Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter 1 TRAINING: 4 W Questionnaire.

Slides:



Advertisements
Similar presentations
EBooks and Audiobooks. This class will give you an overview of eBooks and electronic Audiobooks available from the Library. We will also explain the basic.
Advertisements

NIMAC 2.0: The Accessible Media Producer Portal NIMAC 2.0 for AMPs.
Directorate of Learning Resources Accessing electronic journals from off-campus This causes lots of headaches, but dont despair, heres how to do it! If.
Planning and Preparation Inter-agency Child Protection Working Group & Save the Children Picture: Lindsay Stark Training material developed by: Hani Mansourian.
Welcome to Clienttrack and the World of HMIS
Homeless Assistance in Ohio Changes in the 2012 Consolidated Plan.
The Federal Hiring Process Using USAJOBS & Application Manager
Hiring Reform Implementation
CLUSTER SPECIFIC CASELOAD 5 TARGET GROUPS 1 IDPS IN CAMPS – 20% OF FAMILIES= FAMILIES 2 IDPS OFF CAMPS- 80% OF FAMILIES =
Application Process USAJOBS – Application Manager USA STAFFING ® —OPM’S AUTOMATED HIRING TOOL FOR FEDERAL AGENCIES.
Internet Banking Standard and Standard-Hybrid Registration Intuit Financial Services University Internet Banking Certification Training.
Improving Teacher Quality. Agenda Getting Access to MEGS The Application Submission.
StressChill App Click the StressChill icon (shown to the right) to open the app. If you do not see this on the desktop, you will find it in the pull up.
FSC Information Management Tool - introduction. Training Overview What is the FSC? What is Information Management? Why a FSC IM Tool? FSC Reporting Reporting.
Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter 1 SHELTER CLUSTER DIGITAL PLATFORM.
A GLOBAL CAPITAL CAMPAIGN OF HABITAT FOR HUMANITY INTERNATIONAL 1 5 th CDEMA Conference December 2010 Haiti Earthquake Response: Building Resilience through.
1 The Point in Time Enumeration Process in Washington, D.C. Darlene Mathews The Community Partnership for the Prevention of Homelessness
Shelter Cluster Donors and Heads of Agencies Strategic Meeting 17:00, Nov 21 st, 2013.
South Africa Data Warehouse for PEPFAR Presented by: Michael Ogawa Khulisa Management Services
WORKSHOP OBJECTIVES AND DAY-PLAN Present draft framework and indicators To review these and in particular, to use your technical and contextual knowledge.
Certificate IV in Project Management Course Structure Course Number Qualification Code BSB41507.
Shelter Training 08b – Belgium, 16 th –18 th November, 2008 based on content developed by This workshop discusses implementing a strategy for supporting.
Shelter Cluster Vanuatu Meeting 16 July 2015 PWD Offices, Port-Vila.
Protection Cluster 4W Matrix A Self-Help Guide. 4W Who does What Where When 4W   The 4W Matrix is formally known as the “Activity Tracking Matrix” 
Year 1 Semester 2 E*Value Training for Students (Training 2) WASHINGTON STATE UNIVERSITY COLLEGE OF NURSING | GRADUATE PROGRAMS (Click to advance to next.
Day 1 Shelter Meeting 09a is hosted by Swiss Solidarity 08:30 – 09:00 09:00 – 09:15 09:15 – 09:30 09:30 – 10:30 10:30 – 10:50 10:50 – 11:00 11:00 – 11:30.
Certificate IV in Project Management Certificate IV in Project Management Course Structure Course Number Qualification Code BSB41507.
Day 1 09:00 – 09:30 09:30 – 09:45 09:45 – 10:00 10:00 – 10:30 10:30 – 11:00 11:00 – 11:30 11:30 – 12:00 12:00 – 12:30 12:30 – 13:00 13:00 – 14:00 14:00.
Shelter Cluster Coordinating humanitarian shelter Update from the Global Shelter Cluster Shelter Centre meeting Geneva, 25 May 2012.
