LIU-ABT systems: SPS, W. Weterings M.J. Barnes, L. Ducimetière, N. Magnin, W. Weterings Acknowledgements: A Adraktas, M. Beck, G. Bellotto, S. Bouleghlimat,

Slides:



Advertisements
Similar presentations
PSB extraction and transfer kickers 01/10/2014 LIU-PS ABT review1 L. Ducimetière, L. Sermeus.
Advertisements

1/10/2014 LIU-PS ABT review1 T. Kramer, L. Ducimetiere, L. Sermeus.
Progress of the BEPCII Injection System Kang Wen.
Preliminary results and ideas for the SPS upgrade MDs on LHC beams in 2011 G. Rumolo on behalf of all the MD team (Elena, Thomas, Karel, Christina, Holger,
CURRENT STATUS OF CV INSTALLATIONS, WORKS DURING LS1 AND PROBLEMS ENCOUNTERED DURING START-UP NORTH AREA Bill Bannister / Jani Lehtinen EATM – 7 th October.
Injection Considerations for Scrubbing Run C. BRACCO, M.J. BARNES, W. BARTMANN, B. GODDARD, M. MEDDAHI, J. UYTHOVEN ACKNOWLEDGMENTS: M. DI CASTRO, M.DONZE,
Experience of High Voltage Conditioning of Kicker Magnets M.J. Barnes Acknowledgements: G. Bellotto, P. Burkel, H. Day, L. Ducimetière, T. Kramer, V. Gomes.
Matching and Synchrotron Light Diagnostics F.Roncarolo, E.Bravin, S.Burger, A.Goldblatt, G.Trad.
MKI Magnet Design, PT100 Sensor Locations & Heating Observations in 2011 M.J. Barnes Acknowledgements: H. Day, L. Ducimetiere, N. Garrel 23 November 20111M.J.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
Update on MKI Performance: TS3 to 02/10/2012 M.J. Barnes Acknowledgements: P. Adraktas, V. Baglin, A. Bertarelli, G. Bregliozzi, S. Calatroni, F. Caspers,
LHC beams in the SPS in 2014 H. Bartosik, G. Rumolo, G. Iadarola With the help from K. Kornelis, V. Kain and SPS OP crew.
Design and operation of existing ZS B.Balhan, J.Borburgh, B.Pinget B.BalhanDesign and operation of existing ZS SPS ZS Electrostatic Septum Upgrade Review.
1 July 11, 2008Mike Barnes, AB/BT Present Status and Future Plans for the MKD Beam Dump Kickers Acknowledgements: input gratefully received from Fritz.
HOW THE DUMP RESISTOR’S TANK LOOKS LIKE COOLING OF THE LHC ENERGY EXTRACTION RESISTORS G. Peón (ST/CV), K. Dahlerup-Petersen, G. Coelingh (AT/MEL) Air.
Status of the SPS impedance model C. Zannini, G. Rumolo, B. Salvant Acknowledgments: H. Bartosik, O.Berrig, G. Iadarola, E. Métral, N. Mounet, V.G. Vaccaro,
ELENA Vacuum System R. Kersevan, TE-VSC-IVM R. Kersevan, “ELENA Vacuum System”, - ELENA Project Review, Oct14-15, 2013, CERN.
Update of the SPS transverse impedance model C. Zannini, G. Rumolo, B. Salvant Acknowledgments: H. Bartosik, O.Berrig, F. Caspers, E. Chapochnikova, G.
Results of the argon beam test at Linac3 D. Küchler BE/ABP/HSL Including feedback from R. Scrivens and M. Bodendorfer.
Update on wire scanner impedance studies
The Stripping Foil Test Stand in the Linac4 Transfer Line
LIU-ABT systems: SPS B.Balhan, J.Borburgh, H.Day 20 th November 2015.
5 K Shield Study of STF Cryomodule Norihito Ohuchi, Norio Higashi KEK Xu QingJin IHEP 2008/3/3-61Sendai-GDE-Meeting.
LIU-SPS ZS Electrostatic Septum Upgrade Review held on M.J. Barnes & T. Kramer.
BI.DIS10: Magnets & generators R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November
Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) Dec.
Peter Hülsmann, GSI RF-Group, Tel: Task SIS18-1: h=2 Cavity P. Hülsmann GSI, Gesellschaft für Schwerionenforschung.
Discussion and preliminary conclusions LIU-SPS ZS Electrostatic Septum Upgrade Review M.J. Barnes.
R. Rosol, LIU-PSB review, 10 September BI.DIS Pulse generators R. Rosol, LIU-PSB review, 10 September Luc SERMEUS, Rodolphe ROSOL Laurent.
