rings) Mechanical center is well defined Fiducial marks allow probe positioning Make comparison to 3D Model Cold measurements along a central line no surprises – Bz/I agrees with warm Warm measuments central line along Z (solenoid dir.) Along Z at {R=4cm,  } Off-axis: Relating {magnet, probe, model} Coordinate Systems needs a bit more attention (done in HSM02)

MAP Aug. 26, 2011M. Tartaglia20 HSM 01, HSM 02 Test Results Magnetic Field  HSM01

MAP Aug. 26, 2011M. Tartaglia21 HSM 01, HSM 02 Test Results Magnetic Field  HSM02: Still setting up to do warm measurements at ±10A Conventional Test Stand B tied up with Accelerator Support projects New system development, new 3D Senis Hall probe (vs 3 1D probes) Minor complication: steel table (mounted high on Al beam)

MAP Aug. 26, 2011M. Tartaglia22 HSM Next Steps Other models in progress, planned  HSM03 – same design but with Aluminum rings for coil pre-stress  HSM04 – Nb 3 Sn design Needed for inserts in higher field cooling regions Very different technology (small part of larger High Field magnet program)  Helical solenoids using HTS (BSSCO wire or YBCO tape) conductor Also needed for inserts in higher field regions New, very different technology –  collaboration with Muons, Inc. to design, build, test first model  First YBCO model has been built and tested –  results for another talk !