AGENDA PROJECT OVERVIEW PAST AND PRESENT YOUR VALUES FOR TRANSIT NETWORK CONCEPTS.

Slides:



Advertisements
Similar presentations
Blueprint for Transportation Excellence Downtown CAG January 16, 2014.
Advertisements

Cellular Mass Transit (CMT) CMT4Austin.org. SOLUTION: Cellular Mass Transit Circulator Routes would converge on each Transit Center.
SR 50/UCF Connector Alternatives Analysis Orange County Board of County Commissioners January 13, 2015.
CRENSHAW CORRIDOR FINAL ANALYSIS By: Ivan Gonzalez March 14 th, 2011.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Route Design Unit 4: Service Planning & Network Design.
Community Transit Solutions for the Suburbs APTA Annual Meeting September 30, 2013.
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved Chapter 11 Mass Transit.
Cheryl Thole, Jennifer Flynn CUTR/NBRTI, Senior Research Associates Transit in GIS Conference September 14, 2011 St. Petersburg, Florida.
Recent Evidence on Mass Transit Demand Ian Savage Northwestern University.
King County Metro Long Range Public Transportation Plan Kirkland Transportation Commission_ April 10, 2015.
1 Presentation to TAC June 17, 2009 Overview of Rapid Bus Measures and Effectiveness And Case Studies.
1 Research go bus Impact Study TRB National Transportation Planning Applications Conference Atlantic City, May 2015.
Short Range Transit Improvement Plan CITY OF HIGHPOINT Sounding Board Meeting Educational Session 101 May 29, 2014.
South/West Corridor Improvements Service and Facility Alternatives September 9, 2014 Planning & Project Development Committee March 3, 2015.
Summary of Fare Change Feedback and Proposal Hillary Foose Director, Communication & Marketing.
TRB Transportation Planning Applications Conference Houston, Texas May 2009 Ann Arbor Transportation Plan Update-- Connecting the Land Use & Transportation.
Greater Mankato Transit Redesign Study Study Overview and Initial Existing Conditions September 2011 In association with: LSA Design and Public Solutions.
Transportation leadership you can trust. presented to TRB Planning Applications Conference presented by Vamsee Modugula Cambridge Systematics, Inc. May.
TRB/APTA 2004 Bus Rapid Transit Conference When is BRT the Best Option? the Best Option? 1:30 – 2:40 p.m. Paul Larrousse Director, National Transit Institute.
Redesigned schedules signaled riders to the new transit network and differentiated from old information. Schedules were color coded to easily identify.
Envision Central Texas Presentation Cellular Mass Transit (CMT) by Richard Shultz Concerned Citizen March 24, 2008.
00 Metropolitan Transit System Transit Serving Point Loma September 23, 2008.
1 Presented to the Transportation Planning Board October 15, 2008 Item 9 Metrobus Priority Corridor Network.
Kickoff Meeting for Imperial Valley College/San Diego State University Transit Shuttle Analysis September 14 th, 2015 c.
Siskiyou County Short Range Transit Plan Draft Final Report Presentation to the Steering Committee LSC Transportation Consultants.
1 Mountain Metropolitan Transit Sustainability Committee March 20, 2009 Presented By: Sherre Ritenour & Tim McKinney.
Serving a “Rainbow” Ridership – Designing and Providing High-Quality Public Transit for a Demographically Diverse Population Lyndon Henry COMTO Conference.
Center for Urban Transportation Research | University of South Florida Developing Customer Oriented Transit Performance Measures National Transit GIS Conference.
Downtown Shuttle (D-Link) Interlocal Agreement Transportation and Trinity River Project Committee October 26, 2015.
Project Background  Several recent initiatives have helped transform the system in positive ways – New brand and logo – New website and real-time bus.
Fairfax County Comprehensive Transit Plan and Transit Development Plan Update Fairfax County Comprehensive Transit Plan and Transit Development Plan Update.
Defining Alternative Scenarios MTC Planning Committee and ABAG Administrative Committee May 13, 2011.
Transit Choices BaltimoreLink Ad-hoc Committee Meeting January 12, 2016.
CRENSHAW CORRIDOR ANALYSIS By: Ivan Gonzalez. Background - - Expo Line scheduled to open in Opportunities exist for transportation projects to.
ANN ARBOR AREA TRANSPORTATION AUTHORITY Scio Township Area Transit Plan DRAFT – January 2015.
Board of Supervisors Transportation Committee June 25, 2013 (6/18 presentation draft) Proposed High Quality Transit Network Concept 1.
Community Outreach Spring A New Way to Think Transportation vs. Mobility Photo credits: Top right, Richard Masoner, Flickr; bottom right: Wldehart,
1 Update on Transit in West Kelowna District of West Kelowna - November 12, 2013 Matthew Boyd – Senior Transit Planner Steve Harvard – Senior Regional.
Increasing Success & Credibility of Your Service Through End-User Involvement.
Preliminary Gold & Northwest Corridors Service Plan 1.
GRTC Bus Rapid Transit Project July 17, Agenda 1.BRT Concept 2.Project Goals 3.Project Benefits 4.Project Corridor 5.Proposed Multimodal Access.
Transportation Fee FY2016 January 16, Services Provided by Transportation Stinger Buses - Three routes with 10 buses operating weekdays and two.
Indianapolis Public Public Hearing – Proposed 2014 Budget Thursday, August 15, 2013 Transportation Corporation.
Service Development Process 1. Our mission: To meet our constituents’ present and future public transit needs by offering safe, clean, reliable, courteous,
Regional Transit Framework Study Regional Council September 24, 2008.
Our Seniors, Our Streets, Our Schools TAM Listening Tour 2010.
SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Geary Bus Rapid Transit Project Presentation to the San Francisco.
Comprehensive Route Network Analysis
GMT NEXT GEN TRANSIT PLAN PROJECT OVERVIEW
Light Rail Enhancement Project
GMT NEXT GEN TRANSIT PLAN PROJECT OVERVIEW
Community Outreach Spring 2016.
D Line Station Plan Overview
HB 2017 Transit Advisory Committee January 19, 2018
Staten Island Bus Study Public Workshop
Transit Standards and Performance Measures
D Line Station Plan Overview
Transit Competitiveness and Market Potential
D Line Station Plan Overview
D Line Station Plan Overview
D Line and Station Plan overview
D Line Station Plan Overview
Annual Operating & Capital Budget
D Line Project Overview
Annual Operating & Capital Budget
CRENSHAW CORRIDOR SHUTTLE PLAN
1. Where should buses run and with what frequency?
AC Transit Proposed Fare Structure Revision & Pricing Changes
Draft Fiscal Year Bus Service Plan
HRT Workshop: Transit Strategic Plan and Aug-Dec working items
Presentation transcript:

