Harold G. Kirk Brookhaven National Laboratory Muon Production and Capture for a Neutrino Factory European Strategy for Future Neutrino Physics CERN October.

Slides:



Advertisements
Similar presentations
NuFact July 2009 Jim Strait, Nikolai Mokhov, Sergei Striganov Fermilab Comparisons between MARS and HARP data* * Title as given by organizers.
Advertisements

Participants WP3total Imperial College CERN STFC University Warwick CRNS University Oxford6 6 Total Euro  - WP3.
Magnetic Configuration of the Muon Collider/ Neutrino Factory Target System Hisham Kamal Sayed, *1 H.G Kirk, 1 K.T. McDonald 2 1 Brookhaven National Laboratory,
Harold G. Kirk Brookhaven National Laboratory Targetry Plans and Status MUTAC Review FNAL March 17, 2006.
K. McDonald LEMC Workshop 22 Apr 2008 From MERIT to a Muon Collider (Front End) K.T. McDonald Princeton U. Low Emittance Muon Collider Workshop Fermilab,
Managed by UT-Battelle for the Department of Energy Neutrino Factory Mercury Containment Concepts V.B. Graves 2 nd Oxford-Princeton High- Powered Target.
Neutrino Factory Target Cryostat Review Van Graves Cale Caldwell IDS-NF Phone Meeting August 10, 2010.
Meson Production Comparison between Hg and Ga at 8 GeV X. Ding, UCLA Target Studies, Oct. 04, 2011.
Particle Production of a Carbon/Mercury Target System for the Intensity Frontier X. Ding, UCLA H.G. Kirk, BNL K.T. McDonald, Princeton Univ MAP Spring.
Harold G. Kirk Brookhaven National Laboratory MERIT Experiment Status NFMCC Collaboration Meeting FNAL March 17-20, 2008.
1Managed by UT-Battelle for the U.S. Department of Energy MERIT Videoconference 11 Mar 2009 Neutrino Factory Cryostat 1 Concept V.B. Graves MERIT Videoconference.
Operated by Brookhaven Science Associates for the U.S. Department of Energy A Pion Production and Capture System for a 4 MW Target Station X. Ding, D.
Harold G. Kirk Brookhaven National Laboratory High-Power Targets H.G. Kirk Applications of High-Intensity Proton Accelerators FNAL October 20, 2009.
Harold G. Kirk Brookhaven National Laboratory The MERIT High-Power Target Experiment Muon Collider Design Workshop BNL December 3-7, 2007.
1 Optical Diagnostic Results of Hg Jet Target and Post-Simulation H. Park, H. Kirk, K. McDonald Brookhaven National Laboratory Princeton University Stonybrook.
Harold G. Kirk Brookhaven National Laboratory Meson Production Efficiencies IDS Target Meeting CERN December 17, 2008.
1 Meson Production Simulations X. Ding, D. B. Cline UCLA H. Kirk, J. S. Berg BNL N u F a c t th International Workshop on Neutrino Factories, Superbeams.
MCTF Harold G. Kirk MUTAC 5-Year Plan Review 22 August Targetry R&D in the 5-Year Plan Harold G. Kirk Brookhaven National Lab.
KT McDonald Muon Collider 2011 June 28, The Target System Baseline K. McDonald Princeton U. (June 28, 2011) Muon Collider 2011 Telluride, CO More.
Above: Energy deposition in the superconducting magnet and the tungsten-carbide shield inside them. Approximately 2.4 MW must be dissipated in the shield.
1 Optical Diagnostic Results of MERIT (Mercury Intense Target) Experiment at CERN H. Park, H. Kirk, T.Tsang, K. McDonald, F. Ladeinde NFMCC Meeting Fermilab,
MERcury Intense Target (MERIT) Overview Van Graves, ORNL Syringe Procurement Kickoff Meeting Airline Hydraulics Bensalem, PA Oct 28, 2005.
Harold G. Kirk Brookhaven National Laboratory Target System Update IDS-NF Plenary Meeting Arlington, VA October 18, 2011.
Harold G. Kirk Brookhaven National Laboratory Target Baseline IDS-NF Plenary CERN March 23-24, 2009.
1Managed by UT-Battelle for the U.S. Department of Energy NMFCC Friday Meeting 10 Apr 2009 Neutrino Factory Nozzle Layouts V.B. Graves NFMCC Friday Meeting.
IDS-NF Target Studies H. Kirk (BNL) July 8, 2009.
1 Comparison of Power Depositions X. Ding, D. B. Cline, UCLA H. Kirk, J. S. Berg, BNL Collaboration Meeting July 2, 2010.
K. McDonald Muon Collaboration Meeting 19 Mar 2008 Future Target System R&D Analysis (and simulation) of MERIT data is ongoing, but the success of the.
The MERIT High-Power Target Experiment H. Kirk (BNL) CERN November 1, 2007.
Above: Power deposition in the superconducting magnets and the tungsten-carbide + water shield inside them, according to a FLUKA simulation Approximately.
Harold G. Kirk Brookhaven National Laboratory Recent Results from MERIT NUFACT09 Illinois Institute of Technology July 22, 2009.
Above: On-axis field profiles of resistive, superconducting and all magnets, and bore-tube radius r = 7.5 (B/20T) −½ cm. Above: Hoop strain ε θ in resistive.
