The Monitoring Problem Firmware for the Lost Synchronization Detection Project Type: MC-IAPP Industry Academia Partnerships and Pathways Project Name:

Slides:



Advertisements
Similar presentations
Lecture #24 Page 1 EE 367 – Logic Design Lecture #24 Agenda 1.State Machines Review Announcements 1.n/a.
Advertisements

01/11/2002SNS Software Final Design Review1 V123S Event Link Encoder, Transmission System and PLL Receiver Thomas M. Kerner (BNL) SNS Global Controls.
Sumitha Ajith Saicharan Bandarupalli Mahesh Borgaonkar.
Prometeo Workshop (Valencia) November 17-18, 2011 A. Boujrad NUMEXO2 Mother Board Design Status Exogam Collaboration Abderrahman BOUJRAD GANIL France.
6/12/20151 Sequence Detectors Lecture Notes – Lab 4 Sequence detection is the act of recognizing a predefined series of inputs A sequence detector is a.
DSP online algorithms for the ATLAS TileCal Read Out Drivers Cristobal Cuenca Almenar IFIC (University of Valencia-CSIC)
FTK poster F. Crescioli Alberto Annovi
FF-LYNX R. Castaldi, G. Magazzù, P. G. Verdini INFN – Sezione di Pisa G. Bianchi, L. Fanucci, S. Saponara, C. Tongiani Dipartimento di Ingegneria della.
Author Wayne M. Koski EVLA Monitor & Control Software PDR May 14 & 15, EVLA Monitor and Control Module Interface Board (MIB) Design.
SVT workshop October 27, 1998 XTF HB AM Stefano Belforte - INFN Pisa1 COMMON RULES ON OPERATION MODES RUN MODE: the board does what is needed to make SVT.
U N C L A S S I F I E D FVTX Detector Readout Concept S. Butsyk For LANL P-25 group.
NEDA collaboration meeting at IFIC Valencia, 3rd-5th November 2010 M. Tripon EXOGAM2 project Digital instrumentation of the EXOGAM detector EXOGAM2 - Overview.
FF-LYNX (*): Fast and Flexible protocols and interfaces for data transmission and distribution of clock, trigger and control signals (*) project funded.
LANL FEM design proposal S. Butsyk For LANL P-25 group.
11th March 2008AIDA FEE Report1 AIDA Front end electronics Report February 2008.
FTK AM boards Design Review P. Luciano, N. Biesuz, W. Billereau, J.M. Combe, S. Citraro, D. Dimas, S. Donati, C. Gentsos, P. Giannetti, K. Kordas, A. Lanza,
Fullbeam DAQ board on PET system Eleftheria Kostara (INFN of Pisa, University of Siena ) Supervisors: F. Palla, M.G. Bisogni (University of Pisa) Technical.
The L0 Calorimeter Trigger U. Marconi On behalf of the Bologna Group CSN1, Catania 16/9/02.
1 Control Unit Operation and Microprogramming Chap 16 & 17 of CO&A Dr. Farag.
28/03/2003Julie PRAST, LAPP CNRS, FRANCE 1 The ATLAS Liquid Argon Calorimeters ReadOut Drivers A 600 MHz TMS320C6414 DSPs based design.
PSI - 11 Feb The Trigger System of the MEG Experiment Marco Grassi INFN - Pisa On behalf of D. Nicolò F. Morsani S. Galeotti.
PROGRESS ON ENERGY SUM ELECTRONIC BOARD. VXS Backplane Energy Sum 18 fADC VME64 High Speed Serial VME64 16 CH Detector Signals Crate Sum to Trigger Energy.
FPGA firmware of DC5 FEE. Outline List of issue Data loss issue Command error issue (DCM to FEM) Command lost issue (PC with USB connection to GANDALF)
12GeV Trigger Workshop Christopher Newport University 8 July 2009 R. Chris Cuevas Welcome! Workshop goals: 1.Review  Trigger requirements  Present hardware.
Instrumentation DepartmentCCLRC Rutherford Appleton Laboratory Clocks Data FEDv1 Final Firmware Subtasks Serial Comms VME LINK VME Bus VME SystemACE System.
Transfering Trigger Data to USA15 V. Polychonakos, BNL.
Sept. 7, 2004Silicon VTX Workshop - Brookhaven National Laboratory, Long Island, New York Prototype Design of the Front End Module (FEM) for the Silicon.
2001/02/16TGC off-detector PDR1 Sector Logic Status Report Design Prototype-(-1) Prototype-0 Schedule.
FVTX Electronics (WBS 1.5.2, 1.5.3) Sergey Butsyk University of New Mexico Sergey Butsyk DOE FVTX review
Amsterdam, Oct A. Cotta Ramusino, INFN Ferrara 1 EUDRB: status report and plans for interfacing to the IPHC’s M26 Summary: EUDRB developments.
S.Anvar, V.Gautard, H.Le Provost, F.Louis, K.Menager, Y.Moudden, B.Vallage, E.Zonca, on behalf of the KM3NeT consortium 1 IRFU/SEDI-CEA Saclay F
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
ESDG Mtg 15th April CMS-FED Production FEDv1 Productions Jan 2003 : 2 boards. Working. June 2003 : 3.
Project number: Andreas Sakellariou – PRISMA ELECTRONICS 1 st EU Mid-Term Review meeting 7 November 2014.
Summary of Deliverables & reached Milestones History and explanation of steps Milestones this year Deliverables: who is going to write what Done & to be.
Electronic System Design GroupInstrumentation DepartmentRob Halsall et al.Rutherford Appleton Laboratory18 July 2001 CMS Tracker FED CMS Tracker Two Weekly.
Status and Plans for Xilinx Development
Firmware and Software for the PPM DU S. Anvar, H. Le Provost, Y.Moudden, F. Louis, E.Zonca – CEA Saclay IRFU – Amsterdam/NIKHEF, 2011 March 30.
Calliope-Louisa Sotiropoulou FTK: E RROR D ETECTION AND M ONITORING Aristotle University of Thessaloniki FTK WORKSHOP, ALEXANDROUPOLI: 10/03/2014.
IAPP - FTK workshop – Pisa march, 2013 Marco Piendibene – University of Pisa & INFN FTK and the AM system.
SPIRAL2 Andrea Triossi INFN - LNL Gaspard – Hyde – Trace Workshop October , Padova.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
The ALICE Data-Acquisition Read-out Receiver Card C. Soós et al. (for the ALICE collaboration) LECC September 2004, Boston.
GUIDO VOLPI – UNIVERSITY DI PISA FTK-IAPP Mid-Term Review 07/10/ Brussels.
Alberto Stabile 1. Overview This presentation describes status of the research and development of main boards for the FTK project. We are working for.
The AMchip on the AMBoard Saverio Citraro PhD Student University of Pisa & I.N.F.N. Pisa.
Straw readout status Run 2016 Cover FW SRB FW.
Firmware development for the AM Board
IAPP - FTK workshop – Pisa march, 2013
The Associative Memory – AM = Bingo
LAMB: Hardware & Firmware
Production Firmware - status Components TOTFED - status
Summary of Deliverables & reached Milestones
OLD LOGIC AMBSlim5.
An online silicon detector tracker for the ATLAS upgrade
* Initialization (power-up, run)
2018/6/15 The Fast Tracker Real Time Processor and Its Impact on the Muon Isolation, Tau & b-Jet Online Selections at ATLAS Francesco Crescioli1 1University.
Pending technical issues and plans to address and solve
Christophe Beigbeder PID meeting
DCH FEE 28 chs DCH prototype FEE &
Optical data transmission for
Early Stage Researcher: Panos Neroutsos
Vertex 2005 November 7-11, 2005 Chuzenji Lake, Nikko, Japan
Annovi, M. Beretta, P. Laurelli, G. Maccarrone, A. Sansoni
8-layer PC Board, 2 Ball-Grid Array FPGA’s, 718 Components/Board
Analog-to-Digital Converters
Test Bench for Serdes Radiation Qualification
KICK OFF meeting - project presentation
Multi Chip Module (MCM) The ALICE Silicon Pixel Detector (SPD)
Fixed Latency Serial Links with FPGA-embedded SerDes for SuperB
Presentation transcript:

The Monitoring Problem Firmware for the Lost Synchronization Detection Project Type: MC-IAPP Industry Academia Partnerships and Pathways Project Name: Fast Tracker for Hadron Collider Experiments (FTK) Project Code: Project Type: MC-IAPP Industry Academia Partnerships and Pathways Project Name: Fast Tracker for Hadron Collider Experiments (FTK) Project Code: Dimas Dimitrios 1 st EU Mid-Term Review Meeting 7 November 2014

Scope of Work Work on WP1: Prototype Construction & Production Validation Firmware design for the AMB SLP Board Project:Event:Date:PlacePresenterConfidential FTKMidterm Review07/11/2014BrusselsDimas DimitriosSlide 1 Project Type: MC-IAPP Industry Academia Partnerships and Pathways Project Name: Fast Tracker for Hadron Collider Experiments (FTK) Project Code: Project Type: MC-IAPP Industry Academia Partnerships and Pathways Project Name: Fast Tracker for Hadron Collider Experiments (FTK) Project Code:

The AMBoard Project:Event:Date:PlacePresenterConfidential FTKMidterm Review07/11/2014BrusselsDimas DimitriosSlide 2 Project Type: MC-IAPP Industry Academia Partnerships and Pathways Project Name: Fast Tracker for Hadron Collider Experiments (FTK) Project Code: Project Type: MC-IAPP Industry Academia Partnerships and Pathways Project Name: Fast Tracker for Hadron Collider Experiments (FTK) Project Code:

Scope of Work Data from all detector layers must be synchronized in order to be for the same event (same collision) Need of Monitoring Module for detection of Loss of Synchronization Project:Event:Date:PlacePresenterConfidential FTKMidterm Review07/11/2014BrusselsDimas DimitriosSlide 3 Project Type: MC-IAPP Industry Academia Partnerships and Pathways Project Name: Fast Tracker for Hadron Collider Experiments (FTK) Project Code: Project Type: MC-IAPP Industry Academia Partnerships and Pathways Project Name: Fast Tracker for Hadron Collider Experiments (FTK) Project Code: Hit Bus0 Hit Bus2 Hit Bus9 Hit Bus10 Hit Bus11 Hit Bus1 FIFO Dual Clock GTP RX Module Data Processing & Monitoring GTP TX Module FIFO Dual Clock HIT_BUS SYSTEM_CLO CK RX_GTP_CL OCK TX_GTP_CLO CK Paralleliz ed Data FIFO VME

Loss of Sync Module Design Specs Events every 10μs (100KHz) Data input from 12 buses 16-bit words in each bus Comparison of all the End Event words with the End Event Reference word The End Event reference word is the word of the first bus (bus no 0) Project:Event:Date:PlacePresenterConfidential FTKMidterm Review07/11/2014BrusselsDimas DimitriosSlide 4 Project Type: MC-IAPP Industry Academia Partnerships and Pathways Project Name: Fast Tracker for Hadron Collider Experiments (FTK) Project Code: Project Type: MC-IAPP Industry Academia Partnerships and Pathways Project Name: Fast Tracker for Hadron Collider Experiments (FTK) Project Code: End Event Words Hit Bus0 Hit Bus2 Hit Bus9 Hit Bus10 Hit Bus11 Hit Bus1

Loss of Sync Module Block Diagram Project:Event:Date:PlacePresenterConfidential FTKMidterm Review07/11/2014BrusselsDimas DimitriosSlide 5 Project Type: MC-IAPP Industry Academia Partnerships and Pathways Project Name: Fast Tracker for Hadron Collider Experiments (FTK) Project Code: Project Type: MC-IAPP Industry Academia Partnerships and Pathways Project Name: Fast Tracker for Hadron Collider Experiments (FTK) Project Code: Hit Bus 16 Hit Bus 16 Hit Bus 16 Hit Bus 16 clk init init_ev ee_flag_cc current_state_status EndEventRef HBSErrors ee_comp_rslt ee_error_flag ee_flag ee_error_flag_reg HBS0_LoS_Counter HBS11_LoS_Counter clk init init_event_control Output Signals Error Counter for each bus Error Flag 12-bit Loss of Sync corresponding to each bus

Trainings Summer School Pisa. “VHDL Design” Training at CAEN on July 2013 June Training on Embedded Systems (EDK & SDK of AUTH The Serial Link Processor for the Fast TracKer (FTK) processor at TIPP2014 (International Conference on Technology and Instrumentation in particle Physics), Amsterdam Authors: P. Luciano, A. Annovi, A. Andreani, et al Project:Event:Date:PlacePresenterConfidential FTKMidterm Review07/11/2014BrusselsDimas DimitriosSlide 6 Project Type: MC-IAPP Industry Academia Partnerships and Pathways Project Name: Fast Tracker for Hadron Collider Experiments (FTK) Project Code: Project Type: MC-IAPP Industry Academia Partnerships and Pathways Project Name: Fast Tracker for Hadron Collider Experiments (FTK) Project Code: Publications

The collaboration with the people at INFN in Pisa & at Physics Dpt in AUTH during the two secondments was more than fruitful Trainings on VHDL design & on Embedded Systems, as well as my work on the HIT chip development was a perfect opportunity to boost up my Embedded Systems design knowledge & experience. Great chance to widen my business network, both in academia and private sector. Project:Event:Date:PlacePresenterConfidential FTKMidterm Review07/11/2014BrusselsDimas DimitriosSlide 7 Project Type: MC-IAPP Industry Academia Partnerships and Pathways Project Name: Fast Tracker for Hadron Collider Experiments (FTK) Project Code: Project Type: MC-IAPP Industry Academia Partnerships and Pathways Project Name: Fast Tracker for Hadron Collider Experiments (FTK) Project Code: Current Task (2 nd secondment) Conclusions The co-development of the freeze logic for the Spy Buffers (more details on next presentation)

Thank you for the Attention!!! Project:Εκδήλωση:Date:PlacePresenterConfidential FTKMidterm Review07/11/2014BrusselsDimas DimitriosSlide 8 Project Type: MC-IAPP Industry Academia Partnerships and Pathways Project Name: Fast Tracker for Hadron Collider Experiments (FTK) Project Code: Project Type: MC-IAPP Industry Academia Partnerships and Pathways Project Name: Fast Tracker for Hadron Collider Experiments (FTK) Project Code: