“702 KAR 4:160, Capital construction process” 1.  To be developed as procedures document for K-12 school construction projects  Allows KDE to update.

Slides:



Advertisements
Similar presentations
1 Solicitations/Advertisements Solicitations/Advertisements
Advertisements

THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Program Controls Systems & Processes Board of Trustees Workshop October 11, 2005.
Change Order Missouri Local Programs How to Complete a Change Order & Get it Approved.
Field Orders on Construction Contracts Guidance Document CLC-8 May 13, 2013.
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
Agenda Introduction Advisory Circular Changes Consultant Selection Procedures Contract Format and Provisions Methods of Contracting and Allowable Costs.
Historically Underutilized Business Program Texas Department of Insurance Special Deputy Receiver Program January 2008.
U.S. Pretrial Services and Probation Office Northern District of Ohio.
OCR Payment Process Training 01/17/2012. Article 9 – Compensation and Payment General Conditions – Article 9 – 9.1 Preconstruction Stage Compensation.
Alternative Project Delivery
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
Marcy Mealy Procurement Specialist CDBG Program
Rail Freight Assistance Program (RFAP) S ETTING THE S TAGE FOR THE F UTURE Rail Transportation Assistance Program (Rail TAP) RFAC Meeting April 28, 2010.
For West Virginia Department of Education DISCLAIMER This PowerPoint presentation serves only as a snapshot of purchasing regulations. Please visit the.
1890 FACILITIES GRANT PROGRAM National Extension and Research Administrative Officers’ Conference (NERAOC) May , 2011.
Review of 2010 Biennial Audit of Capital Projects Cyndi Fout Project Services Director February 28, 2011.
Office of Business Development Training
Selection of Contractor – Step 5 June 2015 Final PD Training FMD WUSM 6/15/15 1.
Model Procurement Documents for Architectural Services [NAME] [PLACE] [DATE]
Large Public Works Projects and the General Contractor/ Construction Manager (GC/CM) Procedure: A New Way to Save Money, Time and Aggravation.
Sole Source Training.
Finance Officer Certification
Project Delivery Overview June 2015 Final PD Training FMD WUSM 6/15/15 1.
School District Purchasing. Purchasing Authority Arizona Statutes Arizona Statutes Arizona Administrative Code Arizona Administrative Code  Primary source.
Policy 7003 Review BCPS Facilities Task Force – Policy Subcommittee Report July 16, 2015.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
Design Build, Job Contracting, or Construction Manager at Risk In early 2000 the legislators added an alternate way to accelerate construction project.
COMPLIANCE WITH GRANT IMPLEMENTATION PROCEDURES TxDot Grant Fund Project.
By: Carol Martineau, Acting Assistant Manager, Aircraft Maintenance Division, AFS-301 Date: June 7, 2015 Federal Aviation Administration ASA Conference.
OFFICE OF INDEPENDENT EDUCATION & PARENTAL CHOICE Monitoring and Reporting 2009 CSP Grant OFFICE OF INDEPENDENT EDUCATION & PARENTAL CHOICE Monitoring.
STATE STATUTES AND REGULATIONS Kentucky Department of Education Division of District Support Services District Funding & Reporting Branch.
Professional Services Contracts in conjunction with Organizational Excellence Made Easy.
Procedural Requirements For Force Account Work on Federal and State Projects 2015 ACCA Conference Orange Beach, Alabama.
U.S. General Services Administration Term Contracts Drand Dixon Sales Contracting Officer Federal Acquisition Services Drand Dixon Sales Contracting Officer.
PROCUREMENT SERVICES DEPARTMENT “How We Do Business”
Request For Proposals (RFP) Process Board of Directors Special Meeting January 29, 2014.
IDENTIFYING THE STRENGTHS & WEAKNESSES OF YOUR CONSTUCTION PROJECT McCune Construction Services Group, L.C.C.
Budget Committee Workshop February16, Oregon’s local budget law is a group of statutes that require local governments to prepare and adopt annual.
Life Cycle Cost Model Update Preliminary Report Joint Legislative Audit & Review Committee January 4, 2007 Stephanie Hoffman and Keenan Konopaski.
Commonwealth Self Bonding Program by the Department of General Services – Division of Engineering and Buildings Department of Treasury – Division of Risk.
Consultants' Competitive Negotiation Act Acquisition of professional architectural, engineering, landscape architectural, or surveying and mapping.
1 Smart Schools Bond Act Completing the Smart Schools Investment Plan
Contract Training Class I
CAREER TECHNICAL EDUCATION FACILITIES PROGRAM Cycle 2 Conversions.
Project Delivery Business Operations Overview June 2015 Final PD Training FMD WUSM 6/15/15 1.
Budget Workshop: Fiscal Policies, Process, and Budget Guidelines Board of Governors April 21, 2005.
Smart Schools Bond Act High-Tech Security Projects Protecting Our Greatest Assets Conference December 2.
Smart Schools Bond Act Investment Plan Submission Information and Review Process Presentation to Regional Partners Hosted By: Capital Region BOCES October.
ACCOUNTING FOR CAPITAL PROJECTS Financial Policies and Procedures for the Capital Project Delivery Process Office of the CFO.
Construction Management At Risk Process
Small Purchase of Professional Service Providers Administrative Rule R
Contractors Equipment Insurance A brief overview.
Procurement of Professional Services.  Professional Services:  Architects, Engineers  Surveyors  Geotechnical engineers  Nonprofessional Services:
Office of Management and Enterprise Services Central Purchasing Division Keith Gentry Contract Manager
Smart Schools Bond Act Update Education Summit & Expo June 13, 2016 Presenter: Stephen McNally NYSED.
Compliance with CCNA F.S..  Advertisement  Longlist  Shortlist  Request for Proposal  Scope of Services Meeting  Technical Proposal Review.
Chapter 14 Budgeting.
Correcting Ministerial & Clerical Errors
PROJECT DELIVERY METHODS
Correcting Ministerial & Clerical Errors
Montclair State University Affirmative Action Requirements
Designers’ Manual Overview and Chapter Contents
THE OFFICE OF PROCUREMENT CONTRACT TRAINING MAY 2018
Project Delivery Systems
Doing Business with Sno-Isle Libraries
Cost Containment Working Group Board Update
Directed Change Constructive Change
Construction and Facilities Program October 12, 2012
Presentation transcript:

“702 KAR 4:160, Capital construction process” 1

 To be developed as procedures document for K-12 school construction projects  Allows KDE to update specific procedures, when needed  KDE to form Committee of Stakeholders for annual review 2

 Added statutes: KRS Chapter 45A, , , , , , , , , , , 323A.010, (7), ,

 Added: change event; construction documents; contractor; design professional; GESC; KBE; major renovation; minor project; qualified provider  Removed (utilize statute definitions): Architect; contract documents; division; KERA; moveable equipment  Expanded: emergency; fixed equipment; record documents 4

 Added: Guaranteed Energy Savings Contracts (GESC)  Removed:  Items to send to KDE and justification info  Revoking BG-1 for inactivity  Reworded eligible projects from DFP  KDE process BG-1 in 30 days (instead of 60 days)  Minor & major project  Superintendent can notify KDE for emergencies 5

 Added: site acquisition; lease info (from plans & specs section); certificate of liability insurance (from architectural services); GESC oversight  Removed: model space requirements (listed in section 6)  Reworded/Moved:  Lease info (from plans & specs section);  Certificate of liability insurance (from architectural services)  Design professional services & CM oversight  Bid process defined in statute  Simplified oversight of construction administration and construction contract close-out  Use contract for liens 6

 Added: language in place of AIA specific docs: “prepare and provide documents and services required by contract, laws, and industry standards as prescribed by the AIA. The KDE may request clarification on documentation which does not comply.”  Removed: specific AIA docs; KDE contract approval criteria specifics; streamlined design professional submission list (full list of submissions to be listed in Best Practices); “giving consideration” language  Reworded/Moved:  Moved board responsibilities and submissions to Section 3  Used similar language for design professional services as in CM  Board-approved term used 7

 Added: language in place of AIA specific docs: “prepare and provide documents and services required by contract, laws, and industry standards as prescribed by the AIA. The KDE may request clarification on documentation which does not comply.”  Removed: specific AIA docs; KDE contract approval criteria specifics; streamlined CM submission list (full list of submissions to be listed in Best Practices); number of months for construction phase  Reworded/Moved:  Moved board responsibilities and submissions to Section 3  Used similar language for CM as in design professional services 8

 Added:  Entrance and right–of-way improvements from Kentucky Transportation Cabinet  Removed : formal submission of board minutes; specific list of construction documents; performance specs  Reworded/Moved:  Increased maximum gross areas of Model Program Space  115% for elementary (formerly 110%)  120% for middle & high (formerly 115%)  Reformatted list of agency notifications  Moved lease info to Section 3 9

 New section added to regulation Section 8 – Construction Bidding, Bond Sale, & Contracting  Added over 10%  Removed: Bid specific directions  Reworded/Moved: List of document submissions for all projects and additional list of document submissions for projects that are bid  Note: GESC projects are not bid 10

