A Post P5 Planning Exercise at Fermilab Greg Bock Fermilab PAC July 24, 2014.

Slides:



Advertisements
Similar presentations
Accelerator based Neutrino program around the world 1. Europe: Neutrino platform at CERN ESS second maximum? 2. Japan: T2K and HyperK status 3. USA: LBNF.
Advertisements

Department of Energy Office of Science HEP FY08 Budget Status and Issues Robin Staffin preCRB Discussion April
DOE Neutrino Program Plans
Department of Energy Office of Science Yet Another Report from DOE Office of High Energy Physics Presented to SLUO September 10, 2006 Dr. Robin.
F Future of Neutrino Program at FNAL NuMI Off-Axis Meeting Hugh Montgomery January 12, 2004.
Office of Science U.S. Department of Energy SLAC Users Organization Meeting July 6, 2004 Dr. Robin Staffin, Associate Director Office of High Energy Physics.
2/21/2008 P5 neutrino session1 Conventional neutrino experiments Heidi Schellman P5 February 21, 2008.
F Accelerator Physics Center: Status FNAL Steering Group V. Shiltsev.
FY2010 PEMP Notable Outcomes October 15, FRA, LLC Board of Directors 10/15-16/2009 Office of Quality and Best Practices Performance Evaluation Management.
Fermilab Implementation of DOE Critical Decision Process FRA Project Management System Presentation by L Edward Temple Jr Head, Office of Project Management.
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
American Neutrino Strategy: Consequences of P5 Report Jim Strait, LBNE Project Director NuFact August 2014.
Long Range Planning Pier Oddone September 24, 2007.
BNL Overview DOE Annual HEP Program Review Brookhaven National Laboratory April 17-19, 2006 Sam Aronson.
Impacts of Tevatron Extension Pier Oddone P5 Meeting, October 15 th, P. Oddone, P5 Meeting, October 15, 2010.
Muon Ionization Cooling Experiment: U.S. Muon Accelerator Program Perspective and Approach Mark Palmer May 7, 2013.
24 April 2015 FY 2016 Budget Request to Congress for DOE’s Office of Science Dr. Patricia M. Dehmer Acting Director, Office of Science
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
F FNAL Hugh Montgomery Fermilab October, f October20,22, 20052Collider International Finance Committees New Director Pier Oddone –July 1, 2005 Organization.
P5 and the HEP Program A. Seiden Fermilab June 2, 2003.
Mu2e Cost and Schedule Ron Ray Mu2e Project manager Fermilab PAC Meeting November 3-4, 2008.
Cost and Engineering Working Group Introduction Jim Strait Fermilab LBNE Project Manager Deputy Chair, Cost and Engineering Working Group LBNE Reconfiguration.
Fermilab Neutrino Program Jim Strait Neutrino Discussion at CERN 26 November 2013.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
Challenges & Issues for SBNE Nigel S. Lockyer 4/4/14.
U.S. Muon Accelerator Program: MICE Milestones & Resource-Loaded Schedule M. A. Palmer, Director October 31, 2012.
11 DOE Office of Science High Energy Physics Program AAAC Meeting October 15, 2009 National Science Foundation Dennis Kovar Associate Director of the Office.
Fermilab Presentation Greg Bock, Pepin Carolan, Mike Lindgren, Elaine McCluskey 2014 SC PM Workshop July 2014.
WG3 – Part 3 - Design Studies Introduction Introduction View from Europe - RE View from Europe - RE “ “ Japan- Yoshi Kuno “ “ Japan- Yoshi Kuno “ “ US-
Report from Fermilab Presentation to ICFA Symposium Daegu, Korea September 2005 Pier Oddone.
Status Report on ILC Project in Japan Seiichi SHIMASAKI Director, Office for Particle and Nuclear Research Promotion June 19, 2015.
John Womersley Welcome Director of Particle Physics, CCLRC International Scoping Study Meeting, RAL April 2006.
Summary Comments and Discussion Pier Oddone 40 th Anniversary Users’ Meeting June 8, 2007.
Mu2e, August 15, 2007 E Prebys 1 The Steering Group and mu2e Eric Prebys.
PIP-II: Why a new accelerator? Paul Derwent Fermilab Community Advisory Board 23 July 2015.
Welcome and Presentation of Charge Steve Holmes Accelerator Advisory Committee ( May 10-12, 2005.
Proton Improvement Plan: View from the Directorate (and the DOE) Stuart Henderson PIP Meeting Jan 3, 2012.
International Design Study for a Neutrino Factory in the 5 Year Plan A. Bross NFMCC CM January 15, A. Bross NFMCC CM January 15, 2009.
Department of Energy Office of Science  FY 2007 Request for Office of Science is 14% above FY 2006 Appropriation  FY 2007 Request for HEP is 8% above.
News Y2K June 25, Summary of June 12 Face-to-Face Meeting.
Plan to go forward Peter Wilson SBN Program Coordinator 27 September 2014.
Management February 20, Annual Review of the Muon Accelerator Program (MAP) Subcommittee members: Ron Prwivo, Ron Lutha, and Jim Kerby.
Fermilab: Present and Future Young-Kee Kim Data Preservation Workshop May 16, 2011.
Budget Outlook Glen Crawford P5 Meeting Sep
P5 Report: The Particle Physics Roadmap 1 A. Seiden Fermilab May 14, 2007.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
BNL Overview DOE Annual HEP Program Review Brookhaven National Laboratory April 17-19, 2006 Sam Aronson.
Fermilab Project Overview Michael Lindgren 2014 EVMS Surveillance Review 10-Dec-2014.
Nigel Lockyer Fermilab Operations Review 16 th -18 th May 2016 Fermilab in the Context of the DOE Mission.
Long-Baseline Neutrino Facility LBNF LBNF/DUNE Status N. S. Lockyer
Nigel Lockyer Fermilab Operations Review 16 th -18 th May 2016 Fermilab in the Context of the DOE Mission.
Project Management Update Jack Anderson Interim Laboratory Director/ Chief Operating Officer for Earned Value Management System Review Team August 19,
CPAD Instrumentation Frontier Meeting October 5-7, 2015 Glen Crawford, Helmut Marsiske Office of Science, U.S. Department of Energy DOE Office of High.
Workshop Goals and Project Management “120A ” – FY15 Budget Request Steve Holmes PIP-II Budget Retreat July 22, 2014.
Computing All Hands Meeting Rob Roser 20 February 2015.
Fermilab: Introduction Young-Kee Kim DOE KA12 (Electron Research)Review June 22-23, 2010.
HEPAP Facilities Subpanel and the Cosmic Frontier SLAC Snowmass Cosmic Frontiers Meeting March 6, 2013 Josh Frieman Fermilab and University of Chicago.
Muon Accelerator Program: Overview & Directions Mark Palmer June 19, 2013.
CPM 2012, Fermilab D. MacFarlane & N. Holtkamp The Snowmass process and SLAC plans for HEP.
K. Long, R. Roser, 23 July 2014 Report from the Neutrino Summit.
Strategic Planning Process Erik Gottschalk Fermilab Physics Advisory Committee Meeting – June 22-25, June 2015.
Fermilab Budget Briefing FY 2014 Intensity Frontier Proton Research KA Breakout February 28, 2013 Office of High Energy Physics Germantown, MD.
Accelerator Division View Sergei Nagaitsev DOE Independent Project Review of PIP-II 16 June 2015.
Challenges to get LBNF ready for Far Detector installation ASAP Elaine McCluskey ELBNF Proto-Collaboration Meeting 22 Jan 2015.
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
Welcome! Robert Zwaska 23 November 2015 Workshop on Booster Performance and Enhancements.
Particle Physics Sector Young-Kee Kim / Greg Bock Leadership Team Strategic Planning Winter Workshop January 29, 2013.
Head, Office of Project Management Oversight (OPMO)
Preliminary Project Execution Plan
Presentation transcript:

A Post P5 Planning Exercise at Fermilab Greg Bock Fermilab PAC July 24, 2014

Pre-P5 7/24/14G. Bock | Post P5 Planning2 Fermilab established a working group of its senior scientists to provide “Our Vision” as input to P5 last fall G, Rameika to P5

7/24/14G. Bock | Post P5 Planning3

The Field Today Muons: Mu2e, Muon g-2 DESI LBNE: Recast as international LBNF PIP-II Project X ORKA LSST EDMs Generation 2&3 Dark Matter Experiments LHC upgrades (accelerator and detector) MAP/MICE NuSTORM (neutrino factory) Muon Collider ILC (US contribution) Materials and irradiation facility 7/16/2014Nigel S. Lockyer | Fermilab Annual Laboratory Plan4

Charge for the post P5 exercise Given the P5 report, develop a proposal to the director that lays out schedule, priority, and attainable scope –Use the P5 schedule and priority guidance and see how close we can come to meeting the proposed plan –Incorporate Operations (and Research?) in the picture –If necessary, suggest what to delay Can we achieve this? If not, what do we suggest changing—Schedule? Scope? –What problems do we already suspect/know about? ~20 people/4 meetings. Plus work in subgroups and by individuals Top down/Bottoms up approaches. Assumed flat budgets. Rolled up resource needs of the near term projects and compared with lab staff 7/24/14G. Bock | Post P5 Planning5