Harold G. Kirk Brookhaven National Laboratory Meson Production Calculations 1 st Princeton/Oxford High-Power Targets Workshop Oxford May 1-2, 2008.
Operated by Brookhaven Science Associates for the U.S. Department of Energy Optimized Parameters for a Mercury Jet Target X. Ding, D. Cline, UCLA, Los.
The MERIT experiment at the CERN PS Leo Jenner MOPC087 WEPP169 WEPP170.
Solid Target Options NuFACT’00 S. Childress Solid Target Options The choice of a primary beam target for the neutrino factory, with beam power of
The Front End MAP Review Fermi National Accelerator Lab August 24-26, 2010 Harold G. Kirk Brookhaven National Laboratory.
Harold G. Kirk Brookhaven National Laboratory The High-Power Target Experiment at CERN Muon Collaboration Meeting LBNL February 16, 2005.
Harold G. Kirk Brookhaven National Laboratory The High-power Target Experiment at CERN NUFACT’04 Osaka, Japan July 27, 2004.
Front End Technologies Harold Kirk Brookhaven National Laboratory February 19, 2014.
IDS-NF Mercury System Overview Van Graves IDS-NF 5 th Plenary Meeting April 9, 2010.
Target and Absorbers L2 Manager: K McDonald, Princeton U March xx, 2013 Presenter’s Name | DOE Mini-Review of MAP (FNAL, March 4-6, 2013)1 Mission Target:
Harold G. Kirk Brookhaven National Laboratory A MW Class Target System for Muon Beam Production AAC 2014 San Jose, Ca July 14-18, 2014.
Harold G. Kirk Brookhaven National Laboratory Targetry Concept for a Neutrino Factory EMCOG Meeting CERN November 18, 2003.
Meson Productions for Target System with GA/HG Jet and IDS120h Configuration X. Ding (Presenter), D. Cline, UCLA H. Kirk, J.S. Berg, BNL Muon Accelerator.
KT McDonald MAP Spring Meeting May 30, Target System Concept for a Muon Collider/Neutrino Factory K.T. McDonald Princeton University (May 28, 2014)
Next generation of ν beams Challenges Ahead I. Efthymiopoulos - CERN LAGUNA Workshp Aussois, France, September 8,2010 what it takes to design and construct.
Institutional Logo Here Harold G. Kirk DOE Review of MAP (FNAL August 29-31, 2012)1 The Front End Harold Kirk Brookhaven National Lab August 30, 2012.
1 Optical Diagnostic Results of MERIT Experiment and Post-Simulation H. Park, H. Kirk, K. McDonald Brookhaven National Laboratory Princeton University.
KT McDonald MAP Winter Meeting (SLAC) December 5, Solid Target Options for an Intense Muon Source K. McDonald Princeton U. (December 5, 2014) MAP.
Review of Recent IDS120 Target Concepts Van Graves October 31, 2013.
Harold G. Kirk Brookhaven National Laboratory Targetry Concept for a Neutrino Factory Muon Meeting BNL January 26, 2004.
Harold G. Kirk Brookhaven National Laboratory Target Considerations for Nufact and Superbeams ISS Meeting RAL April 26, 2006.
KT McDonald MAP Tech Board Meeting Oct 20, The MAP Targetry Program in FY11 and FY12 K. McDonald Princeton U. (Oct 20, 2011) MAP Technical Board.
Muon Acceleration Program Technology Development A. Bross NFMCC CM January 15, A. Bross NFMCC CM January 15, 2009 It is not a Project!
J. Pasternak First Ideas on the Design of the Beam Transport and the Final Focus for the NF Target J. Pasternak, Imperial College London / RAL STFC ,
Proton Delivery to Target Keith Gollwitzer Accelerator Division Fermilab MAP 2012 Winter Meeting March 7, 2012.
Gallium as a Possible Target Material for a Muon Collider or Neutrino Factory X. Ding, D. Cline, UCLA, Los Angeles, CA 90095, USA J.S. Berg, H.G. Kirk,
K. McDonald MAP Technical Board Meeting Nov 1, FY11 Target System Budget Proposal K. McDonald Princeton U. (November 1, 2010)
Proton Source & Site Layout Keith Gollwitzer Accelerator Division Fermi National Accelerator Laboratory Muon Accelerator Program Review Fermilab, August.
Harold G. Kirk Brookhaven National Laboratory The High-Power Target Experiment at CERN High-Power Targetry Workshop Oak Ridge, TN October 10, 2005.
Harold G. Kirk Brookhaven National Laboratory The High-Power Target Experiment at CERN Report to MUTAC LBNL April 25, 2005.
Meson Production of Carbon Target at 3 GeV X. Ding, UCLA Target Studies 17/18/13.
Institutional Logo Here July 11, 2012 Muon Accelerator Program Advisory Committee Review (FNAL July 11-13, 2012)1 The Front End.
Harold G. Kirk Brookhaven National Laboratory The E951 Targetry Program Targetry Meeting CERN September 19, 2003.
Neutrino Factory Target Cryostat Review (Update Aug 12) Van Graves Cale Caldwell IDS-NF Phone Meeting August 10, 2010.
X. Ding, UCLA MAP Spring 2014 Meeting May 2014 Fermilab
MERIT Scientific goals and importance
Accelerator R&D for Future Neutrino Projects
Meson Production Efficiencies
Presentation transcript:

