Experience and Projections for Low-Energy RHIC Operations Todd Satogata, Collider-Accelerator Department June 9, 2006 Motivated by discussions at the “Can.

Slides:



Advertisements
Similar presentations
Brookhaven Science Associates U.S. Department of Energy Todd Satogata 1 Fri May RHIC FY03 Deuteron-Gold Performance n RHIC Deuteron-Gold Performance.
Advertisements

Beam Dynamics in MeRHIC Yue Hao On behalf of MeRHIC/eRHIC working group.
Note: most of the slides shown here are picked from CERN accelerator workshops. Please refer to those workshop for further understanding of the accelerator.
1 RHIC Run-7 Au-Au Operation A. Drees APEX workshop, Nov 2 nd 2006 Run organization Previous run and expectation for Run7 Start-Up plan Problem areas.
Experience and Projections for Low-Energy RHIC Operations Todd Satogata, Collider-Accelerator Department Workshop on Future Prospects in High Energy QCD.
Thomas Roser Muon collaboration meeting February 8-10, 2002 AGS beam intensity upgrades What has been achieved Sextupole power supply upgrades Bunch manipulation.
Winter Workshop, San Diego Mar 16, 2006Angelika Drees Short- and Long-term Future of RHIC Introduction Luminosity, Luminosity Limitations Runs so far and.
Run 11 as run 3 Jan, Begin cool-down to 4.5K 8 Jan, Cool-down to 4.5K complete in both rings, preliminary setup begins 24 Jan, 1 week Ramp-up with 8 hr/night.
Thomas Roser RHIC Open Planning Meeting December 3-4, 2003 RHIC II machine plans Electron cooling at RHIC Luminosity upgrade parameters.
1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.
Run 13 RHIC Machine/Experiments Meeting 4 Jun 2013 Agenda: Status Reports Hydrogen Jet issue (Eyser)
Copyright, 1996 © Dale Carnegie & Associates, Inc. Intra-beam Scattering -- a RHIC Perspective J. Wei, W. Fischer Collider-Accelerator Department EIC Workshop,
1 QM2006 D.I.Lowenstein RHIC : The Path Forward Presented to Quark Matter 2006 Shanghai, PRC Derek I. Lowenstein Brookhaven National Laboratory November.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, N.Kazarinov.
Beam-beam Observations in RHIC Y. Luo, W. Fischer Brookhaven National Laboratory, USA ICFA Mini-workshop on Beam-Beam Effects in Hadron Colliders, March.
RESEARCH POSTER PRESENTATION DESIGN © The RHIC Beam Energy Scan (BES) was proposed to search for the possible critical.
Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL. V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline  1 Feb – Start of the Run-6. Start of the cooldown.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
RHIC Run14 Time Meeting. Run14 Status – Apr. 29 Operations running well, 11 full stores over the past 7 days; setting STAR ZDC rates to 50 khz is now.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, A.Drozhdin, N.Kazarinov.
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
Alexei Fedotov, 02/02/12 1 Potentials for luminosity improvement for low-energy RHIC (with electron cooling) February 2, 2012.
1 FFAG Role as Muon Accelerators Shinji Machida ASTeC/STFC/RAL 15 November, /machida/doc/othertalks/machida_ pdf/machida/doc/othertalks/machida_ pdf.
R. Assmann - LHCCWG Two Beam Operation R.W. Aßmann LHCCWG Acknowledgements to W. Herr, V. Previtali, A. Butterworth, P. Baudrenghien, J. Uythoven,
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
Beam-Beam and e-Cloud in RHIC Oct. 6, 2015 Haixin Huang, Xiaofeng Gu, Yun Luo.
ERHIC Conceptual Design V.Ptitsyn, J.Beebe-Wang, I.Ben-Zvi, A.Fedotov, W.Fischer, Y.Hao, V.N. Litvinenko, C.Montag, E.Pozdeyev, T.Roser, D.Trbojevic.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
ERHIC with Self-Polarizing Electron Ring V.Ptitsyn, J.Kewisch, B.Parker, S.Peggs, D.Trbojevic, BNL, USA D.E.Berkaev, I.A.Koop, A.V.Otboev, Yu.M.Shatunov,