Shelter Meeting 09a, Geneva Topic:Urban Displaced Objectives:to know about 1) the status quo of current initiatives 2) the project “guidelines.
Shelter Meeting 09b is hosted by UNHCR Shelter After Disaster: update Shelter After Disaster: transitional settlement and reconstruction Shelter After.
Mario C. Flores Director, Disaster Response Field Operations Habitat for Humanity International Shelter Meeting 10b Palais des Nations, Geneva 2-3 December.
Thursday 2 December 2010Shelter meeting 10b is hosted by OCHA Transitional Shelter Guidelines Tom Corsellis: Shelter Centre.
Emergency Shelter and Housing Assistance Program Data Requirements 12/3/2015.
Tanna Shelter Cluster meeting 25 th May CLUSTER OBJECTIVE 1: Provide emergency shelter and non-food items for people whose houses have been partially.
FSC Information Management Tool. Agenda What is the FSC? What is Information Management? FSC IM Tool How partners use the tool How Information Manager.
Survey Training Pack Session 3 – Questionnaire Design.
Page ADP PearsonAccess Proctor Training. Page Agenda Test Overview Testing Components Proctor Roles and Responsibilities Overview Administering the Test.
NIMAC for Accessible Media Producers: February 2013 NIMAC 2.0 for AMPs.
How to complete and submit a Final Report through Mobility Tool+ Technical guidelines Authentication, Completion and Submission 1 Antonia Gogaki IT Officer.
1 Logging into the new PCard (PaymentNet) System: PAYMENTNET * Introduction * May use IE 8.0 or greater or Firefox * Do not.
Copyright © 2010 Pearson Education, Inc. or its affiliate(s). All rights reserved.1 | Assessment & Information 1 Online Testing Administrator Training.
HUMANITARIAN RESPONSE MONITORING SYSTEM. Humanitarian Response Monitoring System Components  Transport and Logistics cluster  Emergency Food and Nutrition.
CACI Proprietary Information | Date 1 PD² v4.2 Increment 2 SR13 and FPDS Engine v3.5 Database Upgrade Name: Semarria Rosemond Title: Systems Analyst, Lead.
HIRING REFORM – HOW TO APPLY TO USAJOBS WHAT APPLICANTS NEED TO KNOW 1.
CARE in Emergency Shelter and Reconstruction. 1. What is Our commitment to Shelter? 2. What impact does Shelter have? 3. What are the programming options.
Saving lives, changing minds. Emergency Appeal IFRC Drought response 2013 NZ Red Cross Pacific Satellite Communications Remote Communications.
How to complete and submit a Final Report through
Sustainable Shelter Solutions
Nigeria Factsheet–April 2017
Shelter Working Group Meeting Monday 16 June, 10AM
Shelter Working Group Meeting Thursday 6 July, 10AM
INVESTING IN SYRIAN HUMANITARIAN ACTION (ISHA)
Sub-National Shelter & NFI Cluster Coordination meeting for C &S
Sub-National Shelter & NFI Cluster Coordination meeting for KRI
USAJOBS – Application Manager
Incident Management: Recording New Incidents User Guide
Mobile Data collection
Iraq Assessment Working Group Rapid Needs Assessment
Featuring: Whitney Bright, Goodwill Central Texas
Agenda Review of action points from previous meeting minutes (5mn);
Humanitarian Coordination Forum Date: 29 June 2017 GAROWE Shelter and NFI cluster Abdihakim Mohamed Shelter/NFI Cluster coordinator.
Agenda Review of action points from previous meeting
Cash for construction materials
BIG LAUNCH! Urban Assistance Guidelines Shelter Meeting 10a May 2010
148 Transitional shelter This workshop discusses when to use transitional shelter, the common circumstances for using it, and its strengths, characteristics.
133 Implementing settlement programmes
Featuring: Whitney Bright, Goodwill Central Texas
How can DTM Multi-Sectoral Location Assessment be useful for Partners?
Presentation transcript:

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter 1 TRAINING: 4 W Questionnaire

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter 2 Agenda 1.Introduction 2.The technology 3.The Mobile Application for the 4 W Questionnaire 4.Reporting frequency 5.How many uploads per project 6.Review of questions > Step by Step 7.Good and bad pictures 8.Tips

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter 3 Objective of the training: You will learn What is the 4W questionnaire How to use the phone for data collection What information is needed for reporting The questions and how to answer effectively How to connect to WIFI and access the application How this information is to be used 1. Introduction

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter 4 1. Introduction What is the 4W Questionnaire?

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter 5 What is the 4W Questionnaire? 4W WHO is doing WHAT activity WHEN and WHERE The questionnaire is a simple project reporting tool that helps to identify and compare gaps. 1. Introduction

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter 6 1. General background: 4W Information is gathered using mobile phones programmed with the questions. The questionnaire has been developed by the Shelter Cluster, it is the IMPROVED version, based on existing reporting format Mobile data collection adds credibility by linking the information with a location (pictures, GPS and visual findings).

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter 7 2. The Technology 1. The questionnaire 3. Practical data collection Components of the 4W include: 2. The mobile phone programmed with the questionnaire 4. The digital platform

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter 8 2. The Technology The digital platform records project by location

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter 9 2. The Technology The digital platform records implementing agency activity

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter 10 The digital platform provides a map of projects 2. The Technology

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter 11 The digital platform analyses the project report information 2. The Technology

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Mobile application for the 4W The mobile application is very user friendly. The whole 4W exercise is located in the ‘4W’ questionnaire. You click on the questionnaire and the first thing it will do is allow you to capture the exact location through a GPS point (longitude, latitude). -> This allows for information to be gathered quickly -> It ties all information to a GPS point insuring it is accurate -> Adds credibility to Shelter Cluster reporting. After the GPS point, follow the questions and answer to the best of your ability and knowledge.

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Reporting frequency Monthly reporting: Monthly reporting on the FIRST DAY (1 st ) of each month to report: 1. The previous month activities for Shelter implementation (Transitional and Permanent) 2. NFI report on status of current NFI and Emergency Shelter Kit stocks Arrange to visit the field of implementing agencies once a month to capture their activity. Ad-hoc reporting: NFI distribution activity should be reported on the day of distribution. It is ideal to visit on the day of distribution to record the activity (see guidance on how to take a good photograph) Alternatively: if you cannot be at the distribution on the day, remote report can be submitted.

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter 5. How many uploads per project? It depends on the components of a project: It must be split by Location, Donor, and Activity. For example, if in a contract it says Emergency Shelter for 200 HH and NFI for 300 HH in one location, then you have to split it into two entries (records) because it is two activities.

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter 5. How many uploads per project? Example: DRC is implementing shelter and NFI projects in two locations. They are NFI, Permanent Shelter and Transitional Shelter, funded by CHF, ECHO and DFID. LocationDonorActivity Location 1CHF ECHO LocationDonorActivity Location 2CHF DFID

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter LocationDonorActivity Location 1CHF ECHO LocationDonorActivity Location 2CHF DFID 5. How many uploads per project? Example: DRC is implementing shelter/NFI projects in two locations. They are NFI, Permanent Shelter and Transitional Shelter, funded by CHF, ECHO and DFID. 1: NFI, CHF, Location 1 2: PS, CHF, Location 1 3: TS, ECHO, Location 1 4: NFI, ECHO, Location 1 5: NFI, CHF, Location 2 6: PS, ECHO, Location 2 7: NFI, ECHO, Location 2

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter 17 The following topics have been made available:  Type of assistance: NFI kit / Emergency- / Transitional- / Permanent –Shelter  Size of the project  Location  Reason for displacement (insecurity, natural disaster, etc.)  Who implemented project  Technical specifics of shelter type The questions use skip logic depending on the choice that you make. i.e. some questions are ‘skipped’ or omitted. After having made a choice, you will only receive specific information regarding that choice. 6. Review of Questionnaire

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Skip logic illustrated 18 Project details Size of project (number of Households) Status of project Location & GPS Reason for intervention Photographs Donor Who implemented Type of AssistanceNFIEmergency ShelterTransitional ShelterPermanent Shelter (depending on the status of the project) Kit / package contentsTechnical solution (construction) ProcurementProcurement & Materials Cost of kit & contentsCost of materials & labour Disaster Risk reduction. i.e. build safer Settlement planning & services Housing, land & property. i.e. tenure Size of shelter & plot Lifespan Labour method Security

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Step by Step Everything in the 4W is linked to a Geographical location. There should be a record for each project per agency, even if in the same settlement. 19 GPS

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Basic project information Type of activity? (select one) NFI Emergency Shelter Transitional Shelter Permanent Shelter This is the main category question for the 4W and will define WHAT information you will be asked