Harold G. Kirk Brookhaven National Laboratory Muon Production and Capture for a Neutrino Factory European Strategy for Future Neutrino Physics CERN October 1-3, 2009

Harold G. Kirk European Neutrino Physics Oct. 2-3, 2009 The Neutrino Factory Concept μ + -  e + ν μ ν e Beam Cone Opening Angle ~ 1/γ O(10 21 ) μ’s per year μ - -  e - ν μ ν e μ+μ+ ν μ, ν e

Harold G. Kirk European Neutrino Physics Oct. 2-3, 2009 The Key Technical Challenges l Production of the muons n Require a MW-class proton driver n Pulsed beam on a high-Z target n Capture in a 20-T Solenoidal field l Production of a muon beam n Reduction of dE n Phase Space Reduction (Cooling) l Acceleration of the muon beam n Must be rapid (τ μ = 2.2μs at rest)

Harold G. Kirk European Neutrino Physics Oct. 2-3, 2009 The International Design Study Baseline Target/Capture

Harold G. Kirk European Neutrino Physics Oct. 2-3, 2009 The Neutrino Factory Payoff

Harold G. Kirk European Neutrino Physics Oct. 2-3, 2009 The Neutrino Factory Target Concept Maximize Pion/Muon Production l Soft-pion Production l High-Z materials l High Magnetic Field

Harold G. Kirk European Neutrino Physics Oct. 2-3, 2009 The MERIT Experiment at CERN MERcury Intense Target

Harold G. Kirk European Neutrino Physics Oct. 2-3, 2009 Profile of the Experiment l 14 and 24 GeV proton beam l Up to 30 x protons (TP) per 2.5  s spill l 1cm diameter Hg Jet l Hg Jet/proton beam off solenoid axis n Hg Jet 33 mrad to solenoid axis n Proton beam 67 mrad to solenoid axis l Test 50 Hz operations n 20 m/s Hg Jet

Harold G. Kirk European Neutrino Physics Oct. 2-3, 2009 Installed in the CERN TT2a Line Before Mating After Mating and Tilting