ERHIC design status V.Ptitsyn for the eRHIC design team.
Flat-beam IR optics José L. Abelleira, PhD candidate EPFL, CERN BE-ABP Supervised by F. Zimmermann, CERN Beams dep. Thanks to: O.Domínguez. S Russenchuck,
APEX Report: February 26-27, 2008 Fulvia Pilat Time Meeting, March 4, 2008.
RHIC Run11 Summary May 6, 2011 RSC Meeting Haixin Huang Luminosity Availability Polarization RHIC setup issues.
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
NICA start-up scenario + questions of instabilities A.Sidorin For NiCA team NICA Machine Advisory Committee at JINR (Dubna) October 19-20, 2015.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
CERN F. Ruggiero Univ. “La Sapienza”, Rome, 20–24 March 2006 Measurements, ideas, curiosities beam diagnostics and fundamental limitations to the performance.
Vladimir Litvinenko, APEX Workshop 11/02/20006 IBS suppression lattice Mei Bai, Joanne Beebe-Wang, Peter Cameron, Roger Connolly, Angelika Drees, Alexei.
Prospects for RHIC Low-Energy Operations Todd Satogata (W. Fischer, T. Roser, A. Fedotov, N. Tsoupas, M. Brennan, C. Montag, and others) “Can We Discover.
Beam-beam compensation at RHIC LARP Proposal Tanaji Sen, Wolfram Fischer Thanks to Jean-Pierre Koutchouk, Frank Zimmermann.
Nuclear Phase Transition Diagram Mar RHIC Monday Meeting T. Satogata DOE NSAC Long Range Plan … a whole page! (one out of 14)
Run 12 RHIC Machine/Experiments Meeting 24 Apr 2012 Agenda: Status reports Other business.
RHIC Low-Energy Au Test Run Summary Todd Satogata L. Ahrens, M. Bai, J.M. Brennan, D. Bruno, J. Butler, B. Christie, A. Drees, A. Fedotov, W. Fischer,
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
1 RHIC II – Ion Operation Wolfram Fischer RHIC II Workshop, BNL – Working Group: Equation of State 27 April 2005.
Polarized Proton at RHIC: Status and Future Plan Mei Bai Collider Accelerator Dept. BNL A Special Beam Physics Symposium in Honor of Yaroslav Derbenev's.
Beam-beam Simulation at eRHIC Yue Hao Collider-Accelerator Department Brookhaven National Laboratory July 29, 2010 EIC Meeting at The Catholic University.
1 Machine issues for RHIC II Wolfram Fischer PANIC Satellite Meeting – New Frontiers at RHIC 30 October 2005.
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 7 Jun 2011 Agenda: √s = 200 GeV AuAu progress 27 GeV Run (or other)
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 31 May 2011 Agenda: √s = 200 GeV AuAu progress Update on 250 GeV integrated Lumi.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Jun 2011 Agenda: √s = 200 GeV AuAu progress ZDC Calibration for AnDY – the plan Request from AnDY √s = 27 GeV.
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
A RHIC Low-Energy Test Run With Protons Todd Satogata (W. Fischer, T. Roser, J. DeLong, M. Brennan, D. Bruno, and others) April 11, 2006 Driven by discussions.
EC plans in connection with eRHIC Wolfram Fischer ILCDR08 – Cornell University, Ithaca, New York 10 July 2008.
Alexei Fedotov, December 7, Beam parameters and collective effects for pEDM ring (December 7, 2009)
Beam-beam effects in eRHIC and MeRHIC
Large Booster and Collider Ring
Jeffrey Eldred, Sasha Valishev
eRHIC with Self-Polarizing Electron Ring
LHC (SSC) Byung Yunn CASA.
The Proposed Conversion of CESR to an ILC Damping Ring Test Facility
JLEIC Main Parameters with Strong Electron Cooling
MEIC New Baseline: Part 7
MEIC New Baseline: Performance and Accelerator R&D
HE-JLEIC: Do We Have a Baseline?
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
Some Thoughts on the JLEIC Ion Injector
SC Magnets with Small Apertures for JLEIC*
Optimization of JLEIC Integrated Luminosity Without On-Energy Cooling*
Presentation transcript:

Experience and Projections for Low-Energy RHIC Operations Todd Satogata, Collider-Accelerator Department June 9, 2006 Motivated by discussions at the “Can We Discover the QCD Critical Point at RHIC?” RIKEN Workshop, March  Background, parameters, challenges  22 GeV proton test run preliminary findings  Performance projections and plans

June 9, 2006T. Satogata - AGS/RHIC User's Meeting2 Background and Challenges  There is substantial and growing interest in RHIC heavy ion collisions with c.m. energy in the range  s NN = 5-50 GeV/n  Corresponds to Au beams in RHIC of  =2.68 to 26.8  Nominal Au injection is  =10.52, already below design  =12.6  Krishna Rajagopal’s Thursday talk, RIKEN workshop energies:  s NN = 5, 6.3, 7.6, 8.8, 12.3, 18, 28 GeV/n  Operational and strategic challenges  How does RHIC magnetic field quality degrade at lower currents and energies?  Can we correct all necessary machine parameters with the existing power supply configuration?  What are short- and long-term facility improvements?  Can we collide 32 Au to lower Z/A, and run with higher fields/currents? (Workshop short answer: unfortunately not.)

June 9, 2006T. Satogata - AGS/RHIC User's Meeting3 RIKEN Workshop Accelerator Summary  No apparent show-stoppers for RHIC collisions at E cm = 5-50 GeV/n  Only equal energies  Unequal species possible only if minimum rigidity > 200 T-m  Without cooling  long vertex distribution  Small set of specific energies (and species?) should be a workshop deliverable for planning:  2.5,3.2,3.8,4.4… GeV/n total beam energy  Studies that should be done soon:  A ~1 day study period at low total beam energy to identify power supply, lifetime, tuning issues/limitations  Low-current superconducting magnet measurements  Pre-cooling in AGS  10x luminosity ?  Electron beam cooling would make this a fantastic facility: ~100x luminosity, small vertex distribution, long stores. Expected whole vertex minbias event rate [Hz] T. Roser, T. Satogata RHIC Heavy Ion Collisions

June 9, 2006T. Satogata - AGS/RHIC User's Meeting4 Low-Energy Magnetic Field Quality  Magnet currents scale with rigidity B  which scale with   Field quality deteriorates rapidly at very low currents  Currently have some magnet measurements at very low currents, enough for simulations  Extrapolating low-field behavior from simulations Total Energy  BB Dipole Current 9.8 GeV/u A 2.5 GeV/u A pp Low-Energy Test

June 9, 2006T. Satogata - AGS/RHIC User's Meeting5 Proton/Gold parameters tested at B  =37.4 T-m ProtonsGold (eq)  s [GeV] Beam energy [GeV] Beam kinetic energy [GeV] Relativistic  Relativistic  Momentum [GeV/c] B  [T-m]37.40 Injection current scaling Main dipole current [A]217.7 Main quad current [A]202.6 Revolution frequency [Hz] RF frequency [MHz, h=360]  Gold energy (  s NN =9.2 GeV/n) is near middle of preferred energy list  Tested magnets and power supplies at less than half of normal injection current  Reasonably balance for initial testing, performance extrapolation  Did NOT require change to RHIC harmonic number or substantial reconfiguration of RHIC RF  Au h=366 gives RHIC RF frequency of MHz RHIC RF frequency range is MHz