LIU and (E)YETS LIU-SPS Coordination Meeting 28/01/15 David Mcfarlane
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
Vacuum Devices for accelerator studies Bernard HENRIST CERN TE dept. – Technology Department VSC group – Vacuum Surfaces and Coatings OLAV III Oak Ridge.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
SBDS – MKDV/H: The new MKDV Generator and additional Magnet for BA5 installation V. Senaj, L. Ducimetière November 20 th 2015.
Feasibility of, and options for, the new MKE kicker concept M.J. Barnes, T. Kramer Acknowledgements: L. Ducimetière, B. Goddard, B. Salvant, J. Uythoven,
Technology Department. ZS Ion Trap Development G. Raffaele and R.A. Barlow Acknowledgements: B. Balhan, M.J. Barnes and B. Pinget 21/04/2015 TCM: ZS Ion.
LIU-ABT systems: SPS T. Kramer, E. Carlier, L. Ducimetiere, L. Sermeus, J. Uythoven LIU-IONS 4 th November /11/2014 SPS LIU-ABT Systems Review2.
The way to fast and "loss-free" SPS kickers E. Gaxiola With contributions from AB-BT-KSL section and F. Caspers, T. Kroyer, M. Timmins, J. Uythoven.
1)For existing systems, where the ferrite yoke needs to be shielded from the circulating beam, it is not generally possible to include ceramic tubes to.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
TE-CRG Activities D. Delikaris, TE-CRG.
Technology Department MKP status L. Sermeus, L. Ducimetière TCM 18 November 2014.
4/11/2014 LIU-SPS ABT review1 M.J. Barnes, L. Ducimetiere, T. Kramer, W. Weterings Acknowledgements: E. Carlier, G. Rumolo, B. Salvant, C. Zannini.
LIU-SPS planning – provisional LS1 / LS2 BLM, BPM MKE/MKDV/H aC 1 sextant aC 5 sextants RF 200 MHz LSS3 RF 200 MHz preparation RF 200 MHZ building.
Heating and Outgassing from MKP- L Magnet M.J. Barnes & L. Sermeus Acknowledgements: M. Beck, H. Bartosik, G. Bregliozzi, C. Pasquino, G. Rumolo, L. Vega.
PSB extraction and transfer kickers LIU TE-ABT review, 20 November L. Sermeus.
LIU Critical Key activities in Long Shutdown 1 (2013) LIU-PSB: assuming LINAC4 connection in LS2 –Beam dump consolidation If not done: operation will be.
SPS start up 2014 SPS OP. SPS changes during LS1 New transformers and 18kV cables for MPS. New function generators (FGC’s) with lots of new and different.
MKDV upgrade LIU-SPS ABT meeting V. Senaj, L. Ducimetiere, P. Faure November 4 th 2014.
26/11/2015 LIU-PSB meeting, Status of BE and BT kickers and septa 2 Extraction and Recombination Septa and Kickers status Jan Borburgh, M. Atanasov, W.
Vacuum System P. Chiggiato TE-VSC
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
MKI Performance During 2016 and Plans for EYETS
Present Status and Future Plans for the MKE Kicker Magnets
TE-MSC activities in SPS during LS2
LIU – EVM status and next steps
R. Kersevan, TE-VSC-VSM 30/06/2016
Hervé Allain, R. van Weelderen (CERN)
Electron cloud & vacuum pressure observations: 2011 proton run
Capacitive pick-up on MKP: why, when, who, resources, others
SPS EN-CV Planning LS (initial draft)
Acknowledgments: LIU-PT members and deputies, H. Bartosik
STUDIES OF THE STRIPLINE KICKER FOR BEAM EXTRACTION FROM THE CLIC DRs
Update on MKP Strategy ACKNOWLEDGEMENTS M.J. Barnes
LIU and TE/ABT/PPE activities
Also on behalf of V. Senaj & L. Ducimetière
MKI Operational Experience and Future Plans
Cooling aspects for Nb3Sn Inner Triplet quadrupoles and D1
Multiphysics simulations of impedance effects in accelerators
Cryogenic management of the LHC Run 2 dynamic heat loads
Presentation transcript:

LIU-ABT systems: SPS, W. Weterings M.J. Barnes, L. Ducimetière, N. Magnin, W. Weterings Acknowledgements: A Adraktas, M. Beck, G. Bellotto, S. Bouleghlimat, G. Bregliozzi, P. Burkel, E. Carlier, D. Comte, E. Chapochnikova, T. Fowler, H. Day, C. Pasquino, P.C. Pinto, G. Rumolo, B. Salvant, Y. Sillanoli, J. A. Ferreira Somoza, M. Taborelli, C. Zannini 20th November /11/2015 SPS LIU-ABT Systems Review: MKE2

Content Present MKE configurations Expected heating issues for HL-LHC type beams MKE4 reconfiguration during YETS Possible mass-upgrade of MKE magnets Budget and Spending Profile Manpower and Resources Vacuum – aC? E-field simulations 20/11/2015 SPS LIU-ABT Systems Review: MKE3

Present MKE6 Configuration 20/11/2015 SPS LIU-ABT Systems Review: MKE4 MKE6: 3 magnets, 1 PFN & 1 short-circuit. 33.1kV PFN nominal L10L8S3 Serigraphed 8C11 BEAM PFN Short Circuit Magnet #1 Magnet #2Magnet #3 Enamelled Flange Serigraphy: HV Plates Ferrite Serigraphy (200mm long “fingers”)

MKE4 Configuration 20/11/2015 SPS LIU-ABT Systems Review: MKE5 MKE4 from YETS : 4 magnets, 1PFN & 1 short-circuit. 30.7kV PFN nominal. Enamelled Flange BEAM PFN Short Circuit Magnet #1 Magnet #2 Magnet #3 Enamelled Flange Magnet # L1L9S6S7 Serigraphed 8C11 New Serigraphy 8C11 Serigraphed 8C11 Magnets in locations 41651/41654 to be exchanged/replaced by beam-pipe. o Clipper (initially) unused – installed but cold and no trigger; o Magnet S7 acceptance tested by VSC, & HV conditioning is successfully completed. Retain enamel flanges either side of MKE4 magnets; No damping resistor in bellows. As per pre-YETS present: 5 magnets, each with a PFN & TMR. 51.2kV PFN nominal L1L9S6S4L5 Serigraphed 8C11 Magnet #1 Magnet #2Magnet #3Magnet #4Magnet #5 Serigraphed 8C11 Enamelled Flange BEAM Note: L5 had vacuum leak on tank flange PFN TMR