Harold G. Kirk European Neutrino Physics Oct. 2-3, 2009 Sectional view of the MERIT Experiment Syringe Pump Secondary Containment Jet Chamber Proton Beam Solenoid Beam Window Hg Jet

Harold G. Kirk European Neutrino Physics Oct. 2-3, 2009 Optical Diagnostics 1 cm Viewport 2 100μs/fras Velocity Analysis Viewport 3 500μs/fras Disruption Analysis

Harold G. Kirk European Neutrino Physics Oct. 2-3, 2009 Stabilization of Jet by High Magnet Field Jet velocities: 15 m/s Substantial surface perturbations mitigated by high-magnetic field. 0T 5 T 10 T 15 T MHD simulations (W. Bo, SUNYSB):

Harold G. Kirk European Neutrino Physics Oct. 2-3, 2009 Disruption Analysis Disruption lengths reduced with higher magnetic fields Disruption thresholds increased with higher magnetic fields 14 GeV24 GeV

Harold G. Kirk European Neutrino Physics Oct. 2-3, TP, 10T 20TP, 10T t=0 t=0.175 ms t=0.375 ms V = 54 m/s t=0.075 ms t=0 t=0.175 ms t=0.375 ms t=0.050 ms V = 65 m/s Velocity of Splash: Measurements at 24GeV

Harold G. Kirk European Neutrino Physics Oct. 2-3, 2009 Filament Velocities Ejection velocities are suppressed by magnetic field

Harold G. Kirk European Neutrino Physics Oct. 2-3, 2009 Pump-Probe Studies Test pion production by trailing bunches after disruption of the mercury jet due to earlier bunches At 14 GeV, the CERN PS can extract several bunches during one turn (pump), and then the remaining bunches at a later time (probe). Pion production was monitored for both target-in and target-out events by a set of diamond diode detectors. PUMP: 12 bunches, 12  protons PROBE: 4 bunches, 4  protons Diamond Detectors Proton Beam Hg Jet Target

Harold G. Kirk European Neutrino Physics Oct. 2-3, 2009 Pump-Probe Data Analysis No loss of pion production for bunch delays of 40 and 350  s, A 5% loss (2.5-  effect) of pion production for bunches delayed by 700  s. Production Efficiency: Normalized Probe / Normalized Pump

Harold G. Kirk European Neutrino Physics Oct. 2-3, 2009 Study with 4 Tp + 4 Tp at 14 GeV, 10 T Single-turn extraction  0 delay, 8 Tp 4-Tp probe extracted on subsequent turn  3.2 μs delay 4-Tp probe extracted after 2nd full turn  5.8 μs Delay Threshold of disruption is > 4 Tp at 14 Gev, 10 T.  Target supports a 14-GeV, 4-Tp beam at 172 kHz rep rate without disruption. PUMP: 8 bunches, 4  protons PROBE: 8 bunches, 4  protons

Harold G. Kirk European Neutrino Physics Oct. 2-3, 2009 Key MERIT Results l Jet surface instabilities reduced by high-magnetic fields l Hg jet disruption mitigated by magnetic field n 20 m/s operations allows for up to 70Hz operations l 115kJ pulse containment demonstrated 8 MW capability demonstrated l Hg ejection velocities reduced by magnetic field l Pion production remains viable upto 350μs after previous beam impact l 170kHz operations possible for sub-disruption threshold beam intensities

Harold G. Kirk European Neutrino Physics Oct. 2-3, 2009 The MERIT Bottom Line The Neutrino Factory/Muon Collider target concept has been validated for 4MW, 50Hz operations. BUT We must now develop a target system which will support 4MW operations

Harold G. Kirk European Neutrino Physics Oct. 2-3, 2009 MERIT and the IDS Baseline Mean beam power 4 MW Pulse repetition rate50 Hz Proton kinetic energy GeV Bunch duration at target1-3 ns rms Number of bunches per pulse1-3 Separated bunch extraction delay  17 µs Pulse duration:≤ 40 µs NERIT OK  6 µs ≤ 350 µs The IDS Proton Driver Baseline Parameters

