Watertown Victory Field Improvements Project Town Council Presentation March 22, 2011.

Slides:



Advertisements
Similar presentations
MOTT STAFF PARTNERSHIPS/COLLABORATIONS Lodging A Tour Operators Parks Legislators Mayors Creative Economy.
Advertisements

Preparing a Curb Ramp Project December 15, Tiers of Project Types Non-Signalized Curb Ramp Reconstruction - Typically utilizing standard plans.
Football Field Maintenance and Management Procedures
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
Needs Assessment & Master Plan. Needs Assessment & Master Plan Results Proposed Plan Costs Needs Safety Issues About Savage Field Environmental Impact.
Grants- As easy as I, 2, 3 You want one, I’ve got one! Here’s what you need to do. Presented by: Beth J. Helterbran, Recreation &
Limited English Proficient Data with Income and Poverty Overlay Massachusetts.
City of Palm Beach Gardens Tennis Center Expansion Project ITB PF.
Town of Tewksbury THE NEXT GREEN COMMUNITY. Funding Opportunities for Tewksbury  The Green Communities Act was Adopted 2008  State Statute Determine.
Sports Complex Proposal GARY ROBERTS AND TRAVIS PALMER.
KINESIOLOGY/ ATHLETICS COMPLEX PALOMAR COLLEGE. Process.
Alliant Energy Field Renovation. September 2005 Work area blocked off Pitching mound is flattened.
Why Baseball? Chance to add to the athletic culture of the school. Attract new student base to the school. Generate a fan base and offer baseball youth.
PINOLE VALLEY HIGH SCHOOL FACILITIES SUBCOMMITTEE MEETING December 13, 2011.
Davis Field Plan Overview Park & Recreation Commission 9/29/
Accessibility.  A building code is a set of rules that specify the minimum acceptable level of safety for buildings. The main purpose of building codes.
SK COMMUNITY TURF FIELD Opportunities for Kids and Community.
SCHEMATIC DESIGN PRESENTATION
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
2014 Bond Issue Projects September 22, On August 5, 2014 the voters of South Lake Schools passed a $25 million bond proposal This PowerPoint will.
Panther Pride Association Softball Field Planning School Board Meeting 9/10/2012.
PRINCE WILLIAM COUNTY PUBLIC SCHOOLS. SCHOOL DIVISION WIDE ENROLLMENT FORECAST CURRENT SCHOOL CAPACITY568 Students FORECAST ENROLLMENTDEFICIT 2007 School.
HURL Field Acquisition Strategy. Field Acquisition Goals H.U.R.L Turf Sports Field (no rainouts – all games guaranteed) Preferred scheduling (leagues,
Gardening Smart! Smart Gardening Using Integrated Pest Management.
Community Competition Complex. Current Game Conditions Center of game field at high school following fall 2006.
PESmith rev 2/12/06 1 Wesleyan University New Turf Field.
Functions, Quality and Selection. Students will: Know the three purposes and functions of turfgrass. Know how to determine turfgrass quality. Know the.
Article 49 - Davis Field Park & Recreation Commission Town Meeting May
PIONEER HIGH SCHOOL WEST STADIUM PHASE 1. EXECUTIVE SUMMARY Erickson Hall (EHCC) was the awarded the Pioneer High School Phase 1 Construction Contract.
Disc Golf Course Proposal Community Park. Description The City of Huber Heights Parks and Recreation Board is proposing the installation of a 9-hole disc.
Wakulla County Recreation Department. Wakulla County Recreation Mission Statement: Wakulla County Recreation Division is committed to giving every child.
Author name here for Edited books chapter 6 Facility Construction 6 chapter.
Capital Project 2016 Members of the Bloomfield Facilities Committee Frank Young – BOE Jim Spelman – BOE Pam Nakoski - BOE (at large) Ian Caspersson – Community.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
CROZET ELEMENTARY SCHOOL SITE IMPROVEMENTS January 14, 2010 Heyward Boyd Architects, PC.
The Stadium Project The Memorial Field at the Institution for Savings Stadium.
(Name of High School). What are our goals? Maintain top quality athletic facilities for students and community. Ensure the highest level of safety for.
Western Carolina University Town Hall Meeting May 6, 2003 Chuck Wooten Vice Chancellor for Administration and Finance.
BOND REFERENDUM PRESENTATION EASTCHESTER SCHOOL DISTRICT Dr. Walter Moran Superintendent of Schools.
Torrance Unified School District Bond Measure Y Bond Measure Z Quarterly Construction Update September 30, 2009.
Mt. Lebanon Field Enhancement Proposal. Presentation Overview Need for field enhancements Proposed project Recommendation.
A presentation of The New Georgian Heights Alternative Elementary School for Columbus City Schools Board of Education 2 February 2010.
DS B OOSTERS A THLETIC C AMPUS C AMPAIGN I NVESTING IN OUR C OMMUNITY ’ S Y OUTH April 2012.
Overseeding TRF 230. Why Overseed Bermuda goes dormant Green color Traffic tolerance Economic reasons.
Green Line Extension Environmental Impact Report Public Scoping Session Somerville High School October 19, 2006.
Pasture Management II Mid-Atlantic Equine Pasture Initiative Dr. Amy Burk University of Maryland.
Team iPad: Ryan Zimmerman Adam Smith Tristan Irish.
TURF QUALITY.
South Greenville Recreation Center and Park Master Plan.
Wastewater Treatment Plant No. 2 Construction Contract City Council Workshop February 9, 2016.
The Greater Boston Housing Crisis: Problem/Solution Metro West Region Professor Barry Bluestone May 2004.
Norris Public School District Outdoor Activity Facility Planning Report August 16, 2012.
Lexington Public Schools FY Budget 2016 Annual Town Meeting – March 28, 2016.
Artificial Turf Vs Natural By Patrick Abbot and Aidan Nelson.
CHAPEL HILL PARKS & RECREATION Comprehensive Parks Plan Chapel Hill Greenways Master Plan.
White Pigeon Community Schools
Phasing and Maintenance Cost/Coverage
Barry Bluestone Center for Urban and Regional Policy (CURP)
Walking and Working Surfaces
Artificial Turf Installation
Barry Bluestone Center for Urban and Regional Policy (CURP)
Cornwall Central School District
2016 FCS Bond Project #5 Franklinton Middle School - Elevator & Toilet Renovation, H/C Exterior Ramp Scope: This project will upgrade the existing middle.
Wildcat/Middle Fields Project Update June 12, 2014
Plant & Facilities Department
MIRACOSTA COMMUNITY COLLEGE DISTRICT
Athletic Facility Improvements Project
Recent Bond Accomplishments
CONVENTIONAL FACILITIES LCLS Office Space Procurement
MAPC Rental Listings Consortium
Presentation transcript:

Watertown Victory Field Improvements Project Town Council Presentation March 22, 2011

Boston Globe Article

Communities Are Considering These Fields Due to Intense Field Demands and Wear From: Increase in demands for field use Limited field space Fields not designed for current uses Increase in hours of use No time to rest fields Early spring & late fall use demands New England weather

Ideal Turf Characteristics for Sports Fields: Resilient – cushion falls, reduce injuries Firm – for good footing Pest and disease free Wear tolerant Dense plant stand Minimum water requirements Low maintenance Allows early spring and late fall play Natural Turf Cannot Meet These Requirements in Municipal Field Setting

“Infill” Artificial Turf as a Sustainable Alternative to Natural Turf Reduces runoff No irrigation No fertilizer No mowing No herbicides or pesticides Lower maintenance No play limits (quantity or time of year) Improved safety Potential for shared use to offset costs Lower cost long term

Cost Comparison Natural vs. Artificial Turf

Infill Artificial Turf Penn State evaluation Panhandle Sports Medicine Institute injury analysis NCAA Injury Surveillance System NFL Health and Safety Survey Conclusion : “Infill artificial turf safer than natural grass”

Synthetic Turf Field Inventory – mile radius # = Communities within the Middlesex League Listed in order of distance from Watertown # Belmont (1) Waltham (5) Newton (1) Cambridge (1) # Arlington (1) Brookline (2) Somerville (2) Medford (2) Weston (1) # Lexington (2) Roxbury (2) Back Bay/Fens (1) Jamaica Plain (1) # Winchester (1) South End (1) Wellesley (2) Charlestown (2) West Roxbury (planning process) Dorchester (1) South Boston (1) Malden (1) # Woburn (1) Lincoln (1) Everett (1) Needham (3) # Melrose (1) # Stoneham (0) Chelsea (1) Concord (1) Sudbury (4) Framingham (1) Natick (planning process) Revere (1) # Burlington (1) Westwood (1) Medfield (1) Milton (1) Quincy (1) Acton-Boxboro (1) Holliston (1) # Reading (2) 70% of towns/cities within 20 mile radius

Why Renovate Now Current poor conditions at Victory Field Field Drainage and condition Unacceptable lighting levels and system not functioning properly Scoreboards have limited or no function Safety related to the existing concrete bleachers Competitive disadvantage for the town’s athletes New facility would provide relief to other natural turf fields in town High percentage of cities/towns (70%) in the area have one or more artificial turf fields and most teams in the Middlesex League have at least one artificial turf field

Data Collection & Analysis

Analysis of Old Concrete Spectator Stands/Storage Structure  Accessibility issues  Stair risers and treads not code compliant  Width of access aisles not code compliant  Would require accessible ramps  height prohibitive  Would require additional handrails and safety railing  New aluminum seating and brackets would be problematic due to condition of existing concrete.

Potential Lighting Improvements

Drainage Analysis and Approach

Proposed Project Elements New infill artificial turf Multi-purpose field (160,000 square feet ) New Field lighting New dugouts, bull pens and batting cages New baseball spectator seating Home and visitor entrance improvements New Site fencing, netting system and support facility improvements Improved site drainage (3) New Scoreboards

Proposed Project

Project Budget Summary CDM Estimate Site preparation and removals$245,000 Artificial turf multi-purpose field$640,000 surfacing (160,000 square feet) Multi-purpose field base and amenities$883,000 elevated grandstand, dugouts, bull pens, batting cage, ball safety system Field drainage system and storm drain$302,000 improvements Field lighting and electrical $500,000 Miscellaneous work – fencing, paving,$305,000 retaining walls etc. Construction contingency $265,000 Total Project$3,140,000

Project Budget Summary March 2011 Bid Price Site Improvements Site preparation and removals Multi-purpose field base and amenities Field drainage system and storm drain improvements Field lighting and electrical Miscellaneous work – fencing, paving, retaining walls etc. retaining walls etc.______________________________________________________________________ Subtotal site improvements$ 2,222,000 Infill artificial turf field multi-purpose field surface$ 550,000 (160,000 square feet) Construction contingency /project administration$ 228,000 ___________________________________________________________________________________ Total Project $ 3,000,000

Project Sequence and Anticipated Schedule March 2011 Council meeting project appropriation February 2011 Project advertisement and Bid April 2011 Notice to proceed Spring/Summer 2011 Project Construction Early Fall 2011 Project Completion February 2011 Project design completion