Institution board (Chairman) Conference committee (Chairman) Editorial board (Chairman) Resource manager Upgrade SC (Chairman) DPG coordination Project.

Slides:



Advertisements
Similar presentations
RPC calibration D. Piccolo INFN Napoli. Calibrations Electronic test –Channels check –Strip pattern for trigger check –Threshold test –Synchronization.
Advertisements

Project Manager P. Paolucci deputy/deputy Run Coordinator G. Pugliese deputy Run Coordinator G. Pugliese deputy DPG D. Piccolo K. Bunkowski DPG D. Piccolo.
RPC project Upgrade phase I Pierluigi Paolucci. RPC system in the forward region The forward region of the RPC project consists of: 4 disks equipped with.
Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi deputy Run Coordinator L. Benussi deputy DPG D. Piccolo K. Bunkowski C.
Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi H. Shahzad N. Zaganidis Run Coordinator L. Benussi H. Shahzad N. Zaganidis.
Project Manager P. Paolucci M. Tytgat & G. Pugliese Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi H. Shahzad N. Zaganidis.
RPC tasks and manpower P. Paolucci. DPG Not covered tasks 7/12/10RPC IB - Pigi Paolucci2 DPG 2011 (FTE)2012 (FTE) WBM0.70.3Berzano* + ? Offline.
RPC project chart Pigi Paolucci. RPC structure Project Manager1 0 level Deputies - Resource Manager2 0 level Istitution – Editorial – Conference2 0 level.
Clara Gaspar on behalf of the LHCb Collaboration, “Physics at the LHC and Beyond”, Quy Nhon, Vietnam, August 2014 Challenges and lessons learnt LHCb Operations.
Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi deputy Run Coordinator L. Benussi deputy DPG D. Piccolo K. Bunkowski C.
EENP2 Annual meeting January 2014 Ain Shams University, Cairo The Europe Egypt Network for Particle Physics SEVENTH FRAMEWORK PROGRAMME Marie Curie.
RPC Trigger Software ESR, July Tasks subsystem DCS subsystem Run Control online monitoring of the subsystem provide tools needed to perform on-
RPC project status Pigi Paolucci. RPC project news P. Paolucci is the new project manager for 2011/2012 We are working on the 2011/2012 organization of.
RPC CONSOLIDATION WORKSHOP Pigi Paolucci INFN of Napoli.
10/02/2015 DT Shifts for Run II 2015 DT Detector Online Contact (DOC): - Bologna: Daniele Fasanella, Giuseppe Codispoti, Gianni Masetti - Torino: Linda.
Data Quality Monitoring for CMS RPC A. Cimmino, D. Lomidze P. Noli, M. Maggi, P. Paolucci.
MoA 2010 – RPC project G. Iaselli P. Paolucci. 2010: Unique RPC project composed by: Barrel, Endcap and Upgrade M&O 2010 Peking University3 Korea4 India3.
July 7, 2012 D0 Collaboration Organization TeV Working Groups Physics R. Hirosky, C. Schwanenberger Physics Groups Spokespersons G. Bernardi D. Denisov.
MuonDPG/RPC M. Maggi INFN Bari. DQM tool for the DCS data Control Analysis Tool (CAT) by Cimmino, Lomidze, Paolucci, Polese To 1.Make custom DCS data.
A. Cimmino - P. Paolucci - G. Polese / DCS meeting DQM tool for the DCS data What the RPC community needs: 1.Make online/offline DCS data.
RPC project status report RPC IB meeting 28 June 2011 Pigi Paolucci.
Report to the collaboration Yifang Wang IHEP Progress of the construction –SSM: Valve box successful, magnet cool down in mid June –Mechanical structure.
ALICE ITS Coordination Board 16 July 2013 L. Musa 1.
P. Paolucci - I.N.F.N. di Napoli 1 MTCC meeting May 06 HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV) 6/40  15% A3512N (HV) 10/10 
Databases E. Leonardi, P. Valente. Conditions DB Conditions=Dynamic parameters non-event time-varying Conditions database (CondDB) General definition:
RPC project status report RPC IB meeting 29 march 2011 Pigi Paolucci.
CMS Databases P. Paolucci. CMS DB structure HLT-CMSSW applicationReconstruction-CMSSW application FronTIER read/write objects.
1 st RPC General Meeting 29 March 2011 Pigi Paolucci RPC project status.
Detector Diagnostics Calibration Analysis Ped/LED/Laser RadDam Analysis Detector Optimization Lumi Detector Performance Monitoring DQM On/Offline Prompt.
A.Golunov, “Remote operational center for CMS in JINR ”, XXIII International Symposium on Nuclear Electronics and Computing, BULGARIA, VARNA, September,