Brenna Flaugher Daniel A. Bauer Denise Keiner Dmitri S. Denisov Elaine G. McCluskey Erik Gottschalk Greg Bock Jim Strait Joseph Lykken Michael A. Lindgren Nigel Lockyer Paul Czarapata Patricia McBride Peter J. Wilson Regina Rameika Rob Roser Robert Tschirhart Ron Lipton Sergei Nagaitsev Stephen Brice Stephen Holmes Steve Geer Victoria White P7 team (in some unknown order, missing a couple folks) 7/24/14G. Bock | Post P5 Planning6

Context: What’s been accomplished since 2000? 413.3b PROJECTS ~$1B –NuMI –CMS/ATLAS/LHC –RunII Upgrades –Minerva –Decam –Nova –Microboone –‘Campaigns’, (“p”ROJECTS) ~$0.5B –MiniBoone –Sciboone –Run II luminosity upgrades –SRF –MAP –PIP Plus Operation of the Tevatron 7/24/14G. Bock | Post P5 Planning7

The scenario Support CMS and LHC (operations, analyses, upgades, US CMS community) Pursue dark sector opportunities including a modest CMB effort Run the NOvA program Establish a near term short baseline program that : –Investigates anomalies –Precision cross section measurements –R&D and common infrastructure development, especially for Near Detector –Builds and sustains the international neutrino community at FNAL Complete construction and operate the two muon experiments Concurrently start on LBNF immediately and visibly –Initiate construction of PIP II to enable 1.2MW –Initiate construction of Far Detector Infrastructure that can enable an international early science program 7/24/14G. Bock | Post P5 Planning8

Team Cardinal Report #1 Bob Tschirhart, Dan Bauer, Dmitri Denisov, Steve Holmes, Elaine McCluskey, [Jim Strait], Peter Wilson One interim report from the group

Observations Can run without yearly deficits by stretching PIP-II completion to 2025 and deliver on Mu2e, LHC upgrades, PIP-II and Cosmic Projects. LBNF construction simply does not fit before 2024 in a close- to-flat growth model for the Fermilab budget, and there is no prioritization among projects that can fix this problem. US-LBNF requires a “$250M-ish” construction bump in the frame for the 40kT cavern. The construction bump will not increase or impact the Fermilab or OHEP headcount and occurs on the roll-off of the LCLS-II Project. Potential partners in the construction bump include South Dakota and private donors. Construction and delivery of detector modules and infrastructure will follow in the 2020’s and would be largely funded by non-DOE partners. 7/24/14G. Bock | Post P5 Planning10

Some observations There will be some redirection to projects from muon campus, SRF, MAP, etc Operations assessment needed. Looking at ‘re-directing’ some of the research resources in the nearterm to the short baseline experiments for example Rough assessment indicates we have approximately the right overall staff size…about 30-40% of staff working directly on projects at the peak Aging workforce will impact even short term program: Need a comprehensive succession plan –Started integrated approach to cyro engineer and mechanical recruitment and targeted hiring –Scientific targeted hiring underway –Technical workforce will rely on contract help, but needs significant targeted succession planning of key positions –We have not worked out the detailed SWF/M&S balance—need to do that over the next few years 7/24/14G. Bock | Post P5 Planning11

More observations Within the operations line there has been ~30M already on ‘project-like activities muon campus, SRF, MAP, et Operations assessment needed. What is the right number of FTE’s to run a growing near term program LBN costs have a large component of conventional construction Aging workforce will impact even short term program: Need a comprehensive succession plan –Started integrated approach to cyro engineer and mechanical recruitment and targeted hiring –Scientific targeted hiring underway –Technical workforce will rely on contract help, but needs significant targeted succession planning of key positions –We have not worked out the detailed SWF/M&S balance—need to do that over the next few years Office of Integrated Planning and Performance Management established 7/24/14G. Bock | Post P5 Planning12

Improving Performance – Integrated Planning Office of Integrated Planning and Performance Management (IPPM) is developing an integrated planning process for business planning that executes the laboratory vision. A preliminary resource analysis to align the laboratory with the P5 plan was performed by modeling resource needs –Labor profiles for projects were superimposed on estimates of the work force needed for laboratory operations and research The resource analysis will be repeated quarterly as estimates improve and projects are baselined IPPM will develop requirements for a more comprehensive planning system that accounts for budget planning, lab-wide resource planning, and facilities planning. 7/16/2014Nigel Lockyer | Fermilab Annual Laboratory Plan13