Predicted power loss due to serigraphy peak as a function of frequency of the peak (σ=20 cm): 200 mm Courtesy of C. Zannini ~70% of total ~60% of total 180 mm 200 mm  50 MHz 180 mm  56 MHz Motivation to reduce length of serigraphy (new S7): 1)200mm serigraphy: 1650 W, with cooling water temperature of 28˚C  T=123˚C: close to Curie point of ferrite. Theory: power expected to half with 180mm serigraphy. 2)To test modified serigraphy on a single MKE before mass upgrade. Power deposition based on lab measurements: 1)Short-circuiting magnet increases (~16%) power deposition; 2)For 25 ns beam, 180 mm serigraphy gives ~8% lower power deposition than 200 mm. 1150W  ~95˚C ferrite. 3)For 50 ns beam, 180 mm serigraphy gives ~9% higher power deposition than 200 mm.1460W  ~112˚C ferrite. Notes: frequency of resonant peak is ~15% higher in measurements than in predictions, e.g. without capacitors or load: hence very important to check relative dissipation in MKE. Measured Real Impedance: Expected Heating Issue for HL-LHC type beams 20/11/2015 SPS LIU-ABT Systems Review: MKE6 Theoretical beam induced power deposition for: 25ns (50ns) beam and 1.1x10 11 (1.6x10 11 ) ppb  320W (230W). For HL-LHC, 25ns (50ns) beam and 2.5x10 11 (3.6x10 11 ) ppb  1650W (1150W). Courtesy of H. Day

MKE: Measured water temperature An average of Up and Down temperatures, for all MKE magnets in a system, show that MKE6 magnets (short-circuit) have ~16% higher temperature rise than the MKE4 magnets (terminated) – which is consistent with the impedance measurements in the lab. ΔT=15.2˚C ΔT=13.0˚C 20/11/2015 SPS LIU-ABT Systems Review: MKE7 Post YETS: Closely monitor absolute and relative, to other MKEs, temperatures, to determine effectiveness of new serigraphy.

MKE4-Reconfiguration Overview ECA4 plan – unused hardware Generator 4 kept as operational spare. 20/11/2015 SPS LIU-ABT Systems Review: MKE8

20/11/2015 MKE4: modifications during YETS /12/2015:  Replace 1 magnet (L5 – vacuum leak on tank) by 159mm diameter beam pipe;  Replace 1 magnet (S4) with spare magnet (S7) with 180 mm long serigraphy;  Reclose vacuum ready for pump-down. After 14/12/2015: - Two weeks of vacuum pumping in LSS4 during Christmas break; - Generators and control systems simplification in ECA4 carried out during W and W2 2016, in parallel with LSS4 activities; - In January, one week of HV DC magnet conditioning in LSS4 (3 DC cond. units exist, 2 in production) - Installation of magnet capacitors, entry boxes and cabling; - One week for control and protection systems commissioning in ECA4; - Three weeks of HV pulsed magnet conditioning; - Tests with beam, e.g. scan of MKE4 waveform, steering of transfer lines, etc… SPS LIU-ABT Systems Review: MKE9

20/11/2015 SPS LIU-ABT Systems Review: MKE10 25 ns Scrubbing (W25, 2015): Ecloud Ecloud is present in the MKEs with 25ns beam. Possible future development: coating the, aperture side, surface of the ferrites with Cr 2 O 3 or amorphous Carbon (aC) could eliminate Ecloud. Simulations indicate that this also reduces the Electric field adjacent to the serigraphy..

20/11/2015 Modification of Serigraphy and possible aC Coating SPS LIU-ABT Systems Review: MKE11 Serigraphy: length reduced, from 200 mm to 180 mm, by scraping with a knife and finishing with emery cloth. This process avoids the need to purchase new ferrite (estimated cost of ferrite: 45 kCHF/magnet). aC Coating: check influence of cooling ferrite to below Curie temperature in a magnetic field; aC trial on a piece of ferrite required to check for issues of adhesion; aC coating of parts from the machines: OK if they are in the μS/hr range; Initial simulations indicate a significant reduction of electric field, adjacent to serigraphy, by applying a thin layer of aC – but instantaneous power dissipation??

LS 4LS 5Run 5 LS2 starting in 2018 (July)=> 18 months + 3 months BC LS3LHC: starting in 2023 =>30 months + 3 months BC Injectors: in 2024=>13 months + 3 months BC LHC schedule beyond LS1 Beam commissioning (BC) Technical stop (TS) Shutdown Physics (Extended) Year End Technical Stop: (E)YETS With the extra L-type spare (removed from MKE4 during reconfiguration)  2L+1S spares, i.e.: 3 MKEs, e.g. at MKE4, can be swapped during EYETS ; 3 MKEs, e.g. at MKE6, can be swapped during YETS /11/2015 SPS LIU-ABT Systems Review: MKE12 Run 2 Run 3

If experience with the 180 mm serigraphy shows all other MKE magnets should be modified: 3 remaining MKE4 [2L, 1S] or MKE6 [2L, 1S] could potentially be exchanged in an EYETS or YETS. Total of 9 or 10 MKEs to be upgraded: Following spending profile is: with new serigraphy, large seals for tank (~2 kCHF/magnet – also includes rough estimate for aC coating of ferrite (~5 kCHF/magnet); without new ferrite (assuming that serigraphy can be modified (shortened) by scraping off end of existing 200 mm serigraphy and using emery cloth) or valves. Estimated spending per year in kCHF: Year Total ? ? Spending Profile for Rebuilding MKEs Cooling option in purple. 20/11/2015 SPS LIU-ABT Systems Review: MKE13 Year PV EV 390 AC 1164 Metrics per year in kCHF:

Manpower/Resources After YETS there will be 3 spare MKE magnets [2L, 1S]. For rebuilding, testing etc. 6 (9 inc. spares) magnets and installing 6 magnets: ~ 20/29 person months with manual conditioning; ~ 15/22 person months with automatic conditioning Up to 3 person months for new automatic conditioning system for lab (+ some hardware)  good investment. No detailed manpower planning available yet - conceivable that additional manpower is needed. Assembly area for magnet and generator will be 867 (within controlled zone). HV-Test cage for system testing is needed For chiller system: 6 person months for design and installation. 20/11/2015 SPS LIU-ABT Systems Review: MKE14

Conclusions Estimates presented for reducing length of serigraphy for all installed MKEs & 3 spares; Consider trial of coating of aperture surface of ferrites e.g. with aC; A chiller would give additional safety margin (especially useful if bunch length < 20 cm); Replacing ferrite with a higher Curie Temperature version – expensive and probably not required; Vacuum valves – expensive therefore not included. 20/11/2015 SPS LIU-ABT Systems Review: MKE15

THANK YOU FOR YOUR ATTENTION!

Predicted power loss due to serigraphy peak as a function of frequency of the peak (σ=20 cm): 200 mm Courtesy of C. Zannini ~70% of total ~60% of total 180 mm 200 mm  50 MHz 180 mm  56 MHz Motivation to reduce length of serigraphy: 1)200mm serigraphy: 1650 W, with cooling water temperature of 28˚C  T=123˚C: close to Curie point of ferrite. 2)To test modified serigraphy on a single MKE before mass upgrade. Notes: frequency of the peak is higher in measurements than in predictions, e.g. without capacitors or load: a)new (180mm long) serigraphy: 49 MHz pred., 56 MHz meas. b)old (200mm long) serigraphy: 44 MHz pred., 50 MHz meas. Conclusions re power deposition from above measurements: 1)Short-circuiting magnet can significantly (~16%) increase power deposition; 2)For 25 ns beam, new (180 mm long) serigraphy is ~8% lower power deposition than 200mm long. 1150W  ~95˚C ferrite. 3)For 50 ns beam, old (200 mm long) serigraphy is ~9% lower power deposition than 180mm long.1460W  ~112˚C ferrite. Measured Real Impedance: Expected Heating Issue 20/11/2015 SPS LIU-ABT Systems Review: MKE 17 Courtesy of C. Zannini

