Preparation & Commissioning of TOTEM for the Run-II of LHC S.Giani on behalf of the TOTEM Collaboration.

Slides:



Advertisements
Similar presentations
Clara Gaspar on behalf of the LHCb Collaboration, “Physics at the LHC and Beyond”, Quy Nhon, Vietnam, August 2014 Challenges and lessons learnt LHCb Operations.
Advertisements

LHC Experiments at Liverpool E2V Visit – Nov 2005 Introduction Si Technology Upgrade/Maintenance Summary.
Slide 1 sCVD Diamond for the CMS Pixel Detector May 2004 R.Stone, Rutgers J.Doroshenko, L.Perera, S.Schnetzer RD42 Collaboration Meeting Overview.
Saverio MINUTOLITIG meeting, 10 February Report on T1 installation activities and achievements made during this shutdown.
Gueorgui ANTCHEVNEC’2013 – Varna, Bulgaria 1 The TOTEM Experiment Consolidation and Upgrade G. Antchev * On behalf of the TOTEM Collaboration * INRNE-BAS,
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
2 1/March/2015 日本物理学会大70回年次大会@早稲田大学 東大ICEPP 内山雄祐 他 MEG II collaboration.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
Experimental equipment interacting with beam operation D. Macina TS/LEA Many thanks to my colleagues both from the experiments and the machine for their.
LS2 Other LHC Experiments Mike Lamont Thanks to: Michael Rijssenbeek (AFP) Joachim Baechler (TOTEM) Karl-Heinz Hiller (ALFA)
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
RP detectors CTS Sensors now in production, full delivery between February and June 07 Production GUI and DB being finalised Test Procedure being defined.
A Silicon vertex tracker prototype for CBM Material for the FP6 Design application.
ECRs and ES for the LHC Last presentation on the 26 th of August 2015 (LMC 232) S. Chemli for EN-MEF-DC LMC xxx.
LHCb VErtex LOcator & Displaced Vertex Trigger
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
Outlook Production of the 12 DPs (220m Stations) Installation of the DPs in the LHC Tunnel Status of the RP Systems/Services Resources Production of DPs.
Progress report Collaboration meeting 23-SEP-2009
Status of NA62 straw electronics Webs Covers Services Readout.
LHCf: installation & commissioning Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
CF 16/Feb/20031 H8 Beam Test in 2003 ─ Preparation status TGC-Japan electronics group.
CMS pixel telescope at MTEST 1 A. Kumar, S. Kwan, A. Prosser, R. Rivera, M. Turqueti, L. Uplegger.
Test of Single Crystal Diamond Pixel Detector at Fermilab MTEST Simon Kwan Fermilab April 28, 2010.
FPD STATUS Carlos Avila Uniandes/UTA 1. FPD overview 2. Roman pot and detector status 3. FPD readout integration status 4. Software status 5. Stand-alone.
24/03/2010ALICE TOF General Meeting March TOF hardware and data taking 2010 Andrea Alici Museo Storico della Fisica e Centro Studi e Ricerche “Enrico.
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 1/15 Jeroen van Tilburg (Universität Zürich) LHCb: Preparation for LHC.
General Muon Meeting, 03-March-2014 Jay Hauser “Update on Phase 2 muon Technical Proposal”  Recent developments:  ME0 inserted into HGCAL as for other.
Walter Snoeys – CERN – PH – ESE – ME –TOTEM October 2009 TOTEM Electronics Status.
Dec
Status of the TOTEM Experiment and Latest Results
Gennaro Ruggiero CERN, PH Depart. Planar Edgeless Detectors for the TOTEM Experiment On the behalf of the TOTEM Collaboration
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
Status and organization of the H8c area Mirko Berretti 08/07/2015 (with M.Bozzo, N.Minafra, E.Oliveri, X. Pons…)
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Tracking at the Fermilab Test Beam Facility Matthew Jones, Lorenzo Uplegger April 29 th Infieri Workshop.
AEM, Sept Frank Chlebana (Fermilab) Status of the LHC and CMS Frank Chlebana (Fermilab) All Experimenter’s Meeting Sept
TOF status and LS1 plansTOF status and LS1 plans 27/06/2012.
TOTEM Status Report F.Cafagna CERN & INFN-BA on behalf of TOTEM Collaboration.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
Joint LHC Machine-Experiments Workshop on Very Forward Detectors - 25 January 2007 Beniamino Di Girolamo - CERN PH ATLAS Roman Pots status, commissioning.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
Mike AlbrowSept 8 th 2005Test Beam for FP420 Vacuum Chambers/Detectors 1 Things we need to test (and why) How we could, together with BTeV people, detectors,
ATLAS Forward Proton Detectors ATLAS Forward Proton Detectors Michael Rijssenbeek for the ATLAS Collaboration Physics summary: Physics withSingle and Double.
Latest results with the timing diamond detectors from TOTEM Diamond detectors development for the proton TOF measurement Results with the final TOF plane.
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
Kreuth, 2015/10/5-9 Csörgő, T. Evidence for non-exponential pp d/dt at low t and √s = 8 TeV by TOTEM T. Csörgő for the TOTEM Collaboration.
Status of the Experiment RRB - TOTEM 16 April 2013 S.Giani - CERN on behalf of the TOTEM Collaboration CERN-RRB
ELENA installation progress F. Butin / ELENA collaboration.
Testbeam Planning Common to all testbeams:
The timing upgrade project of the TOTEM Roman Pot detectors
Status of the ATLAS Forward Proton Detectors Michael Rijssenbeek for the ATLAS AFP group 25FEB2016.
Introduction Status before the 2009 run Results from the 2009 run
First data from TOTEM experiment at LHC
Start Detector for pion experiments
T1 status (a selection from EDR presentations)
T1 Electronic status Conclusions Electronics Cards:
Simulated vertex precision
DESY Test Beam Facilities - Status and Plan
LS2 LHC forward experiments
(with R. Arcidiacono, A. Solano)
The timing upgrade project of the TOTEM Roman Pot detectors
Preparation of the CLAS12 First Experiment Status and Time-Line
TOTEM experiment at the LHC
Status of CMS-PPS timing detectors
Results, Status and Perspectives for 2011
Presentation transcript:

Preparation & Commissioning of TOTEM for the Run-II of LHC S.Giani on behalf of the TOTEM Collaboration

IP5 RP147RP220 Roman Pots: measure elastic & diffractive protons close to outgoing beam Initial Experimental IP5 (Run-1) Inelastic telescopes: charged particle & vertex reconstruction in inelastic events IP5 T1: 3.1 <  < 4.7 T2: 5.3 <  < 6.5 ~ 10 m ~ 14 m T1 CASTOR (CMS) HF (CMS) T2

RP (Si) T1 (CSC) T2 (GEM) RP (Si) Commissioning of TOTEM Detectors for the Run-2

TOTEM RP Consolidation & Upgrade Program Existing RP220 (vertical + horizontal RPs) Upgraded Roman Pot System RP147 relocated to m (vertical + horizontal RPs) Consolidation: Relocate pots at 214m and 203m to improve lever arm and tracking Upgrades: Timing detectors in vertical RPs; installation of new cylindrical horizontal RPs for timing detectors and of current horizontal RPs with RF shields for CT-PPS TOTEM: Upgrade TDR & TDR Addendum endorsed by LHCC [minutes Nov’14] CT-PPS: TDR technical baselines already endorsed by LHCC [minutes Nov’14]

overview (schematic) 1 horizontal RP TIMING Detector 1 horizontal RP TIMING Detector Near 2 vertical RP top/bottom 1 horizontal RP 2 vertical RP 1 horizontal RP TRACKING Detector Far 2 vertical RP top/bottom 1 horizontal RP 2 vertical RP 1 horizontal RP TRACKING Detector Existing TOTEM RP-220 m (near-far) New timing detectors TCL-6 CMS ip5 ~ 220 m outgoing beam New Si pixel tracking detectors in horizontal RPs + RP - RF shield Q6 ~ 5-10 m~ 5 m shielding New LHC component New RP stations TCL-4 New LHC component All RPs can be operated simultaneously ! Relocated stations from 147 m RPs Consolidation & Upgrade – Flexibility

RPs Performance - Example

Roman Pot Readiness for Run-2 Full RP infrastructure deployed in LHC’s sectors 45&56 – 26 RPs installed! Oct 2014 RPs are on schedule expected to run with the earliest LHC’s beam Mar 2015 Service lines connected Detector packages installed Nov 2014 Jan-Feb 2015 Commissioning done Sec. Vacuum & Cooling Powering Control loop RP readout with DAQ Interlock test - started RP movement test from CCC - started Full RPs configurations qualified by LHC impedance group [ LMC ] Apr 2015 May 2015: Alignment run scheduled this week

T1 Readiness for Run-2 Maintenance activity is over Tested on surface: Low voltage HV and gas Control Loop DAQ Sep 2014 Nov 2014 T1 is installed into the CMS end-caps March 2015

T2 Readiness for Run-2 Maintenance activity is over Commissioning on-going Sep Jan T2 is installed at CMS Mar Oct CMS closed, magnet test was performed T2 Re-insertion in HF LV, HV, gas Detector operation Up to the 11 th of Feb T2 was fully checked and functional On the 12 th due to mechanical stress one quarter was damaged. Due to the tight schedule, to avoid instabilities of the full arm it was decided to exclude the damaged quarter from the control loop Impact of having one T2 quarter not operational is less or equal of 1% in all the main physics channels T2 switched on at LHC and calibrated with CMS Apr. 2015

DAQ Consolidation Replacement of the VME back-end with Ethernet 1Gb links, using RD51 FrontEnd Concentrator (FEC) cards Full compatibility with CMS DAQ and LHC TTC (new hardware installed) Procurement completed Commissioning done in the test-bench with real beam reading out the RPs 20kHz trigger rate measured: ~20x w.r.t. previous DAQ system Ready for installation in IP5 First demonstrator tested in IP5

DAQ Ongoing Work Scaling of the full infrastructure of TOTEM stand-alone DAQ Storage space Add computing resources CPUs, FPGAs Studies of on-line hardware algorithms: Data-reduction Filtration based on on-line reconstruction Further improvements of the DAQ rate capabilities Integration with the CMS DAQ Ethernet based DAQ crate 4Gb/s aggregated throughput

Timing Detector Development for Vertical RPs Objective: 4 timing detectors per arm in vertical RPs First detectors installation foreseen by Oct 2015 Ultimately 50 ps resolution per arm (100 ps per detector) Development: Intense test beam activity to characterise different detector and front-end configurations (Jul 2014 – Feb 2015). Optimization of connection capacitance, front-end amplifier configuration –Improve the S/N ratio –Improve the rise time –Improve the time resolution

Test-beams Timeline and Milestones At PS pions 10GeV  (t)=300 ps CIVIDEC Amplifiers CIVIDEC SC Diamond At SPS – pions 180GeV  (t)= ps Reduced capacitance on the sensor’s PCB TOTEM custom amplifiers Jul 2014 Oct 2014 Nov 2014 At SPS pions 180GeV  (t)=~90 ps GSI diamond sensor and associated hybrid with embedded front-end amplifier. Sep 2015 First timing detectors are expected At SPS – pions 180GeV Test of first TOTEM hybrids and front-ends Benchmark with GSI Dec 2015 At DESY Requested test- beams for final design validation Apr-Jul 2015 Feb 2015 At DESY – electrons GeV  (t)=95 ps Test of TOTEM hybrids, optimizations towards final design

Test-beam at DESY “DATURA” tracker 18μm pitch pixel GSI hybrid HADES Coll. TOTEM hybrid 4 pixel diamond with final geometry for Vertical RP

Time Resolution (x plane) Time difference measured between Det1 (C = 2pF) and Det2 (C = 0.29pF)

17 Detector Efficiency Efficiency measurement: metalization gap

CT-PPS timing TOTEM tracking CT-PPS tracking 2 CT-PPS tracking 1 CT-PPS: components installed during LS1 IP5 ► TCL 4 & TCL 6 in 4-5 and 5-6 Electrical patch panel Service lines for LV/HV/DAQ CT-PPS specific: 2 * RP box with RF shield in 4/5 2 * RP box with RF shield in 5/6 1 * RP cylinder in 4/5 1 * RP cylinder in 5/6

Update on CT-PPS Summary Roman Pots are installed & calibrated in the LHC tunnel at ip5 Collimators TCL4 and TCL6 are installed RP Si-strip detectors & electronics successfully tested Insertion of horizontal RPs at low β* under discussion with LHC coordination Quartic fabrication and integration in cylindrical Roman Pot under preparation Quartic electronics and firmware is under design 3D pixel sensors production is in preparation at CNM CT-PPS is joining Tracker production of DAQ boards (uTCA) Beam tests scheduled at Fermilab & CERN SPS Active R&D in several fronts Installation of new components in tunnel (FE electronics/clock/DAQ) needs to be specified and summarized in addendum to ECR upgrade [ from LHCC report by J.Varela ]

RadMon Setup (v.2) with DCS, RadMon and heat exchanger (in March 2015) CT-PPS Plans for 2015 G.Anchev

First LHC Collisions at 13 TeV (21 May 2015)