A Quick Tune Up of Your Professional Skill Set.

Slides:



Advertisements
Similar presentations
Incentives and BSC Managerial Accounting David Fender.
Advertisements

Forces and Breaking Forces Breaking Stopping distance Questions.
© Nuffield Foundation 2012 Nuffield Free-Standing Mathematics Activity Modelling a test drive © Rudolf Stricker.
Acceleration. Recall:  Acceleration is the rate at which velocity increases or decreases  If an object is accelerating is not experiencing uniform motion.
Regain Profit Through Quality ASQ Section 1530 Southwest Florida September 15 th, 2005 Presented by Mike Weekes Whataboutquality Whataboutquality (716)
Section 5-8.  The dashboard of your car gives you a lot of information about your car’s ability to go  It gives no information about your car’s ability.
Engineering and Technology Management A program in technical decision making and leadership for engineering and business professionals.
© BQF 2014 The community for every business seeking excellent insights, tools and experiences to improve itself The British Quality Foundation.
Lean Production Chapter 38. Definition  Lean production is a collection of methods that attempt to reduce waste in the production process.
Driving at Night & in Inclement Weather. Visibility The single biggest contributor to crashes is failing to identify a risk! Tips for cutting down those.
LEAN Overview Eliminating Waste. Overview LEAN & Six Sigma LEAN Principles Customer Needs Employees Gemba Walks / Ohno Circles Kaizen 8 Wastes Tools Value.
Workshop A Performance Boosting Tools Reality Check: Are you a Lean, Mean Manufacturing Machine ? The Matrix: Performance Measurement System.
Manufacturing Processes Copyright © Texas Education Agency, All rights reserved.
New Directions Learning & Development  All Rights Reserved. Lean Your Library: How Lean Six Sigma Strategies Can Improve Operations.
Driving at Night & in Inclement Weather. Visibility The single biggest contributor to crashes is failing to identify a risk! Tips for cutting down those.
Oriflame Purchasing Management Workshop Module 4 – Project Team Development Oriflame Vision & Strategy Supplier Interfaces The Business Model Supply Vision.
SMALL IS THE NEW TOMORROW. SMALL IS BIG ERP INVESTMENT INTO BETTER TOMORROW.
Proportions Round One 2) x + 3 = 15 Answers 2.) x + 3 = 15 X=12 21.
Freeleansite.com Kaizen (What is it ?) Lean Foundations Continuous Improvement Training Lean Foundations Continuous Improvement Training.
Value Chain Management: Functional Strategies for Competitive Advantage chapter nine Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved.
Инвестиционный паспорт Муниципального образования «Целинский район»
Team Development Slide 1 © The Delos Partnership 2005 Supplier Relationship Management Module 4 – Project Team Development Vision & Strategy Supplier Interfaces.
(x – 8) (x + 8) = 0 x – 8 = 0 x + 8 = x = 8 x = (x + 5) (x + 2) = 0 x + 5 = 0 x + 2 = x = - 5 x = - 2.
Six Sigma Measurement. Yield and Defects LSL Target Value USL Probability of Defects Probability of Yield.
Unit 2  Topic:  Company organization chart  Company objective.
 Recognize the problem and the need for a decision  Identify the objective of the decision  Gather and evaluate data and diagnose the situation  List.
Regional Innovation – Balancing Social Responsibility with Business Opportunity Michelle Mason, Managing Director, ASQ.
To what extent should management be involved in Lean implementations? 1 Sam Tomas.
How to Meet the Needs of Tomorrow’s Customers. All Rights Reserved, Juran Institute, Inc. Meeting the Needs of Tomorrow’s Customers 2.PPT Quick Reality.
1 New Product Development and Design for Manufacturability
FICCICECE Six Sigma - A Breakthrough Strategy Competitive Edge Management Consultants.
3:00. 2:59 2:58 2:57 2:56 2:55 2:54 2:53 2:52.
Section 1.5. What is Negative Acceleration? For our purposes – decreasing speed while a car is traveling forward – slowing down.
Dynamics and Space Velocity-time graphs. Learning Outcomes Velocity-time graphs for objects from recorded or experimental data. Interpretation of velocity.
Top lean six sigma consulting strategies for businesses Lean Six Sigma Manufacturing Consulting By: Group50.com.
QA Online Training and 100% Placement Assistance USA: UK:
Register FREE DEMO Live Instructor LED Face to Face Training 100% Job Oriented Training Live Projects on Different Domains Mock Interview Sessions On Job.
照片档案整理 一、照片档案的含义 二、照片档案的归档范围 三、 卷内照片的分类、组卷、排序与编号 四、填写照片档案说明 五、照片档案编目及封面、备考填写 六、数码照片整理方法 七、照片档案的保管与保护.
공무원연금관리공단 광주지부 공무원대부등 공적연금 연계제도 공무원연금관리공단 광주지부. 공적연금 연계제도 국민연금과 직역연금 ( 공무원 / 사학 / 군인 / 별정우체국 ) 간의 연계가 이루어지지 않고 있 어 공적연금의 사각지대가 발생해 노후생활안정 달성 미흡 연계제도 시행전.
A car starting from rest speeds up to 30 m/s with a constant acceleration over a time of 10 seconds. Then, it travels at 30 m/s for 10 seconds, and finally.
Жюль Верн ( ). Я мальчиком мечтал, читая Жюля Верна, Что тени вымысла плоть обретут для нас; Что поплывет судно громадней «Грейт Истерна»; Что.
CONCEPT OF SIX SIGMA Process Variability Cp Total Amount
Essential Question: What are the different ways in which we can describe the velocity of a moving object? Science 7.
A data-driven improvement technique A science An organizational phenomenon A total quality improvement philosophy A management philosophy A problem- solving.
Find reaction time Materials: –Ruler or meter stick –Calculator –Scratch paper or notes –Do multiple trials.
BUSINESS EXCELLENCE MODEL LEADERSHIP PROCESSES RESSOURCES POLICY & STRATEGY PEOPLE MANAGEMENT BUSINESS RESULTS IMPACT ON SOCIETY CUSTOMER SATISFACTION.
MGT 322 Week 3 DQ 2 Production and Quality Tools Check this A+ tutorial guideline at
Introduction to Process Improvement
Summers Six Sigma Copyright ©2007 by Pearson Education, Inc. All rights reserved.
Introduction To Our Online Resources