June 9, 2006T. Satogata - AGS/RHIC User's Meeting6 Low-Energy Proton Test Run Results (June )  First injection to circulating beam in about 30 minutes (both rings)  Circulating beam to RF capture in under 3 hours.  Single bunch intensities up to about 8e10 protons.  Injection efficiency was about 70-80%.  Beam lifetimes of 5-10h (not in collision) and 4-5h (in collision) achieved.  Chromaticities and instabilities can barely be controlled with existing power supplies at this energy. For this and lower energies, we should rewire unipolar sextupoles for future operations.  Proton emittances out of AGS were very good (<10  mm mrad normalized) Measured emittances in RHIC are being analyzed, but appear to be comparable as long as beams did not go unstable.  Optics measurements and correction data were taken in both rings, and will be analyzed to compare to tests. Initial analyses show that optics (beta functions, phases, dispersions) are surprisingly close to the model, so linear field quality is not limiting performance.  Two hours were spent performing vernier scans in PHENIX and STAR with beam-beam counters. These data are currently being analyzed.

June 9, 2006T. Satogata - AGS/RHIC User's Meeting7 Low-Energy Test Run Optics  Measured optics in both rings are surprisingly good  No indications of linear optics problems, quadrupole magnet or power supplies with aberrant low-current behavior Horizontal Dispersion [Blue, m] S-coordinate [m]

June 9, 2006T. Satogata - AGS/RHIC User's Meeting8 Low-Energy Test Run Beam Ripple  Measured beam ripple in both rings is also good  No indications of major coherent ripple from power supplies  Coherent beam oscillation spectrum comparable to injection at nominal energies  Should still dwell AGS Booster during low-energy stores 60 Hz 120 Hz 360 Hz 10 Hz Beam Position [mm] Sampled turn number FFT Frequency [x100 Hz] FFT Amplitude

June 9, 2006T. Satogata - AGS/RHIC User's Meeting9 Low-Energy Test Run Instabilities  Beam stability was a problem through the low-energy test  Power supply configuration did not permit necessary chromaticity control  Yellow beam was metastable at best  Some instabilities damped with strong octupoles in both rings Unstable blue beam “Metastable” yellow beam

June 9, 2006T. Satogata - AGS/RHIC User's Meeting10 Low-Energy Test Run Vernier Scans (STAR)  Collision steering attempted at STAR and PHENIX  Mostly background, likely driven by unstable (large) yellow beam  Some apparent real rates in STAR, though very low  Rates consistent with luminosity down by factor 2500 from 100 GeV (1.7x10 28 )  Expected reduction from beam parameters is closer to 4000 Difficult to justify one-day 22 GeV pp run this year from this data Luminosity monitoring will be a challenge for low-energy program Beam-beam tune shift may be one of our best luminosity observables BBC Rates [Hz] Horizontal bump position [mm] Vertical bump position [mm] BBC Rates [Hz]

June 9, 2006T. Satogata - AGS/RHIC User's Meeting11 Low-Energy Testing in 2007  IBS will make ion lifetimes worse than protons (A. Fedotov)  Consistent with 15- to 30-minute stores at 5 GeV/u  Lower energies likely require cooling or lattice modifications  Recommend ~1 week of low-energy Au setup and operations  Between maintenance days to swap power supply polarities  CERN data suggests  s NN =7.6 GeV/u; leverage 9.2 GeV/u done  Gain experience with IBS, low luminosity, fast refills  Produces definitive luminosity for performance extrapolations  Tests at multiple energies? One day at  s NN =5 GeV/u? Beam Energy [GeV/u]IBS growth time [s] (horizontal)

June 9, 2006T. Satogata - AGS/RHIC User's Meeting12 IBS and Electron Cooling at 2.5 GeV/u  IBS growth times for low-energy gold ions are short, o(4 minutes)  Correspondingly short luminosity lifetimes, need to constantly refill  Electron cooling with a modest electron beam can help  Cooling times are a few seconds, dramatically improves emittances and lumi lifetime  Electron beam from simulation: q=5nC, RMS  e,n =10  m,  p =1e-3, L=10m (Figs: plotted emittance is rms unnormalized)  Might be done with prototype ERL gun currently in design emittance growth (95% normalized) due to IBS:  i,n,95% : 15  -> 48  in 30 min Cooling of transverse emittance (95% normalized):  i,n,95% : 15  -> 4  in 10 sec A. Fedotov