AGENDA PROJECT OVERVIEW PAST AND PRESENT YOUR VALUES FOR TRANSIT NETWORK CONCEPTS

VTA’S NEXT NETWORK REDESIGN OF VTA’S TRANSIT NETWORK CONNECT TO BART (FALL 2017) IMPROVE RIDERSHIP (PRODUCTIVITY) INCREASE FAREBOX RECOVERY RATE BUS LRT

PROJECT SCHEDULE SUMMER 2016COMMUNITY MEETINGS FALL 2016COMPILE COMMUNITY INPUT LATE 2016DRAFT NETWORK PLAN RELEASED EARLY 2017COMMUNITY REVIEW OF DRAFT PLAN SUMMER 2017BOARD ADOPTS FINAL NETWORK PLAN

MEDIA COVERAGE “VTA PROPOSES CHOPPING ROUTES IN MOUNTAIN VIEW” - KEVIN FORESTIERI, MV VOICE “STAGGERING DROP IN RIDERSHIP SIGNALS DRAMATIC CHANGES” - GARY RICHARDS, MERCURY NEWS

MEDIA COVERAGE “THROWING VTA UNDER THE BUS” - SCOTT HERHOLD, MERCURY NEWS “VTA BOARD TO VOTE SOON ON BUS CUTS” - MATT BIGLER, KCBS

+12% POPULATION -13% REVENUE HOURS -23% RIDERSHIP TRENDS

FAREBOX RECOVERY RATE San Diego Seattle Portland San Francisco Denver Los Angeles Salt Lake City Sacramento AC Transit VTA FAREBOX RECOVERY RATE YEAR

