Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.

Slides:



Advertisements
Similar presentations
IP Area Reconfiguration Conceptual Design Five Phases: 1.Transport (A) 2.Gas Chamber 3.Injection Chamber 4.Compressor 5.Transport (B) M. Litos July 24,
Advertisements

FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
MONALISA installation at the ATF2 ATF2 weekly meeting.
1 Stefan Moeller 1 AMO Instrument Schedule ARR AMO Instrument Schedule Stefan Moeller – XES Manager June 30, 2009.
Bill White Laser Installation and April 20, Laser Installation and Commissioning April 20, 2006 Procedures.
Compressor status AWAKE Technical Board meeting 19 May 2015.
Laser news AWAKE performance meeting Overview There was a meeting on with the supplier of the laser system (AMPLITUDE) No new information.
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
SR1 ongoing workH.Pernegger21/2/02 Ongoing work in SR1 and preparations for detector macro assembly Heinz Pernegger.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Summary of the AWAKE Technical Board Meeting September 2014 – March 2015.
1 MICE-Video Conference Status of MICE Hall Contents: General status Electrical Mechanical Preparing for Steps II & III Risks and worries Andy Nichols,
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
Impact on Project Planning and Cost. Agenda CERN Project Budget Planning Summary E. Gschwendtner, 9 April
Laser Beam Transport and Integration. AWAKE Collaboration meeting. Mikhail Martyanov Christoph Hessler CERN, EN-STI-LP Valentin Fedosseev CERN
Integration of the Experimental Facility in West Area & CNGS 1Ans Pardons, 18/10/2012 Integration of experimental facility in West Area and CNGS With input.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
Integration, Installation & Infrastructure Ans Pardons, with input from the WP4 members September 2014.
Beam Dump Upgrade Planning Keith Welch 2/5/13. Drivers for Upgrade Historical Problems – Hardware failures Helium system Windows, diffusers Dehumidifiers.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
Laser Status Update J. Moody, E. Oz, P. Muggli MPP Future Accelerators AWAKE Collaboration
Update on Laser Beam Lines Christoph Hessler, Mikhail Martyanov, Valentin Fedosseev (CERN laser team)‎ Thanks to M. Battistin, N. Chritin, F. Galleazzi,
Compressor status AWAKE Technical Board meeting 19 August 2015.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
9 th AWAKE Technical Board 11 March Actions from Last Technical Board WP laser and MPP: decide until March 2015 which compressor design will be.
AWAKE E. Gschwendtner, EATM, 1 July Highlights Since April 2015 Cabling, piping and rack installation campaign for the AWAKE facility has started.
Update on the Laser Beam Line
ASTA Accelerator Directorate Review Project Plan and ES&H Carsten Hast May 20, 2014.
Bill White Commissioning October 9, 2006 Drive-Laser Commissioning Status and Plans Requirements Where do we stand today?
Design, integration and installation milestones Legend: 2015/Q1= 1 st quarter of 2015 (January-March) Phase 1 = proton & laser beams operation Phase 2.
1 Sector Test – Preparation Layout in LSS7 Jan Uythoven (AB/BT) Thanks to Mike Lamont and the other ‘sector testers’
AWAKE Technical Board, 19 August E. Gschwendtner, CERN.
Integration and Installation Status for Collaboration Meeting Ans Pardons, 29/9/2015.
MERIT review, Dec. 2005CERN AB-ATB1 CERN installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Summary of the AWAKE Technical Board Meetings Edda Gschwendtner.
Accelerator Installation Plan: Graphical representation E. Sargsyan & L. Lari DRAFT - March March 2016.
Laser Control Status A. Masi, T. Feniet, K. Szczurek Awake Technical Board November 12 th 2015 Thanks for inputs from: M. Donze`, V. Fedosseev, C. Hessler.
Status of AWAKE Laser Line Installtion For the EN-STI Management Board - 30 May 2016 Presented by Valentin Fedosseev.
ELENA installation progress F. Butin / ELENA collaboration.
Report Technical Director Storage-Ring-Installation Completed
SR1 extension follow up 27-Mar-17 Marco Ciapetti.
He Plant, LN2 Systems and Commissioing
CBETA Technical Review
Drive-Laser Commissioning Status and Plans
Francois and Lau EATM 17 July 2012
CLEX Building Layout, Conventional Facilities, TL2, TL2’,
CLEX* Status and Plans CTF3 complex CLEX

