Progress with High Bandwidth Transverse Feedback CERN - May 2015 Reported by W. Hofle.

Slides:



Advertisements
Similar presentations
ATF2: Status Update Glenn Christian (on behalf of FONT group) 10 th ATF Project Meeting.
Advertisements

Testing and Development of Feed-Forward System for ATF2 A. Kalinin Accelerator Science and Technology Centre, Daresbury Laboratory, UK Fifth ATF2 Project.
Introduction to the High Bandwidth Transverse Feedback W. Hofle on behalf of HBTFB Team Proposed New System vs. Existing Feedback System Brief History.
OPTIONS FOR THE DESIGN OF A NEW PICK-UP AND SCHEDULE G. Kotzian, LIU-SPS High Bandwidth Damper Review, July 30, 2013.
Front-end amplifiers for the beam phase loops in the CERN PS Alessandro Meoli (CERN BE/RF/FB) Supervised by Heiko Damerau 21 April CERN.
A.Blas AB/RF/FB APC meeting 20/4/ Status of the PS TFB Upgrade launched in July 2005 L. Arnaudon, A. Blas, F. Caspers, D. Glenat, R. Louwerse, V.
POTENTIAL OF THE WIDEBAND TRANSVERSE DAMPER G. Kotzian on behalf of HBTFB team G. Kotzian, LIU-2013, April 12, 2013.
Particle Studio simulations of the resistive wall impedance of copper cylindrical and rectangular beam pipes C. Zannini E. Metral, G. Rumolo, B. Salvant.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
Lecture 6.
Summary of visit to BNL and LARP workshop High Bandwidth Feedback perspective Preliminary Report by W. Hofle
F. Caspers, S. Federmann, E. Mahner SPSU meeting, 27 th October 2009.
Impedance aspects of Crab cavities R. Calaga, N. Mounet, B. Salvant, E. Shaposhnikova Many thanks to F. Galleazzi, E. Metral, A. Mc Pherson, C. Zannini.
Few slides from J. Fox’ talk in last November’s LARP meeting LARP CM
BEPCII Transverse Feedback System Yue Junhui IHEP , Beijing Sep 17 th, 08IMAC.
LLRF Cavity Simulation for SPL
Beam observation and Introduction to Collective Beam Instabilities Observation of collective beam instability Collective modes Wake fields and coupling.
Status of the PSB impedance model C. Zannini and G. Rumolo Thanks to: E. Benedetto, N. Biancacci, E. Métral, N. Mounet, T. Rijoff, B. Salvant.
Status of the SPS impedance model C. Zannini, G. Rumolo, B. Salvant Acknowledgments: H. Bartosik, O.Berrig, G. Iadarola, E. Métral, N. Mounet, V.G. Vaccaro,
Updated status of the PSB impedance model C. Zannini and G. Rumolo Thanks to: E. Benedetto, N. Biancacci, E. Métral, B. Mikulec, N. Mounet, T. Rijoff,
Update of the SPS transverse impedance model C. Zannini, G. Rumolo, B. Salvant Acknowledgments: H. Bartosik, O.Berrig, F. Caspers, E. Chapochnikova, G.
Elias Métral, LHC Beam Commissioning Working Group meeting, 08/06/2010 /191 SINGLE-BUNCH INSTABILITY STUDIES IN THE LHC AT 3.5 TeV/c Elias Métral, N. Mounet.
Summary of Booster Dampers Systems Dave McGinnis December 7, 2010.
Lecture 5.
Wolfgang Hofle BE/RFSPS Studies WG - November 17, 20091/23 reported by Wolfgang Hofle CERN BE/RF/FB Transverse feedback to cure electron-cloud induced.
P.W. Gorham et al.. TEST BEAM A SLAC Time relative to beam entry Antenna V/V rms Time relative to beam entry Antenna V/V rms close to shower maximumshower.
The Quadrupole Pick-up in the CPS -intro and progress report PPC 3 Dec 1999 A. Jansson.
High Bandwidth damper Input from W.Hölfe Acknowledgement to all collaborators at SLAC, INFN, LBNL and CERNL Presentation of recent MD results (J.Cesaratto):
Chromaticity dependence of the vertical effective impedance in the PS Chromaticity dependence of the vertical effective impedance in the PS S. Persichelli.
BEPCII Transverse Feedback System Yue Junhui Beam Instrumentation Group IHEP , Beijing.
A.Blas APC meeting 12/5/ Status of the PS TFB Project triggered by: K. Schindl and R. Cappi Hardware: J. Belleman (PU amplifiers) T. Bohl, W. Hofle,
Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) Dec.
Elias Métral, ICFA-HB2004, Bensheim, Germany, 18-22/10/ E. Métral TRANSVERSE MODE-COUPLING INSTABILITY IN THE CERN SUPER PROTON SYNCHROTRON G. Arduini,
Outcome of HBW damper Review of W. Hofle LIU-SPS HBW damper review LIU SPS Coordination,
Elias Métral, SPSU Study Group and Task Force on SPS Upgrade meeting, 25/03/2010 /311 TMCI Intensity Threshold for LHC Bunch(es) in the SPS u Executive.
CLIC workshop 2015 EXTRACTION KICKER STRIPLINE MEASUREMENTS C. Belver-Aguilar (IFIC) On behalf of: A. Faus-Golfe (IFIC), F. Toral (CIEMAT), M.J. Barnes.
A New Stripline BPM Design for the ILC IR Fast Feedback (?!) – For discussion: A metal/ceramic brazed BPM pickup – 9/19/2007ILC IR Engineering Design Workshop,
Main activities and news from the Impedance working group.
NLC - The Next Linear Collider Project Intra-Pulse Feedback at the NLC Interaction Point Steve Smith SLAC Snowmass 2001.
Status of the single-bunch feedback system for the SPS/LHC M. Pivi C. Rivetta, J. Cesaratto, J. Fox, O. Turgut, S. Uemuda, W. Hofle, U. Wehrle, K. Li,
High Bandwidth Damper System: kicker impedance
Phase Feed-Forward Piotr Skowroński (CERN)
Longitudinal impedance of the SPS
Wideband kickers Mechanical design and Fabrication
Updated status of the PSB impedance model
Follow up on SPS transverse impedance
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Longitudinal beam parameters and stability
Proposals for 2015 impedance-related MD requests for PSB and SPS
Horizontal e+ instability Study & Solution
CTF3 kicker activities at CIEMAT
Digitizers in CCR for transverse wide-band pick-ups
F.Marcellini, D.Alesini, A.Ghigo
Benchmarking the SPS transverse impedance model: headtail growth rates
STUDIES OF THE STRIPLINE KICKER FOR BEAM EXTRACTION FROM THE CLIC DRs
Update on PS Longitudinal Impedance Model
Update of CLIC accelerating structure design
Impedance working group update
The SPS 800 MHz RF system E. Shaposhnikova for BE/RF
ATF Fast Kicker R&D at LBNL ILCDR06, Cornell University
CLIC DR EXTRACTION KICKER DESIGN, MANUFACTURE AND EXPERIMENTAL PROGRAM
Limits on damping times
I Alexander Nass for the JEDI collaboration
Simulations and RF Measurements of SPS Beam Position Monitors (BPV and BPH) G. Arduini, C. Boccard, R. Calaga, F. Caspers, A. Grudiev, E. Metral, F. Roncarolo,
Updated status of the PSB impedance model
Status of the EM simulations and modeling of ferrite loaded kickers
CERN-SPS horizontal instability
Multiphysics simulations of impedance effects in accelerators
eSPS Impedance Considerations Aaron Farricker Acknowledgements: T
Impedance of the 2x50 to 100 ohm transformers.
Presentation transcript:

Progress with High Bandwidth Transverse Feedback CERN - May 2015 Reported by W. Hofle

Overview Progress with stripline kickers Progress with slot-line kicker, CERN concentrates on this MD results, December 2014 (old kickers) and April 2015 (new kickers) Closed orbit suppression, improved phase compensation electronics work at CERN in collaboration with LARP team (new fellow started, students from LARP) Control with Q20, slow advance. MD work concentrated on single bunch and Q26 as the first (and easier) step H. Bartosik and B. Salvant reproducing “real” TMCI unstable beam  fast instability ! US LARP meeting ongoing  will present more results at LIU at a later stage; positive feedback, funding by LARP until 2016 review

Kicker designs Tests before LS1 with exponential stripline, i.e. existing pick-up used as kicker  bandwidth limited to 200 MHz The two new kicker designs: 1 GHz bandwidth LARP (SLAC, LBNL), INFN, CERN electromagnetic design needs completion  mechanical design can commence Slot-line (“Faltin” type) Strip-line Electromagnetic design completed (S. De Santis) Mechanical design at CERN (BE-RF-PM) Fabrication under supervision of BE-RF-PM Installation of two kickers completed in LS1, one spare, one kicker equipped with 2x 250 W amplifiers J. Cesaratto see J. Cesaratto et al. (2013) CERN ACC-Note SLAC-R-1037

Complementarity of strip and slot-line

Stripline kicker installation in SPS LSS3+ shielded bellows kicker equipped with amplifiers elliptical bellows kicker without amplifiers  observation of beam induced signals possible thermal tests alignment vacuum impedance Insulation (flanges) feed-throughs (up to 2 kW by design) Cables ECR (being updated EDMS ) naming (ADKCV) E. Montesinos, D. Aguilera Murciano, S. Calvo.

Bench Measurements strip-line at CERN 107 Ω 57 Ω π π NWA Δ 50 Ω π π Δ NWA 57 Ω -10 dB 107 Ω 57 Ω π π π π NWA Δ 57 Ω -10 dB NWA Δ Thru Measurement -10 dB S. De Santis

Results of Bench Meaurements Oscillations around 500 and 2 GHz due to imperfect matching of the measuring wires. Also, high order modes propagate above 1.5 GHz. Values are quite close to estimates from CST model. S. De Santis

Strip-line: Shunt impedance Using CST Microwave Studio we can simulate the classical 2-wire method for measuring the kicker shunt impedance. Blue curve is the actual kicker model. Red curve is same length, untapered, striplines. Dotted curve is the theoretical impedance using analytical formulas.

Strip-line kickers as installed completed installation of amplifiers for one strip-line before 2015 start-up selected location with low radiation (below last quadrupole of StraightSection) special monitoring of radiation levels put in place (CERN R2E team)

Time domain amplifier response Visit of R&K at CERN in spring 2015, commissioning of amplifiers Control circuits: U. Wehrle

R&K amplifiers 5 MHz  1 GHz, 250 W Need to re-visit and re-design the overall phase equalizing circuit

R&K amplifiers 5 MHz  1 GHz, 250 W

Phase response cable to new kicker a = b = c = d = fit: length factor with respect to sample length: 7.85 (from comparison with in-situ measurement) length if sample length is m  m; sample length of lab sample taken from Gerd for one way to kicker

Phase response cable to new kicker a = b = c = d =  = ns this term is displayed

Strip-line beam induced signals 780 V 195 V upstream port (load) downstream port (amp) 3.5x10 11 protons bunch – sigma 333 ps Even mode stripline impedance: 74 Ω Stripline ports impedance: 50 Ω C. Zannini, B. Salvant

Measured beam induced signals mV x 20 = - 5 V 300 mV x 141 = 42 V downstream upstream 1.7x10 11 protons/bunch 4  = 2.7 ns attenuation: 800 MHz: 3.8 dB/100 m 400 MHz: 2.4 dB/100 m 200 MHz: 1.65 dB/100 m preliminary U. Wehrle

Slot-line kicker design and fabrication Fixation pins to hold the electrode to the body in order to prevent it from bending & to provide as much as possible thermal transfer to the body, material choices need input from thermal calculations 1180 mm long copper electrode Mechanical design/fabrication: Refined electromagnetic design: see J. Cesaratto et al. (2013) CERN ACC-Note SLAC-R-1037 E. Montesinos, D. Aguilera Murciano S. Calvo. S. Verdu (matching)  see separate talk T. Rogen, R. Calaga (thermal) M. Wendt (time domain) Work in progress design for 2x2 kW amplifier power

Manufacturing considerations for slotline If built all-in-one, on the inner side, sharp edges of the slits are difficult to round off

Slot-line kicker: material choices for supports ItemPorosity Thermal conductivity [W/mC] Maximum operating T [C] Dielectric constant ԐrLoss angle Youngs Modulus [GPa] Aluminum nitride (AIN) x10-4 (1 MHz) Boron Nitride Alumina Vespel (23 C, 1KHz) (1 MHz) PEEK (23 C, 1 KHz) (25 C, 1MHz)4.0 “Blue stone”(3D printing material) Sapphire4111.5/9.3<1 (1 MHz)470 Diamond x MACOR (25 C, 1 KHz)4.7x10-3 (25 C, 1KHz)66.9 Shapal Tan 10 x 10-4 E. Montesinos, D. Aguilera Murciano, S. Calvo.

Model for thermal calculations T. Roggen

Thermal calculations Work in progress assume 700 MHz, 2 kW cw per strip Feed-through critical: more detailed simulation required assumptions on boundary conditions also critical T. Roggen

Matching of slot-line (S. Verdu)

Time domain simulation Shapal spacers Coaxial-to-stripline transition, based on Kyocera RF UHV feedthrough M. Wendt

Time domain (w/o coax to strip transition) Z0Z0 Z 0e Z 0o

MD results December (old kicker) open loop

MD results December (old kicker) closed loop

MD results with new kicker

Q20 controller design

Summary and outlook Stripline kickers ready for use as planned One strip-line equipped with amplifiers already used with beam, permits now MDs with larger bandwidth Second strip-line will be equipped once sure about radiation resistance of power amplifiers for period of demonstrator and frequency response circuits are optimised Slot-line kicker design ongoing, thermal calculations critical for material choices and detailed mechanical design To do: firmware for treating bunch train ! I would like to acknowledge the excellent progress made by the US LARP team and all contributors at CERN as well as at INFN Frascati and KEK for their participation and advice.