EIS Operation Planning H. Hara (NAOJ) 2007 Dec 10.

Slides:



Advertisements
Similar presentations
XRT Instrument Capabilities Ed DeLuca, Leon Golub & Jay Bookbinder SAO.
Advertisements

Helioseismology by Hinode(Solar-B) Takashi Sekii (NAOJ)
Hinode/EIS Data Products and Archive Access Jian Sun (MSSL)
COSPAR E July 22, Paris revised for Nobeyama Symposium 2004 October 29, Kiyosato Takeo Kosugi (ISAS/JAXA, Japan)
1 Hinode Coordinated Observations: Coronal Cavities On February 23, 2012, a coronal cavity and associated prominence was observed by Hinode. XRT data clearly.
Solar-B FPP 1 Ted Tarbell, TRACE Operations 3 February 2003 MODA Mtg, ISAS The TRACE Model for Operations Ted Tarbell
2007/12/08-10 Hinode Workshop / Hinode 専題研討会 1 XRT Observation Planning R.Kano (NAOJ) and XRT team.
Hinode / EIS Hinode Data Analysis Workshop, Paris, Nov 2007 Dr Peter Young, Rutherford Appleton Laboratory Science operations with EIS Dr Peter Young Dr.
2006/4/17Extended Solar-B mission onboard control and data handling (data recorder, downlinks, observation tables…) Toshifumi Shimizu ISAS/JAXA.
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center Phase E Kickoff Meeting February 23, 2007.
XRT X-ray Observations of Solar Magnetic Reconnection Sites
GLAST LAT ProjectManager’s Face to Face - ISOC, 17 March GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Manager’s Face.
The Hinode EUV Imaging Spectrometer: In-Orbit Performance and Early Results STEREO-SECCHI Consortium Meeting Paris, 5 th – 8 th March, 2007 L. Culhane,
2007 March 61 The SECCHI Campaign Jean-Pierre Wuelser SECCHI Consortium Meeting Orsay.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.3 Verification and Validation 1 Gamma-ray Large Area Space Telescope.
990901EIS_RR_Mgmt_OV.1 Management Overview Dr. George A. Doschek EIS US Principal Investigator Naval Research Laboratory Phone: , FAX:
NORMA GOMEZ, MBA, MSN, RN, CNN Unique Challenges for the Nephrology Professional in Managing Change.
Solar-B Mission Preparation Len Culhane – UK EIS Principal Investigator Louise Harra – UK Project Scientist David Williams – UK EIS Chief Observer Mullard.
Solar-B Global DataGrid 21 st September 2006 UK e-Science All Hands Meeting 2006 RALMSSL Tim Folkes Elizabeth Auden Jens Jensen Paul Lamb Matthew WildMatthew.
SOLAR-B data flow scheme with emphasis on SOT Masumi Shimojo SOLAR-B project/NAOJ.
1. 2 Purpose of This Presentation ◆ To explain how spacecraft can be virtualized by using a standard modeling method; ◆ To introduce the basic concept.
“Joint planning” session Preliminary instrument operation & science plans of SOT/XRT/EIS for several months after the launch. Instrument checkout and Performance.
At A Glance VOLT is a freeware, platform independent tool set that coordinates cross-mission observation planning and scheduling among one or more space.
1 SPSRB Decision Brief on Declaring a Product Operational Instructions / Guidance This template will be used by NESDIS personnel to recommend to the SPSRB.
1 SpaceOps 2002 Autonomous Operations For The Swift Mission T3-47 John Ong/Swift Software Systems Manager NASA/GSFC Code 582/ Mike Rackley/Swift.
Teacher Evaluation and Professional Growth Program Module 4: Reflecting and Adjusting December 2013.
SCIENCE & MISSION SYSTEMS 9 December 2008Dr. Jonathan Cirtain Hinode Deputy Project Scientist Hinode AR and Flare Observations Solar Cycle 24 Hinode Science.
Final Version Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Mission Operations Tim Rykowski Jeffrey Hosler May 13-17, 2002.
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Planned Organization of ROCC Operations I. Musso.
Science - Coronal heating - Coronal structure / dynamics - Elementary processes in Magnetic Reconnection Mission instruments - Optical Telescope / Vector.
Solar-B Global DataGrid Update for AstroGrid SAG 10 RALMSSL Tim Folkes Elizabeth Auden Jens Jensen Paul Lamb Matthew WildMatthew Whillock Len Culhane Elizabeth.
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
The GLAST Science Support Center’s Role in Supporting the User Community [24.10] Thomas E. Stephens (GSFC/L-3GSI) for the GLAST Science Support Center.
Solar-B Mission Status, Operations and Planning Len Culhane – UK EIS Principal Investigator Louise Harra – UK Project Scientist David Williams – UK EIS.
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center STEREO SWG April 2008 Meudon, France.
Solar-B SOT/FPP 1 SOT April 2006Ted Tarbell SOT Collaboration & Data Policy Ted Tarbell, for the Science Working Group 18-Apr-2006.
GLAST Science Support CenterAugust 9, 2004 Users’ Committee Meeting GSSC USER SUPPORT David Band – GSSC.
1 SMOV Proposal Process Initial Submission through Flight George Chapman Merle Reinhart Tony Roman February 21, 2001.
SSC SI Data Processing Pipeline Plans Tom Stephens USRA Information Systems Development Manager SSSC Meeting – Sept 29, 2009.
GLAST Science Support CenterNovember, 2005 GSSC User Committee Meeting Tools for Mission and Observation Planning Robin Corbet, GSSC
Swift HUG April Swift data archive Lorella Angelini HEASARC.
Apr 17-22, NAOJ External alignment with X-Ray Telescope (XRT) and EUV Imaging Spectrometer (EIS) Y. Katsukawa (NAOJ) and SOT team.
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center STEREO SWG March 27-28, 2007.
Phoenix Campus Faculty Refresher Training. This workshop will provide faculty with updated knowledge and tools necessary to be effective in the classroom.
1/15/02Bowman/Harch1 CONTOUR Science Ops Update Ann Harch Cornell University (607) Alice Bowman Applied Physics.
Aquarius Mission Simulation A realistic simulation is essential for mission readiness preparations This requires the ability to produce realistic data,
Archiving, Distribution and Analysis of Solar-B Data Masumi Shimojo SOLAR-B Project ・ NSRO/NAOJ and The SOLAR-B MODA Working Group Masumi Shimojo SOLAR-B.
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center STEREO SWG November 2007 Pasadena, California.
The Solar-B Mission Tetsuya Watanabe (NAOJ) November 2005 Stereo/Solar-BScience Planning Workshop at Turtle Bay The Solar-B Mission Tetsuya Watanabe.
1. 2 Purpose of This Presentation ◆ To explain how spacecraft can be virtualized by using a standard modeling method; ◆ To introduce the basic concept.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
GLAST Science Support CenterAugust 10, 2004 Users’ Committee Meeting The Project Data Management Plan David Band – GSSC.
HSC Queue Mode Implementation Plan ~ Stage I, II, III ~ Tae-Soo Pyo Subaru Telescope /01/15.
Scenario use cases Szymon Mueller PSNC. Agenda 1.General description of experiment use case. 2.Detailed description of use cases: 1.Preparation for observation.
Data Coordinating Center University of Washington Department of Biostatistics Elizabeth Brown, ScD Siiri Bennett, MD.
1 Mission preparation Fred Lahuis SRON / Leiden Observatory MIRI NL Meeting ASTRON, 3 th June 2010.
Planning Flare Observations for Hinode/EIS
I&T&C Organization Chart
Fundamentals of Information Systems, Sixth Edition
Solar-B Science Working Group
Detlef Koschny Research and Scientific Support Department ESA/ESTEC
ATom data management plan:
GLAST Large Area Telescope:
GIRO usage and GSICS Lunar Observation Dataset Policy S. Wagner
ISAS Solar Physics Yohkoh (1991- ) Hionotori ( )
Collaboration File Share Update and Discussion
Launch and On-orbit Checkout
NSS Instrument Project Tollgate Coordinator
MDP / DHU - DR Usage vs downlinks -
Integration & Test Instrument Operations Coordination
Presentation transcript:

EIS Operation Planning H. Hara (NAOJ) 2007 Dec 10

EIS Science Operation Science -Team core science -Initial science targets -Proposal from users Preparation for EIS Science Operation Check of Obs. Table using PM Observation in orbit Downlink stations (USC, SVAL) JAXA data storage (DARTS) Data Reformat EGSE Data check - Obs. table - S/C CMDs Analysis Outcome ISACS-PLN Uplink station Spacecraft Merging EIS SO in S/C operation EIS Planning EGSE (EISCO) Final S/C plan Observation Planning Data for analysis Level0 data Level2 data Telemetry Plan approved for EIS operation Data centers Users Feedback Line selection Exp. duration Compression FOV size etc. Data rate Compression Instrument CAL Feedback eis_prep for level0- to-level1 conversion is ready in SSW.

Observation Proposals See details in To broaden community involvement in the Hinode mission the science team is offering the opportunity to participate in the definition and development of the observing program. This can take the form of either collaborative investigations with other ground or space based observatories or a request for a set of observational sequences to meet a specific scientific objective formulated by the requestor. To facilitate this program the Hinode team has created a group of seven Scientific Schedule Coordinators (SSCs) to both review requests and assist requestors in preparing their plans. It is the policy of the Hinode Science Working Group that all observing requests that are consistent with the objectives of Hinode will be accepted. However it is strongly recommended that individuals discuss their proposed observations with one of the SSCs before preparing and formally submitting their request to ensure that their proposed observations are not already part of the core team's program. Please note that having your observation program selected and implemented does NOT entitle you to exclusive use of the data. The Hinode open data policy applies to all data. Where the observation program involves more than one instrument, the requestor should contact an SSC associated with his primary instrument. 55 Hinode Operation Plans (HOP) have been proposed.

Planning Constraints Nominal allocation of telemetry for EIS is 50 kbps. A study with higher data rate cannot run for a long time. The 24 hour planning period begins around 11 UT Hinode daily planning meetings occur at 01:30 UT 2-day weekend plans begin at around 11 UT Saturday Hinode is re-pointed every ≈ 6 hours for the XRT synoptics –an EIS study should be < 6 hours in duration Pointing information is needed for the daily meeting one day before the observations –small pointing adjustments are possible at the daily meeting on the observation day

Science Schedule Coordinators Chief Coordinators John M. Davis (john.m.davis (at) nasa.gov) Tetsuya Watanabe (watanabe (at) uvlab.mtk.nao.ac.jp) Scientific Schedule Coordinators - Instrument Specific Solar Optical Telescope (SOT) –Tom Berger (berger (at) lmsal.com) –Takashi Sekii (sekii (at) solar.mtk.nao.ac.jp) X-Ray Telescope (XRT) –Leon Golub (Golub (at) head.cfa.harvard.edu) –Kiyoto Shibasaki (shibasaki (at) nro.nao.ac.jp) EUV Imaging Spectrometer (EIS) –Len Culhane (jlc (at) mssl.ucl.ac.uk) –Tetsuya Watanabe (watanabe (at) uvlab.mtk.nao.ac.jp) –John Mariska (mariska (at) nrl.navy.mil)

For A New EIS Observation See details in A sequence of observation is called ‘Study’ in the EIS plan. A ‘Study’ consists of ‘Rasters’. A ‘Raster’ contains a ‘Line List’. Line Lists, Rasters, and Studies are created by users using software, EIS Planning Tool, in SSW (solar software). EIS Planning Tool

Flow of EIS Observations Prepare a Study using SSW by proposers. A Study file in the text format is sent to MSSL. to Khalid Al-Janabi: The Study is verified by the EIS proto-models at MSSL. The Study is registered in the EIS official database in SSW. The Study is set in a daily plan by EIS chief observers at ISAS. EIS in orbit observes the sun according to the Study description.

Preparation of EIS Observations Create Line Lists and Rasters –Can select and modify Line Lists and Rasters that have been registered in the official database. –IDL> eis_mk_raster Create Studies –Can select Rasters that have been registered in the official database. –IDL> eis_mk_study Create Daily Plan at ISAS by EIS CO –IDL> eis_mk_plan

IDL> eis_mk_raster

IDL> eis_mk_study

Timeline