Harold G. Kirk European Neutrino Physics Oct. 2-3, 2009 IDS-NF Target Studies Follow-up: Engineering study of a CW mercury loop + 20-T capture magnet l Splash mitigation in the mercury beam dump. l Possible drain of mercury out upstream end of magnets. l Downstream beam window. l Water-cooled tungsten-carbide shield of superconducting magnets. l HTS fabrication of the superconducting magnets. l Improved nozzle for delivery of Hg jet

Harold G. Kirk European Neutrino Physics Oct. 2-3, 2009 Possible Future Role for CERN A natural CERN contribution would be participation in the design and testing of a prototypical neutrino factory target system with an intense proton beam. This would take explicit advantage of CERN’s expertise, capabilities and facilities

Harold G. Kirk European Neutrino Physics Oct. 2-3, 2009 Iron Plug Proton Beam Nozzle Tube SC-1 SC-2 SC-3SC-4 SC-5 Window Mercury Drains Mercury Pool Water-cooled Tungsten Shield Mercury Jet Resistive Magnets Neutrino Factory Study 2 Target Concept ORNL/VG Mar2009 Splash Mitigator The Target System Van Graves, ORNL

Harold G. Kirk European Neutrino Physics Oct. 2-3, 2009 A 4MW Target Hall Phil Spampanato, ORNL

Harold G. Kirk European Neutrino Physics Oct. 2-3, 2009 The Jet/Beam Dump Interaction T. Davonne, RAL

Harold G. Kirk European Neutrino Physics Oct. 2-3, 2009 Shielding the Superconducting Coils MARS Dose Rate calculations

Harold G. Kirk European Neutrino Physics Oct. 2-3, 2009 MARS15 Study of the Hg Jet Target Geometry Previous results: Radius 5mm, θ beam =67mrad Θ crossing = 33mrad

Harold G. Kirk European Neutrino Physics Oct. 2-3, 2009 Optimized Meson Production Production of soft pions is most efficient for a Hg target at E p ~ 6-8 GeV, Comparison of low-energy result with HARP data ongoing Radius Previous baseline 0.5cm Beam Angle Previous baseline 67 mrad X. Ding, UCLA Beam/Jet Crossing Angle Previous baseline 33mrad

Harold G. Kirk European Neutrino Physics Oct. 2-3, 2009  (   ) /E beam, integrated over the measured phase space (different for the two groups). HARP (p + Pb ->  +- X) HARP-CDP (p + Ta ->  +- X)  peaks in range 4~7 GeV => no dramatic low E drop-off Jim Strait – NUFACT09 30J. Strait - FermilabNuFact ‘09

Harold G. Kirk European Neutrino Physics Oct. 2-3, 2009 HARP Cross-Sections x NF Capture Acceptance HARP (p + Pb ->  +- X) HARP-CDP (p + Ta ->  +- X) 31NuFact ‘09J. Strait - Fermilab HARP pion production cross-sections, weighted by the acceptance of the front- end channel, and normalized to equal incident beam power, are relatively independent of beam energy.

Harold G. Kirk Brookhaven National Laboratory Multiple Proton Beam Entry Points p0 p8 p4 p12 jet Proton beam entry points upstream of jet/beam crossing Proton Beam Entry points are asymmetric due to the beam tilt in a strong magnetic field

Harold G. Kirk European Neutrino Physics Oct. 2-3, 2009 Trajectory of the Proton Beam Selected Proton Beam transverse trajectories relative to the Hg Jet.

Harold G. Kirk European Neutrino Physics Oct. 2-3, 2009 Multiple Proton Beam Entries p11 p4 A 10% swing in meson production efficiency

Harold G. Kirk European Neutrino Physics Oct. 2-3, 2009 Influence of β * of the Proton Beam β* = 10cm β* = 300cm

Harold G. Kirk European Neutrino Physics Oct. 2-3, 2009 Meson Production vs β * Meson Production loss ≤ 1% for β * ≥ 30cm

Harold G. Kirk European Neutrino Physics Oct. 2-3, 2009 Summary l MERIT has successfully demonstrated the Neutrino Factory/Muon Collider target concept l Target studies are continuing within IDS-NF framework l The infrastructure for a 4MW target system needs to be designed/engineered (this has generic value beyond a Neutrino Factory specific target station) l CERN participation in MERIT was crucial to its success. CERN participation in the development of a 4MW target system would be both welcome and beneficial to the entire accelerator physics community