June 9, 2006T. Satogata - AGS/RHIC User's Meeting13 Summary and Recommendations  There is substantial and growing interest in RHIC operations at low energies (  s NN = 5-50 AGeV)  Discovery of the QCD critical point would be another major discovery at RHIC  There are (still) no show-stoppers to a low-energy program  Low-energy (B  =37.4 T-m) test run occurred June  Injection efficiency 70-80%, lifetimes up to 5-10h, good optics  Addressable issues: sextupoles, instabilities, lumi monitoring  Difficult to justify one-day  s = 22 GeV run this year  Future planning  One week of 1-2 energies in 2007 with ions is natural next step  Recommended energies:  s NN =7.6 GeV/u, test at  s NN =5 GeV/u  Low-energy electron cooling looks very beneficial in longer timescale (Compatible with STAR TOF upgrade?)

June 9, 2006T. Satogata - AGS/RHIC User's Meeting14 ==================================================

June 9, 2006T. Satogata - AGS/RHIC User's Meeting15 Initial Machine Projections ModeBeam Energy [GeV/u] N bunches Ions/bunch [  9 ]  * [m] Emittance [  m] L peak [cm -2 s -1 ] Au-Au  Au-Au  Au-Au  Au-Au  Au-Au   Assumes expected luminosity scaling as  3 below 9.8 GeV/u   */aperture and integrated luminosity tradeoffs must be studied  Projections do not include potential improvements  Electron and stochastic cooling (peak and integrated luminosity)  Lattice modifications to mitigate IBS (integrated luminosity)  Total bunch intensity from vacuum improvements (peak luminosity)

June 9, 2006T. Satogata - AGS/RHIC User's Meeting16 Searching For The QCD Critical Point A. Cho, Science, 312 (14 Apr 2006)

June 9, 2006T. Satogata - AGS/RHIC User's Meeting GeV/u Au collisions  2 days of 9.8 GeV/u collisions  0.4  b -1 integrated luminosity   *=3m by necessity  minute stores  56 Au bunches, 0.6x10 9 /bunch  Hz ZDC rates  IBS and aperture dominated beam and luminosity lifetime  Another run at this energy may improve this by factor of 2-5  x10 9 /bunch  Raise  * to improve lifetime  RHIC is best used as a storage ring collider below beam energies of ~12 GeV/u

June 9, 2006T. Satogata - AGS/RHIC User's Meeting18 Transition Energy Modification  For Run 6, transition energy was successfully modified  Lowering polarized proton injection energy for spin matching  Nominal    23.5, modified    22.8  Primarily changes horizontal dispersion, momentum aperture  No effort to tune dispersion matching, limit triplet dispersion Modified Nominal

June 9, 2006T. Satogata - AGS/RHIC User's Meeting19 Cooling at Low Energies  Stochastic cooling is feasible but requires development  Different mixing regime than high-energy stochastic cooling  Cannot use filter cooling, as Schottky bands overlap  Higher cooling rates at lower energies, but requires different method Cooling rate estimates under development  Palmer cooling  Under active development at C-AD as frontier of cooling Will test cutting chord from pickup to kicker in Run 7  Requires new cold pickup in arc (high dispersion, low beta)  Concerns about 10 Hz coherenct signal rejection  Electron cooling discussed in Alexei’s talk

June 9, 2006T. Satogata - AGS/RHIC User's Meeting20 79 Au vs 32 Au Beam Parameters for 79 Au Beam Parameters for 32 Au  Using 32 Au for low-energy heavy ion collisions reduces Z/A and increases required magnet fields by almost factor 2.5  Lowest main dipole/quad currents are above those already tested with protons on June 5 during low-energy test setup  Likely limited to below  s NN =10 GeV/n by injection kicker strength  Most energies of interest could still run as storage ring  Many uncertainties: backgrounds, lifetime, emittance, dissociation cross section, IBS reduction… but still appealing if feasible.