THE RIDERSHIP RECIPE FREQUENT ALL-DAY SERVICE FOLLOWING PATTERNS OF: DENSITY WALKABILITY LINEARITY PROXIMITY

High PRODUCTIVITY ( Riders / Op. Cost ) WHY FREQUENCY? FREQUENCY HAS TRIPLE PAYOFF: TRANSIT IS ALWAYS COMING SOON TRANSFERS ARE SHORT FREQUENT SERVICE CREATES RELIABILITY

WHY ALL-DAY? VTA RIDERSHIP IS NOT VERY PEAKED LOWER INCOME PEOPLE, STUDENTS AND PEOPLE IN DENSE URBAN CENTERS, RELY MOSTLY ON ALL-DAY SERVICE.

DENSITY HIGHER RIDERSHIP LOWER RIDERSHIP

WALKABILITY HIGHER RIDERSHIPLOWER RIDERSHIP

LINEARITY HIGHER RIDERSHIP LOWER RIDERSHIP

PROXIMITY HIGHER RIDERSHIP LOWER RIDERSHIP

IS HIGHER RIDERSHIP WHAT YOU WANT?

THE PURPOSE OF PUBLIC TRANSIT RIDERSHIP GOAL: THINK LIKE A BUSINESS FOCUS WHERE RIDERSHIP POTENTIAL IS HIGHEST COVERAGE GOAL: THINK LIKE A SOCIAL SERVICE ACCESS FOR AS MANY PEOPLE AS POSSIBLE <> RIDERSHIPCOVERAGE

THE PURPOSE OF PUBLIC TRANSIT 70% RIDERSHIP 30% COVERAGE VTA TODAY

DISCUSS: YOUR TRANSIT PRIORITIES HOW DO YOU BALANCE: RIDERSHIP DIRECTNESS TRANSFERS SPAN COVERAGE FREQUENCY STOP SPACING PEAK SERVICE FARES PUBLIC SUBSIDY WEEKDAYS ALL DAYS

NETWORK CONCEPTS ALL NETWORK CONCEPTS: CONNECT TO BART REALLOCATE BART EXPRESS BUSES EXPAND GRID NETWORK EXPAND WEEKEND SERVICE USE SAME SERVICE HOURS

NETWORK CONCEPTS NOT SHOWN BUT STILL THERE: VTA EXPRESS NETWORK CALTRAIN AND ACE SHUTTLES FLEX SERVICE

PLEASE LEARN FOUR COLORS RAPID. EVERY 15 MIN OR BETTER AND WIDELY SPACED STOPS EVERY 15 MINUTES EVERY 30 MINUTES EVERY 60 MINUTES FREQUENT NETWORK

HOW FAR CAN JANE TRAVEL BY TRANSIT AND WALKING IN… 15 MINUTES 30 MINUTES 45 MINUTES 60 MINUTES CURRENT

HOW FAR CAN JANE TRAVEL BY TRANSIT AND WALKING IN… 15 MINUTES 30 MINUTES 45 MINUTES 60 MINUTES NETWORK 70

HOW FAR CAN JANE TRAVEL BY TRANSIT AND WALKING IN… 15 MINUTES 30 MINUTES 45 MINUTES 60 MINUTES NETWORK 80

HOW FAR CAN JANE TRAVEL BY TRANSIT AND WALKING IN… 15 MINUTES 30 MINUTES 45 MINUTES 60 MINUTES NETWORK 90

ACCESS TO JOBS

ACCESS TO RESIDENTS

TRANSIT ACCESS FOR EXISTING RIDERS

DISCUSS: NETWORK CONCEPTS WHICH NETWORK CONCEPT DO YOU PREFER?

VISIT US ONLINE ADD YOUR VOICE

DISCUSS: CURRENT TRANSIT SERVICE WHAT ARE THE MAJOR CHALLENGES FACING VTA? WHY DO YOU/DON’T YOU TAKE THE BUS? WHAT COULD/SHOULD VTA CHANGE?

WHY ALL-DAY? VTA SERVICES ARE MORE CROWDED IN MIDDAY THAN PEAK

HIGHER FREQUENCY High PRODUCTIVITY ( Riders / Op. Cost ) WHY FREQUENCY? HIGHER PRODUCTIVITY