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Basic project information NFI Kit Emergency Shelter

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Basic project information Reason for intervention (select one) NFI Kit Emergency Shelter

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Status of activity: to determine cluster stocks Basic project information NFI Kit Emergency Shelter

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Status of activity: Basic project information NFI Kit Emergency Shelter

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Step by Step 25 Reporting location Ideally you will capture the project in the field to verify on site. However, if you don’t have access, you can do it remotely by calling partners and going through the questionnaire with them while you use the mobile application. NFI Kit Emergency Shelter

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Step by Step Date of report: 26 YearMonth Monthly reporting: Date of report must be on the first day of each month reporting on the activities of the preceding month. i.e. report date 1 st February will report on activities during January, and capture status of activity and warehouse / stock on the last day of January. OR AD-HOC: reporting for an NFI / ESK distribution. NFI Kit Emergency Shelter

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Donor and agencies involved Who is the direct donor? Is UN involved? Who is the agency reporting this activity Do they have an implementing partner? Step by Step Usually you can find this in contracts, however if it is difficult to find you can skip this question NFI Kit Emergency Shelter

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Step by Step How many households are you targetting? For monthly NFI and Emergency Shelter Kit report: Provide the number of kits in the project. For ad-hoc reporting on NFI and Emergency Shelter distributed: Provide the number of kits that have been distributed. 28 NFI Kit Emergency Shelter

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Step by Step What is the type of the NFI kit? 29 For EAP and separate items, you will be asked more questions from a dropdown menu, please check each item you see in the kit. You can check this information in proposals. NFI Kit

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Step by Step What is the kit content of the Emergency Shelter? 30 There is a list in a dropdown menu, please check each item you see in the kit. You can check this information in proposals. Emergency Shelter

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Step by Step Procurement How were the kits items / materials procured? 31 There is a list in a dropdown menu, please select procurement details that most suits the project The same options are provided for NFI and ESK kits, and shelters NFI Kit Emergency Shelter

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Step by Step Cost What was the value of the kit? 32 NFI Kit Emergency Shelter

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Step by Step Distribution method How were the NFI / Emergency Shelter kits distributed? 33 Please select distribution method that most suits the project NFI Kit Emergency Shelter

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Step by Step Distribution speed What was the time delay between the emergency, and the distribution of kits? 34 This information is required to track the timeliness of the cluster response within the challenging context. NFI Kit Emergency Shelter

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Step by Step Take a photo (maximum 3) It is ideal if the RSCC can be present on distribution day. Then you can monitor the activity, do the 4W on that day, take a picture of the NFI kit and of how people are lining up. 35 NFI Kit Emergency Shelter Tip: Photos of Distribution for NFI / ESK Waiting area and queue Distribution area Beneficiaries receiving items

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Basic project information Transitional Shelter Permanent shelter

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Basic project information Reason for intervention (select one) Transitional Shelter Permanent shelter

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Status of activity: If on-going: You will be prompted to answer project details related to materials, procurement, site planning and site services Basic project information Transitional Shelter Permanent shelter

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter If planned target has been achieved answer “Project Completed”. eg. Planned target was 1000 HH and distribution has taken place to 1000 HH Basic project information Transitional Shelter Permanent shelter Status of activity:

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter If a project for some reason will not happen again, thus the agency will relocate funds elsewhere, change location, change content etc.. Answer “Stop”. Basic project information Status of activity: Transitional Shelter Permanent shelter

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Step by Step 41 Reporting location Transitional Shelter Permanent shelter Ideally you will capture the project in the field to verify on site.

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Step by Step 42 Reporting location Transitional Shelter Permanent shelter However, if you don’t have access, you can do it remotely by calling partners and going through the questionnaire with them while you use the mobile application.