Ferrite Temperature  MKEs are currently cooled with demineralised water (20-28˚C).  Water cooling allows the MKE to operate with ~twice the beam induced power deposition (ref: AB-Note BT (Rev.2)).  With the expected beam induced power deposition of 1.65kW/magnet for HL-LHC (with the present serigraphy), the estimated (actual) ferrite temperature is:  ~125˚C for 25ns beam (corresponds to the Curie temperature);  ~105˚C for 50ns beam (uncomfortably close to the Curie temperature).  Mixed (12˚C) or chilled (6˚C) water would give a reasonable reduction (up to ~20˚C) in ferrite temperature.  Back of the envelope calculations indicate that increasing the emissivity of the inside of the MKE tanks (as per the MKIs) could result in a significant radiated power (15-25%), further improving cooling of the ferrite – but current tanks could be radioactive, thus difficult to treat.  Samples of CMD10 ferrite have been obtained for evaluation for possible future use in the MKIs: CMD10 has a Curie temperature of ~250˚C. The CMD10 samples have been tested and Oked by the vacuum team. CMD5005/CMD10/CN20, or a mix of some of these, could give a significant thermal operating margin, for the MKEs, for HL-LHC beam. Equivalent to 8C11 CMD10 also has a saturation flux-density (Bs) greater than CMD5005 but has a lower u’ (acceptable for MKIs, but needs to be checked for MKEs) 20/11/2015 SPS LIU-ABT Systems Review: MKE18

Ferrite Power Deposition 20/11/2015 SPS LIU-ABT Systems Review: MKE19 For given properties of the ferrite (permittivity and permeability [which are frequency dependent]), the length/overlap of the serigraphy determines the resonant frequency.  Reducing the length of serigraphy from 200 mm to ~180 mm is expected to increase the resonant frequency from 44 MHz to 49 MHz, close to an optimum for 25 ns and 50 ns beams.  The total power deposition is expected to be reduced from ~1650 W to ~850 W for 25 ns beam, and ~1150 W to ~820 W for 50 ns beam: 850 W  80˚C estimated with 28˚C.  Measurements (on a single cell or MKE magnet?) are required to confirm the predictions and hence the optimum length of serigraphy. Measurements on an S-type magnet would leave an L–type spare. 230 mm (length of ferrite block) 200 mm length (presently) Predicted power loss due to serigraphy peak as a function of frequency of the peak (σ=20 cm): 200 mm Courtesy of Carlo Zannini ~70% of total ~60% of total

Budget breakdown (updated from Nov. 2014) The following assumes that MKE4 is kept as per present (5 terminated MKEs): 2 less MKEs are required for a short-circuit configuration.  Total budget for new serigraphy: ~30 kCHF/10 mags (including labour for removing end (~20mm) of present serigraphy, cleaning);  Total manpower (FSU) for assembly and installation: ~50 kCHF/10 mags (6 person months);  Modify lifting device to reduce radiation exposure of personnel: ~5 kCHF;  Total budget for new seals for vacuum tanks: ~20 kCHF/10 mags ;  Estimated total budget for aC: ~50kCHF/10 mags ;  Total budget for chiller system: ~80 kCHF (to be spent ~2018, depending on effectiveness of new serigraphy and/or desired thermal margin).  Detailed breakdowns to be done.  Total budget for new ferrite type is ~450 kCHF (expensive and not necessary if optimum serigraphy length reduces power deposition to ~850 W, as predicted).  Total budget for 2 valves per tank is ~500 kCHF (expensive for gain !). 4/11/2014 LIU-SPS ABT review20

20/11/2015 SPS LIU-ABT Systems Review: MKE21 Cost/Manpower: Chiller Chiller: Chiller (variable down to 6˚C) installed in tunnel, with a closed secondary cooling circuit; Disadvantage Condensation issues on magnet feedthroughs to consider (at low water temperatures); Advantages Magnets do not need to be rebuilt. Cost: approximate estimate of 40 kCHF per each of MKE4 and MKE6, including stainless- steel piping; Manpower: 6 person months for design and installation (parallel cooling circuits per extraction, where to put chiller, ….?) If optimized serigraphy is used, a chiller gives additional operating margin for ferrite heating (especially important if σ < 20 cm).