SD-HCAL technological prototype: services Nick Lumb Lyon, 3 February 2011.

Slides:



Advertisements
Similar presentations
M.PEGORARO Grounding Workshop 24th Jan 08 DT GROUNDING & SHIELDING Presented by A. BENVENUTI.
Advertisements

David Emschermann DCS Workshop – PI Heidelberg – 22/01/2007 How to power up the TRD David Emschermann Physikalisches Institut Universität Heidelberg updated.
The ALICE TRD - HVDistribution System A. Markouizos, P. Mantzaridis, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis, M. Vassiliou Athens University ALICE.
1 Daya Bay Muon system Installation Workshop, Daya Bay, March 22, Daya Bay RPC Gas System Installation Plan Changguo Lu Princeton University.
MICE - Detector Safety/Integration. MICE - Detector Safety/Integration – Detectors external to Magnetic Volume  Detectors external to magnetic volume.
Walls crates cables gas chambers electronics CERN adb.
BaBar/LST Meeting Dec 8, 2003K. Honscheid, Ohio State University Module Assembly Quality Control High Voltage Ohio State Status Report.
Don Lynch 9/15/05 HBD Safety Review 1 Mechanical Design And Installation Hadron Blind Detector (HBD) Don Lynch.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics, cable Muon upgrade in a nutshell.
DSS Advisory Board Christoph Schäfer Rack Safety System.
A* candidate for the power supply Wiener MPOD-LV crate w/ remote control only (except for local on/off switch) Type “EC LV” Front or rear connections (reverse.
Low Voltage Power Requirement of TOF FEEs. Maximum tray. Low Noise:  Periodic and Random Distortion (PARD) < few mV RMS Floating.
Susanne Kersten, Wuppertal University November 21/22, 2013.
Update on Ongoing Tungsten Digital HCAL Beam Tests Erik van der Kraaij CERN LCD.
Vladimir Frolov for Torino group. Experimental activities: The system for testing the MRPC in the Torino INFN laboratory has been fully mounted and checked;
GENPRO Electrics & Electronics. . Switch Mode Power Supply-Output : 100A / 60 V-6KW GENPRO Electrics & Electronics.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Progress towards a technological prototype for a semi-digital hadron calorimeter based on glass RPCs Nick Lumb Paris, 8 October 2010.
Gas Coordination Panel 24/08/2004 Flammable Gas Installation Requirements, Interlocks, etc. F.H.
André Augustinus OPC news, versions to use on behalf of Sorina Popescu.
Progress towards a technological prototype for a semi-digital hadron calorimeter based on glass RPCs Nick Lumb International Linear Collider Workshop Beijing,
February 24, 2003PDR on Muon Elx Services - A. Lanza1 MDT – TGC power supply system HV distribution Cabling and connectors Specifications for distributors.
SD-HCAL technological prototype – Chamber and cassette production Nick Lumb Lyon, 3 February 2011.
TOF Gas System Project Overview. Content Prototype for Aging tests done for RPC’s TOF Gas System: parameters and module layouts. Special Technology: channel.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
HV-Splitter for RENO Project S. Stepanyan, 김우영 경북대학교 Y.Kim Sejong University May-2008.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
BKLM RPC Signal & Ground Schematic Gerard Visser, Indiana University (for the barrel KLM team) 10th B2GM, 11/2011 magnet structure GND 7mm FOAM 3mm GLASS.
1 Stave 0 and QA plan UniGe-UniBe meeting, February 10 th 2012 D. Ferrère, A. La Rossa, Y Takubo.
A. Ranieri / RPC-CMS Pre-loaded profile Synchronization & Control Board (SCB) The RPC electronics will consist of the FE board plus the Synchronization.
E.Guschin (INR,Moscow) 17 July 2007 CALO commissioning group meeting CERN Status of PS/SPD LED system.
January 15, 2003Richard Talaga1 High Voltage Distribution for RPCs Simple Model of Detector & HV Specifications & Requirements Simple HV Distribution Layout.
HBD Gas and QE Monitoring Craig Woody BNL HBD Working Group Meeting October 19, 2005.
Status of NA62 straw electronics Webs Covers Services Readout.
CERN Single Phase Prototype Initial Discussion on Power/Space Requirements Terri Shaw Neutrino Platform July 30, 2015.
K.WyllieElectronics meeting 29/05/061 RICH Power Supplies & Grounding Thanks to Johan Morant Paolo Baesso Xavier Le Gouard.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
NA62 straw tracker DCS Straw tracker overview Bulk power supply Power supply distribution and monitoring LV + monitoring HV Temperature monitoring Gas.
DCS Workshop 17 June 2002 PHOS DCS status Serguei Sadovski.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
24/03/2010ALICE TOF General Meeting March TOF hardware and data taking 2010 Andrea Alici Museo Storico della Fisica e Centro Studi e Ricerche “Enrico.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
EOS and type I Prototype Service Modules Mike Dawson (Oxford), Rob Gabrielczyk (RAL), John Noviss (RAL) 19 th January 2015 ATLAS Upgrade Activities, Oxford.
Preparation for production phase Web – New web with HV pigtail qualified (?) – Installed on 2 views in Technical run Very little effect on noise; detector.
S. K. PalDCS WORKSHOP 17 JUN 2002 FRONT VIEW PMD Layout and Design Two planes: Veto + PreShower Gas detector with hexagonal cells Cell cross section: 0.22.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
22/May/02 JCOP meeting G. De Catatldo-A.Franco INFN Bari Italy 1 The Control System of the HMPID up to the end of 2001 ; 2002: The FSM toolkit, Hierarchy.
 94 LVPS Packages mounted 4’-25’ from the front-end electronics.  4 modules per package. u +5V& -5V “Digital”, +5V & -5V “Analog” 18 A 1A 18A 18Amps.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
Belle-II bKLM RPC Readout Power & Ground Discussion 12 th Belle II General Meeting Gerard Visser Indiana University CEEM 7/24/2012.
HF ROBOX PRR3 Apr 2003E. Hazen HF Front-End Electronics ● System Description – Overview – PMT Board, ROBOX, Patch Panel – Signal Cable, Front-end boards.
Detector Control for the Insertable B-Layer Susanne Kersten Wuppertal University ATLAS Upgrade Workshop, February
TOF Low Voltage and High Voltage Systems Vahe Ghazikhanian UCLA Department of Physics and Astronomy V. Ghazikhanian July 21, 2005.
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
LKr status R. Fantechi.
RD51-WG X June test beam experience: useful information for October
W A T Supplying system test with external supplies
Mini-drawers, FE-ASIC , Integrator
Chamber Design and Integration RE3/1 and RE4/1
Pierluigi Paolucci - I.N.F.N. Naples
RPC HV&LV status Introduction HV power supply tender
TPC Detector Control System
RPC HV-LV project Introduction RPC description Requirements
*** Series 3RS Version 1, ***
Presentation transcript:

SD-HCAL technological prototype: services Nick Lumb Lyon, 3 February 2011

Nick Lumb What we need  HV supplies  LV supplies  HV cables  LV cables  Readout cables  Gas distribution system  Gas pipes  Well-defined management of all cables + pipes (see talk of François)

Nick Lumb HV supplies (1)  SY1527 controller crate Up to 16 modules  A1526 modules 6 chan 15kV, 100μA  Rental from CERN pool under discussion (Ghent)

Nick Lumb HV supplies (2)  Back-up solution: Iseg DPS- Mini series  0-5 V  0-10 kV  Low profile: could be mounted on cassette if B-field version can be developed  Present baseline would be to mount in crate and bring HV cables to detector  Control and monitoring being developed in-house

Nick Lumb LV supplies  Without power pulsing, cassette LV consumption = 6A  50 cassettes -> 300 A  In-hand: 3 x ZUP6-120 Lambda power supplies (120A each), 3U and 1/3 19” 3 x Genesys A Lambda power supplies (200A) each, 1U and 19”  Each can be remotely controlled (RS-232, RS- 485)  Each has remote sensing capabilities

Nick Lumb Cables  All cables must be fire-retarding and halogen-free! (CERN rules)  Cable length ~5m  Not yet purchased / produced! Ghent will organize for HV Louvain will organize for LV  One LV cable per cassette: splitter required on cassette (Louvain)  LV distribution boxes with switching also desirable upstream (Louvain) PS -1 PS -2 PS -3 Cassette #1 Cassette #50  Suitable HDMI read-out cable identified and will be purchased shortly (Vincent)

Nick Lumb Gas distribution system Local French company 40+ independent channels Individual flow adjustment Ensures accurate mixing of gases Conforms to CERN safety rules (ATEX zone II) System is built

Nick Lumb Gas pipes  Limited space → plastic pipes (ø6) to patch-panel (short lengths)  From PP to rack may be plastic of flexible SS