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Step by Step Date of report: 43 YearMonth Monthly reporting: Date of report must be on the first day of each month reporting on the activities of the preceding month. i.e. report date 1 st February will report on activities during January, and capture status of activity the last day of January. Transitional Shelter Permanent shelter

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Location of activity: Basic project information Transitional Shelter Permanent shelter

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Donor and agencies involved Who is the direct donor? Is UN involved? Who is the agency reporting this activity Do they have an implementing partner? Step by Step Usually you can find this in contracts, however if it is difficult to find you can skip this question Transitional Shelter Permanent shelter

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Step by Step How many households are you targetting? Provide the households targeted with this project (overall project) 46 you will be asked later: How many households have received shelter to date. Transitional Shelter Permanent shelter

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Step by Step What is the shelter construction typology? 47 There is a list in a dropdown menu, please select the type of construction that most suits the shelter Transitional Shelter

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Step by Step What is the shelter construction typology? 48 There is a list in a dropdown menu, please select the type of construction that most suits the shelter Permanent shelter

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Step by Step Technical Improvements For Disaster Risk Reduction (DRR) Have any structural improvements been integrated into the shelter to reduce the risk during natural disaster or to improve durability? select from the list any that most suits the project. Check with the program officer or project manager to confirm these details. Transitional Shelter Permanent shelter

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Step by Step Number of Households received Shelter How many units were completed by the time of your report. This is provided as a cumulative amount Example: 4 month project targeting 300 HH for Transitional Shelter. JanuaryFebruaryMarchApril 50 completed100 completed200 completed300 completed Project ‘ongoing’ Transitional Shelter Permanent shelter

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Step by Step Settlement Services Have any services been planned in the settlement? There is a list in a dropdown menu, please select any that apply that most suits the project. Check with the program officer or project manager to confirm these details. Transitional Shelter Permanent shelter

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Step by Step Site Planning Has the settlement been planned by site planner to include spacing considerations for fire, etc.? Transitional Shelter Permanent shelter Are there any fire-breaks in the settlement? Has the community been trained in fire prevention and DRR?

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Step by Step Housing Land and Property Has tenure and security of land agreement been included? Check with the program officer or project manager to confirm these details. What was the HLP activity? Transitional Shelter Permanent shelter

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Step by Step Housing Land and Property Assess improvement of the tenure security before and after the project. Check with the program officer or project manager to confirm these details. Transitional Shelter Permanent shelter

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Step by Step Housing Land and Property Has the land tenure situation changed during the project Check with the program officer or project manager to confirm these details. Transitional Shelter Permanent shelter

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Step by Step Shelter Lifespan What is the anticipated lifespan of the shelter in years? Check with the program officer or project manager to confirm these details. Transitional Shelter Permanent shelter

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Step by Step Shelter Construction Labour Details What was the labour method used? Check with the program officer or project manager to confirm these details. Transitional Shelter Permanent shelter

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Step by Step Procurement How were the materials purchased? 58 Transitional Shelter Permanent shelter

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Step by Step Shelter Materials How were materials provided to beneficiary? Check with the program officer or project manager to confirm these details. What materials were used? (maximum 3) Transitional Shelter Permanent shelter

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Step by Step Shelter details Size of shelter ‘before’ applies to improved shelters, or the type of shelter beneficiaries were living in prior to the project, if known. Transitional Shelter Permanent shelter

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Step by Step Shelter details Size of plot Transitional Shelter Permanent shelter

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Step by Step Shelter costs Provide details if known of the costs, split for labour, materials, and total costs. (in USD) Transitional Shelter Permanent shelter Check with the program officer or project manager to confirm these details.

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Step by Step Shelter details Security Is the shelter lockable (provided with a latch, padlock fitting?) Is a lock provided? Transitional Shelter Permanent shelter Check with the program officer or project manager to confirm these details.

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter 64 Tip: Photos of Transitional Shelter / Permanent Shelter Whole shelter (outside) Area or plot around Inside shelter or a detail (e.g. Lock, door) Step by Step Transitional Shelter Permanent shelter Tip: Hold your mobile phone upright, make sure the whole structure is captured in the photo. Take a photo (maximum 3) If there was a fire outbreak just before your visit you can even take this picture.

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Good and bad pictures Shows the structure and the context Shows only part of the structure and no context

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Good and bad pictures Shows the full structure and the context Shows only part of the structure and no context

Global Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Tips before going to the field Make sure you have a log in code Make sure you are logged in with this phone on the MFIELDWORK application before leaving the WIFI area. It is necessary to be logged in when in the field. Make sure the latest versions of all the questionnaires have been downloaded. Make sure that the GPS is functional on all the phones. Try this out at the office. Make sure all the phones are properly charged. Make sure that wifi is turned OFF while in the field to save the phone’s battery.