Balanced and Unbalanced Forces
Top Fire Protection Services Ottawa available on Dubinskyconstruction
Making Tens.
Supply Chain Management
(مفهوم شناسي، سياستها، قوانين و مقررات حاكم بر آن)
(مفهوم شناسي، سياستها، قوانين و مقررات حاكم بر آن)
Balanced and Unbalanced Forces
Introduction to Business Processes and Analysis/Improvement methodologies GEOP 4316.
Kinematics.
ERM Systems.
Chapter 11 Rolling, Torque, and Angular Momentum
Changing Approach to Marketing
Kinematics.
WSH Experts WSH Experts Pte Ltd established in Singapore to provide integrated services to the industry. We provide wide range of services to all the sectors.
5.1 The First Law: Force and Inertia
1 By what factor does the kinetic energy of a car change when its speed is tripled? 1) no change at all 2) factor of 3 3) factor of 6 4) factor of.
VEHICLE TECHNOLOGY BRAKE SYSTEMS.
Represented By:. “Provides Professional Services in Power Supply & Air Conditioning Business” PRESENT AGENDA.
Customer Service April 2019.
Presentation transcript:

A Quick Tune Up of Your Professional Skill Set

Topics World class concepts of tomorrow’s business The new Customer service paradigm Six Sigma quality levels and expectations Supply chain acceleration tactics Lean business processing Employee Empowerment

SD LSL USL   = 1

When Toyota Needed Brakes…

 Set of brakes to stop a 2,200 lb car from 60 mph in 200’ ten times without fading.  The brakes must fit into a 6”x8”x10” space at the end of each axle.

$

A six second decrease in order processing results in a 1% increase in sales

STARsixsigma.com Clyde Parker