TriDAS Equipment database Equipment database is partially built (Oracle). Currently consists of 2 separate databases.  DB I – database containing.
Clara Gaspar, March 2005 LHCb Online & the Conditions DB.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
Pierluigi Paolucci - INFN of Napoli 1 Official Muon talks at 2006 Conferences 1.10th Topical Seminar on Innovative Particle and Radiation Detectors – 1-5.
Technical Board Meeting, 14/06/07 Kristján Gulbrandsen, NBI 1 Progress on and Status of the Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr.
Introduction CMS database workshop 23 rd to 25 th of February 2004 Frank Glege.
1 Status and Outlook of the RPC Commissioning Marcello Maggi/INFN-Bari.
NEC Varna sep 12-18, 2005 A. Marinov Andrey Marinov On behalf of the CMS Forward RPC Collaboration Y. Ban, J. Cai, H. Liu, S. Qian, Q. Wang, Y. Ye, J.
W.Van Doninck Re-scope TDR August 2008 The forward RPC system (TDR) China Korea Pakistan Gap production Korea Gap production Korea Front-end electronics.
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
Only Three stations up to  = 1.6 RE i/3 REi/2 REi/1 RPC RE restoration.
CMS Experiment at the LHC, CERN Date Recorded: :21 CET Run/Event: / Candidate Collision Event Report from Belgium Michael Tytgat.
Muon Institution Board 29 March 2011 Pigi Paolucci RPC project status.
MoA and M & O-B Pigi Paolucci. Introduction The RPC endcap and barrel project were merged in an unique project in the 2009 and so we don’t have a long.
DQM for the RPC subdetector M. Maggi and P. Paolucci.
Pigi Paolucci & Anna Colaleo – RPC project 2012 RPC M&OB scrutiny Anna Colaleo (INFN-Bari) RM Pierluigi Paolucci (INFN-NA) PM 1.
Yu. Guz 21/04/20061 Database usage by calorimeters Yu. Guz IHEP Protvino.
Clara Gaspar, April 2006 LHCb Experiment Control System Scope, Status & Worries.
RPC M & O-B status Pigi Paolucci. Introduction 2008: RPC project budded from the barrel and forward 2009: M&OB token of 5 KCHF (but INFN 163 KCHF) The.
4 st RPC General Meeting 28 June 2011 Pigi Paolucci RPC project status.
DQM for the RPC subdetector M. Maggi and P. Paolucci.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
1 James N. Bellinger 26-Feb-2008 DCOPS DAQ Control Main DAQ Runs on Linux Data directly to Oracle Controlled via DIM Errors presented via DIM PVSS component.
G. Dissertori ETHZ CMS Electronics ECAL Detector Control System : Status Report G. Dissertori ETHZ
The Control and Hardware Monitoring System of the CMS Level-1 Trigger Ildefons Magrans, Computing and Software for Experiments I IEEE Nuclear Science Symposium,
CMS Muon detector from LHC to HL-LHC Pigi Paolucci INFN Napoli 1P. Paolucci (CMS group of Napoli) - Jan 2015.
P. Paolucci G. Pugliese M.Tytgat
Standards University Editorial Board
TC activities.
Concluding remarks E. Migneco
EU Institution Board 1 representative of each participating institute
Handling online information in the LHCb experiment
23 Barrel chambers and 12 Endcap chambers
Preparation of the CLAS12 First Experiment Status and Time-Line
RPC Detector Control System
RPC Detector Control System
DQM for the RPC subdetector
RPC Detector Control System
KICK OFF meeting - project presentation
23 Barrel chambers and 12 Endcap chambers
Presentation transcript:

Institution board (Chairman) Conference committee (Chairman) Editorial board (Chairman) Resource manager Upgrade SC (Chairman) DPG coordination Project Manager Deputy PM Operation Deputy PM Up scope Technical coordination Electronics coordination Run coordination Production Coordinator Operation BranchUp-scope Branch

Inst. Board Hoorani (PK) Conference committee Sijn Qian(CHI) Piccolo (IT) Konecki (PL) Paolucci (IT) Van Doninck (BE) Chair Upgrade SC XXYY Korea Maggi (IT) Konecki (PL) Iaselli (IT) Colaleo (IT) Van Doninck (BE) Hoorani (PK) Buontempo (IT) Sharma (CERN) Paolucci (IT) XXYY Pugliese (IT) XXYY Lalit (IN) XXYYGent (BE) Operation BranchUp-scope Branch

Operation Gas Calibration Monitoring PVSS Monitoring XDAQ Monitoring DQM Training Run Quality Documentation DPG Online L1 Trigger Readout Cond DB TTU DCS PVSS DQM Simulation Analysis Reconstruction Technical Coordination Gas system HV-LV Detector Trigger Electronics Production HPL Gap Electronics Assembly Infrastructure Service Commissioning Integration