G0 Detector Working Group Meeting
AWAKE proposals for BE/BI
XFEL Vacuum System Commissioning
EuPRAXIA working package report
Status of the cryogenic system for B180
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
Undulator System Installation

Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE

Advanced Research Electron Accelerator Laboratory

Safety Group Program Timeline
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE

Project management Ray Veness.
Injector/Linac Design Status C. E
Safety Group Program Timeline
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014

Actions and milestones PeriodActionMilestones / datesComments Definition of position for laser coreMerging position fixedDone, Jan.2014 Design of general layout of laser path to plasma cell Layout proposed for integrationDone, Jan T Definition of CV requirements for laser room CV proposal accepted (May 2014) Proposal in work T1-T Definition of special laser access requirements Access modes agreed with GS/ASE (June 2014) Proposal in work T1-T Design of vacuum chambers for optics (with EN-MME, TE-VSC) - Drawings of laser beam safety shutter (June 2014) - Drawings of corner chambers (July 2014) - Drawings of Merging chamber ( Sep 2014) - Drawings of tube to e-gun (Oct 2014) In work Outgassing rates of commercial optical mounts to be tested T4 2014Design of air structures for laser beam support - Drawings for path to plasma (Nov 2014) - Drawings for path to e-gun (Dec 2014)

PeriodActionMilestones / datesComments T Design of SAS and clean room (with GS/SE) - Drawings for civil engineering work (Sep 2014) Including CV integration T – T Purchasing Deliveries: - Beam shutters (Sep 2014) - Optical mounts (Jan 2015) - Door interlock (May 2015) - Optics (Jun 2015) - Laser tables (July 2015) - Instrumentation (Aug 2015) T1 2015Civil engineering work in laser room - Walls painted - Floor refurbished - SAS ready - False ceiling installed T Installation of ventilation and other services in the laser room - Ventilation system - Water - Compressed air - Fore vacuum pipe - Power cables and sockets - Fire detection and alarms - Ethernet T3 2015Timing cables in laser room- Fibre cables and GMT - Local network for 10 Hz laser synchronization

PeriodActionMilestones / datesComments T3-T Assembling of mechanical elements - Vacuum tube to e-gun (Aug 2015) - Vacuum tube to p-line (Sep 2015) - Access elements to laser areas installed (Sep 2015) - Mounts in vacuum (Sep 2015) - Mounts in air (Oct 2015) Clean room to be ready on Sep 2015 before laser and optics installation T3-T Installation of laser area access controls - Local laser interlock (Sep 2015) - Laser beam shutters (Oct 2015) - Shutter controls (Oct 2105) T4 2015Laser installation - Laser on table and connected to services (Oct 2015) - Optics mounted (Nov 2015) - Compressor and chambers with optics pumped (Nov 2015) - Beam control and diagnostics HW mounted (Dec 2015) T1-T2 2016Laser line commissioning - Laser operational - Laser beam control operational In parallel with plasma cell installation: Access to TT41 limited ! T1-T2 2016Laser dumps installation- Laser dump A integrated in the p- beam diagnostics (June 2016) - Laser dump B in front of Be window installed ( ? )

Laser line for electron beam PeriodActionMilestones / datesComments T3-T Design of general layout of the photoinjector laser setup Layout proposed for integration T1-T4 2016Off-line tests at CTF2Photo-injector commissioned T1-T Purchasing- Optics - Compressor and stretcher - Optical mounts - Laser tables and breadboards - Instrumentation T1-T Installation of laser beam hardware - Optics mounted - Beam control and diagnostics HW mounted In parallel with AWAKE physics T2-T Installation of access controls for e-gun laser area - Laser beam shutters installed - Shutter controls installed - Laser expert access control implemented In parallel with AWAKE physics T4 2017Laser line commissioning-Laser beam control operational -UV pulses produced -Electron beam produced