 Added: KDE approval is based on contingency amount available  Removed: AIA document reference; Language is “Board-approved changes in the contract scope of work shall be submitted using industry standard forms, including the KDE Change Order Supplemental Information Form…”  Reworded/Moved: Cumulative cost submission; increased change order approval amount to $25,000 (from $7,500) 11

 Added: Reference to statutes  Removed: AIA document reference Section 11 – Construction Dispute Resolution  Updated: utilize contract language 12

 Added: summary of all purchase orders and change orders for each contract Section 13 – Penalties  No change 13

 Added:  RFP for GESC  KDE Purchase Order Summary Form  Removed: AIA documents  Reworded/Moved: List is in alphabetical order 14

 Added:  Project Name and Site Address  Building ID Number  Construction Delivery Method  District’s Procurement Standard  Removed:  Page 2 – Program Space Square Footage  Board Order Attachment Not Required (District to Maintain)  Reworded/Moved:  Page 3 – Proposed Plan to Finance Application becomes Page 2 15

 Added:  Project Type Section  Energy Efficient Design Section (KRS and KRS )  Energy Efficient Design Features Lists Selection List  Removed:  Board Order Attachment Not Required (District to Maintain) 16

 Added:  Board of Education Designee Signature  Removed:  Board Order Attachment Not Required (District to Maintain) 17

 Added:  Page 2 – Project Closeout  Section D – Project Completion & Inventory Update  Section E – Reconciliation of Final Project Cost  Removed:  Board Order Attachment Not Required (District to Maintain) 18

 Added: Ranges for larger projects:  $5M - $10M = 5.6%  $10M - $20M = 5.5%  $20M - $30M = 5.4%  $30M - $40M = 5.3%  $40M - $50M = 5.2%  $50M - $60M = 5.1%  $60M+ = 5.0%  Removed: Deleted embedded A/E Max Fee Guidelines document from RFP for A/E Services document  A/E Max Fee guidelines Form is now stand-alone document  Reworded/Moved:  Reformatted header and footer 19

 Added:  Cost tracking table, including contingency balance  Cost breakdown table for labor, materials, profit, overhead  Signatures of District Finance Officer, Architect, & CM  Reworded/Moved:  Reformatted project descriptor information  Cost breakdown detail to be included for Change Orders => $25K (used to be for all Change Orders)  Reformatted header and footer 20

 Added: Ranges for larger projects:  $10M - $30M = 1.9%  $30M - $60M = 1.8%  $60M+ = 1.7%  Removed:  Deleted embedded CM Max Fee Guidelines document from RFP for CM Services document  CM Max Fee guidelines Form is now stand-alone document  Deleted range for projects starting at $1M with 5.75% fee  Reworded/Moved:  Condensed ranges, retaining higher  Reformatted header and footer 21

 Removed:  KDE Material Supplier Authorization Form  Purchase Order Form  Do not allow additional supplemental pages to be included  Reworded/Moved:  General formatting and clarification changes  Allows submission of 10 alternate bids (used to be 4)  Allows submission of 40 subcontractors, suppliers/manufacturers, and unit prices (used to be 10)  Allows submission of 50 purchase orders  Reformatted header and footer 22

 Added:  Purchase Order name and address  Billing and Shipping addresses  48-hour notification to contacts for receipt of goods  Removed:  Notary signature  Reworded/Moved:  General formatting and clarification changes  Reformatted header and footer 23

 Added:  Notary signature line  Reworded/Moved:  Update to be generic for use by A/E, CM, and GESC Qualified Provider  Reformatted header and footer 24

 Added:  BG # and Project Name  Specification Section  Vendor Phone and  Bill To Information  Contact Information for Delivery to Jobsite  Purchase Order Terms & Conditions  Removed: Category Number  Reworded/Moved:  School Changed to Facility Name  Purchaser Changed to Requested By 25

 New form added  Provides list of all Direct Purchase Orders made by district 26

 Added:  Additional firm identification info  Experience with KDE  School Funding  Documents Utilized with Contract  Certification with signature  Removed:  Appendix and attachments (documents are referenced)  AIA specific document numbers  Reworded/Moved:  General formatting and clarification changes  Clarified professional liability insurance requirement  Reformatted footer 27

 Added:  Additional firm identification info, including overview of firm  Experience with KDE  School Funding  Documents Utilized with Contract  Removed:  Appendix and attachments (documents are referenced)  AIA specific document numbers  Reworded/Moved:  General formatting and clarification changes  Clarified professional liability insurance requirement  Reformatted footer 28

 New form added  Provides districts with standard RFP document to request GESC project proposals 29