Meredyth Mine AL0078280 Winston County Inspected on 09-09-2011 By Ryan Baty.

Slides:



Advertisements
Similar presentations
1 Water discharge rate is monitored continually. 2 Sampling of stream and drainage water is made automatically or by grab sampling weekly while groundwater.
Advertisements

West Virginia Department of Environmental Protection Division of Land Restoration Special Reclamation Program Alyce R. Lee ERS III.
Chemical Analysis of Water
LOCAL IPP REGULATIONS SEWER USE ORDINANCES Sandra Diorka Director of Public Services Delhi Charter Township.
 Map the MS4 conveyances  Locate all outfalls  Conduct dry weather screening of outfalls  Develop & enforce an Illicit Discharge Ordinance in the.
Jennie Henthorn Henthorn Environmental Services LLC.
This presentation is an abbreviated version of the original PowerPoint presentation of June 23, This version was presented at the Commissioners’
Waste Water Recycling System- Effluent System D.Chakraborty.
Investigation Plan for the Omaha WWTP – Stage One update Dr Mark James, Aquatic Environmental Sciences Ltd.
The Process of Mining Ridge Road Elementary 3 rd Grade Rice’s Homeroom.
FORM 1014P – ANNUAL REPORT FOR SURFACE DISCHARGE.
Water Treatment Plant General Discharge Permit
Adopting the Pond What? We have a pond at our school? Where?
How to Build a Groundwater Model Activity Source Created by the USA Groundwater Foundation; modified from the Science Olympiad event, Awesome Aquifers.
1. 2 Figure 6-1. Schematic of the Twin Butte tailings disposal area.
Original image: 512 pixels by 512 pixels. Probe is the size of 1 pixel. Picture is sampled at every pixel ( samples taken)
Permits. The Process Plans are developed by an Architect or Engineer and presented to the Municipality – State Environmental Quality Review (SEQR) declaration.
Plant Science Research Center 2009 – 2010 Small Scale Pond Simulation.
Monet’s Bridge Monet’s Pond Monet noticed that in the bright sunshine its colour seemed to change from green to blue. Painting and photographs. Sample.
SEA LEVEL RISE IN MIAMI BEACH MIAMIBEACH. Seawall Construction.
SEA LEVEL RISE IN MIAMI BEACH MIAMIBEACH. Seawall Construction.
Side Of Play-Doh!!. The variables we tested were… Water pH and conductivity pH of the surrounding soil Tree inventory We measured the soil pH and inventoried.
US EPA Region IV Surface Coal Mining Field Activities Adventures in Mountain Top Mining / Valley Fill Chris Decker.
DEPARTMENT OF REGIONAL DEVELOPMENT, PRIMARY INDUSTRY, FISHERIES AND RESOURCES Mine Site Water Quality Monitoring Michael.
DEPARTMENT OF REGIONAL DEVELOPMENT, PRIMARY INDUSTRY, FISHERIES AND RESOURCES Water Management Planning An essential component of the MMP
Monitoring Plan and Volunteer Participation. Treatment Monitoring –Cost Initial operational/maintenance –Algal cover (monthly) Aesthetic acceptance (homeowners)
Cypress Springs Homeowner’s Association MSBU Presentation June 21, 2011.
1 Extracts were taken from nine leaf cells and the pH of each was measured. The results were as follows: 6.5, 5.9, 5.4, 6.0, 6.1, 5.9, 5.8, 5.6, 5.9 
Flow Through Turbidity Treatment Using Alum & Pam At The Orlando International Airport Project.
Type your question here. Type Answer Type your question here. Type Answer.
Nikolaus Sires ET-493 Advisor: Dr. