Track # Case Study Trail of the Coeur d'Alene Challenges.

Slides:



Advertisements
Similar presentations
The Upper Columbia United Tribes (UCUT) Formed in 1983 to provide a common voice for our region through the collaborative efforts of the Upper Columbia.
Advertisements

Environmental Scoping Guidance Jerry Vogt Region Environmental Coordinator ODOT – Region 3.
Preserve Sudbury Vote NO to the Rail Trail Articles
A Highway Corridor Planning Process for NEPA Compliance Using Quantm Goose Creek Canyon Bypass Case Study A Unique Approach to Corridor Planning.
Technical Excellence Practical Experience Client Responsiveness.
Titusville to Edgewater Bike Loop PD&E Study
Strategic Approach to a Walkable Edmonton Pro Walk / Pro Bike 2004: Creating Active Communities September 9, 2004.
January 31 st, 2012 North Coast Corridor A Better Environment for the Future.
From KY 89 at the northern city limits of McKee to the recently improved section of US 421 just north of the Jackson-Rockcastle County line. Six-Year Highway.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
State of Water: Minnesota’s Lakes, Rivers and Wetlands John Jaschke Minnesota Board of Water and Soil Resources Nov 13, 2014.
Gold Ray Road Solutions Team November 20, 2008 Physical Conditions Engineering Constraints.
Dredging, Disposal Management and Impacts on Lake Sediments US Army Corps of Engineers.
Sustainability and Best Management Practices Environmental Remediation Russell Downey Pfizer Global Engineering 5 November 2014.
Consulting Trends and the Design Process. Fundamental activities conducted by consulting firms Winning work Doing work Managing work Managing business.
Bureau of Reclamation Overview Christopher Cutler Deputy Chief Boulder Canyon Operations Office.
Our mission ead and execute environmental programs and provide expertise that enables Army training, operations, acquisition and sustainable military communities.
Rural Development Water and Waste Projects: Environmental Requirements John Helgren, P.E. – State Environmental Coordinator Madeline Crowe – Assistant.
Distribution Guided by State Law Surface Transportation Program (STP) Surface Transportation Program (STP) Congestion Mitigation & Air Quality Improvement.
1 U.S. ARMY CORPS OF ENGINEERS AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Indian River Lagoon North Restoration Feasibility Study Public Meeting September.
© 2014 HDR, Inc., all rights reserved. COUNCIL BLUFFS INTERSTATE SYSTEM MODEL Jon Markt Source: FHWA.
Building Strong! 1 US Army Corps of Engineers Regulatory Program Kimberly McLaughlin Program Manager Headquarters Operations and Regulatory Community of.
BUILDING STRONG SM 1 Columbia River Salmon and Federal Columbia River Power System Rock Peters Senior Program Manager.
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Greenways and Shared-Use Paths Lesson 19 Publication No. FHWA-HRT
Elmwood School Forest Property Recommendations Presented By Forestry and Wildlife Class
Highway Location Study CE 453 Lecture 4 See also lab 2 and lab 4 instructions, and EIS lecture notes See also 04 DOT development process.doc Refs:
Economic Opportunities from Environmental Harms: The Passaic River Example Bill Jackson
Integrating Other Laws into BLM Planning. Objectives Integrate legal requirements into the planning process. Discuss laws with review and consultation.
Spectron Superfund Site Proposed Plan Contaminated Shallow Soils U.S. EPA Region III June 26, 2003 Philadelphia, PA Robert J. Sanchez US EPA - Remedial.
Harbors Module NH1: Authorities and Policies. NH1 - 2 BU ILDING STRONG SM Student Learning Objectives Student will be able to:  Describe the Federal.
State Water Planning Presented to State Water Plan Regional Advisory Committees December 8-19, 2003 William A. Gast Chief, Division of Water Use.
BUILDING STRONG SM Partnering and Coordination to Accomplish the Navigation Mission.
Green Line Extension Environmental Impact Report Public Scoping Session Somerville High School October 19, 2006.
Public Scoping Meeting National Environmental Policy Act Portageville Bridge Project Tuesday, November 19, PM – 7 PM Genesee River Restaurant,
Tom Norton, Executive Director Colorado Department of Transportation American Association of State Highway and Transportation Officials September 9, 2003.
Laguna Creek Watershed Council Development of the Laguna Creek Watershed Management Action Plan & It’s Relevance to the Elk Grove Drainage Master Planning.
Roseau River Flood Damage Reduction Project Roseau, Minnesota.
Triangle Park Removal Action Area within the Portland Harbor Superfund Site (Portland, Oregon) Jennifer MacDonald Assistant Regional Counsel Office of.
1 Moab Uranium Mill Tailings Remedial Action (UMTRA) Project Site LTS&M Planning LTS&M Conference Grand Junction, CO November 16, 2010 Donald Metzler U.S.
Capturing Brownfield Success: A National Glimpse.
Land Resources and Conservatio n. Land Ownership in U.S. 55% of land in U.S. is privately owned 35% of land in U.S. is owned by federal government 3%
CORPS OF ENGINEERS REGULATORY PROGRAM PUBLIC INTEREST REVIEW (33 CFR Part 320) August 12, 2005.
February, Location Map South Central Rail Extension One Possible Rail Route.
Our Trail Journey So Far and The Adventure Ahead.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
Department of Port Control Center for Regional Economic Initiatives February Doan Brook Stream Restoration Project Center for Regional Economic.
Establishing the Scientific Basis for Ecosystem Management On the Upper Mississippi River Dr. Ken Lubinski, USGS Upper Midwest Environmental Sciences Center.
TRANSPORTATION ALTERNATIVES PROGRAM 2016 Project Scoring Update Workshop.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Providing Safe Waterfowl Feeding Habitat in Toxic Floodplains
Coeur d’Alene Basin TLG Repository PFT meeting December 9, 2003.
PROJECT OVERVIEW. 2 Green Line Extension Project 3 College Ave Ball Sq Lowell St Gilman Sq Lechmere Union Sq Washington St.
TRANSPORTATION ALTERNATIVES PROGRAM 2016 Project Scoring Update Workshop.
U.S. Section International Boundary and Water Commission Rio Grande and Tijuana River Flood Control Projects Programmatic EIS.
Office of Real Estate 2045 Morse Road E2 Columbus Ohio /9/2016.
Oil and Hazardous Substance Contingency Planning Presented By Jeffery Smith Regional Hazmat Coordinator Bureau of Reclamation Lower Colorado River Region.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
Iron Range Tourism Bureau April 25, 2013 Hwy 53 Update.
National Park Service U.S. Department of the Interior Gulf Islands National Seashore Perdido Key / Johnson Beach Environmental Assessment WELCOME TO GULF.
STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY.
US Army Corps of Engineers BUILDING STRONG ® Miles City, Montana Section 205 Gwyn M. Jarrett - Project Manager Omaha District April 27, 2016.
Financial Assistance 101 Planning for Brownfields Redevelopment Gregory M. Firely, BCES Senior Project Scientist.
The X Games: Brownfields to Recreation and Conservation Uses Presented By: Gail Wurtzler, Davis Graham & Stubbs LLP Robert Lawrence, Davis Graham & Stubbs.
Protecting Cultural Sites Shoshone-Bannock Tribes Environmental Waste Management Program By Zannita Armell.
MetroGreen A proposed 1,440 mile interconnected system of public and private open space, greenways and trails.
Kansas Experience in Technical Negotiations for Tribal Water Right Settlements Symposium on the Settlement of Indian Reserved Water Rights Claims, Great.
Draft Transportation Element September 6, 2017
Construction Management & Inspection
Federal-aid Highway Program
Presentation transcript:

Track # Case Study Trail of the Coeur d'Alene Challenges

2 Track # Scope of the Project  The project area consisted of a 72 mile long rail road right-of-way (ROW) within the Coeur d’Alene Basin  This equates to over –1,400 acres or > 2 square miles

3 Track # Background  Originally traveled by the Coeur d’Alene Indians  Evolved into an important rail line –Originally constructed by the Washington & Idaho Railroad Co. and the Northern Pacific Railway Co. –Carried silver and lead ore from Mullan, Burke, Kellogg to terminals on the Palouse prairie from 1887 – early 1990s.

4 Track # Trail Map

5 Track # Setting  The Coeur d’Alene Basin (1,500 sq. mi.) is impacted by lead from historical mining activities –Historical direct discharge of mine tailings to river system (EPA est million tons)

6 Track # Extent of the Problem  59 miles of the ROW had lead contamination throughout much of the ROW width and adjacent area – represented small percentage of the impacted area  Due to presence of sediments impacted by mining activities, volume of contaminated material could have exceeded 1,000,000 cy.  13 miles within the Coeur d’Alene Reservation had a more limited extent of lead contamination

7 Track # Practical Solution  For 51 miles outside of Reservation not previously remediated –Volumes made removal and disposal impractical –Impacted sediments within floodplain from historical mining activities made re-contamination likely –Best alternative – leave contaminated material in place and isolate with a protective barrier  For 13 miles within Reservation –Perform complete removal

8 Track # Keys to Practical Solution  Needed to maintain institutional control of ROW for protection and maintenance of protective barriers

9 Track # Resolution  Convert ROW to recreational trail under the CITU program and transfer to State and Tribe –Allowed for continued control of ROW under one entity –Provided economic benefit –Allowed future management of ROW corridor consistent with local priorities

10 Track # Challenges  Obtaining coorporation of multiple regulatory entities  Acceptance by the local communities (total population > 5,000)  Unique design requirements  Construction

11 Track # Cooperation of Multiple Parties U.S. EPA - Region 10 Union Pacific Railroad Coeur d’Alene Tribe Idaho Dept. of Parks & Recreation Idaho Dept. of Environmental Quality U.S. Fish & Wildlife Service U.S.D.A. Forest Service U.S. Army COE U.S. Dept. of the Interior U.S. Dept. of Justice Nine separate communities

12 Track # Key to Success  Communication –Weekly communication for over a year of planning and design  Recognition of different perspectives created by the combination of an environmental and recreational project  Flexibility

13 Track # Community Issues  Property issues  Crime associated with trail in “their backyard”  Disruption and inconvenience  Balancing special requests

14 Track # Solution  Communication  Numerous public meetings  Coordination and accommodation during construction

15 Track # Unique Design Requirements - Why an Environmental Remedy Includes Park Benches  Protective barrier provided throughout ROW within 13 miles of residential area  Outside of residential areas (39 miles) impacted flood plain sediments were present beyond the ROW  Design issue – manage risk to trail users from impacts outside of ROW: –A clean “corridor” created by a 20 foot wide asphalt/gravel trail –Clean stop and view and rest stops (oasis) to encourage trail users to stay on the trail and not enter lead contaminated areas

16 Track # Track Salvage Scope:Remove 64 miles of rail and ties & decontaminate ties (> 250,000) Tie Decon of Lead Contamination Removing Ties from Rail Bed Clean Ties for Salvage

17 Track # Protective Barrier Scope: Over 220,000 cy. placed

18 Track # Asphalt Scope: 66 Miles Placed Outside residential areas, 10 ft. wide asphalt and shoulder gravel served as protective barrier

19 Track # Trail Heads – Stop & Views Part of Risk Management

20 Track # Bridge Retrofit - Deck and Rail Scope: 35 Bridges

21 Track # Innovative Engineering Solutions  Modifications to the Chatcolet Bridge –3,146 foot long wooden trestle –Included a 220-foot swing span –Eligible for National Registry of Historic Places

22 Track # Chatcolet Bridge Scope: Incorporate 300 ton structure into trail – preserve boat traffic

23 Track # Raise 300 ton Structure

24 Track # Ramp Construction ADA Compliant

25 Track # Completed

26 Track # Positive Environmental Impacts

27 Track # Positive Community Impacts  Economic benefit  Recreational resource  Backyard industrial setting converted to park like setting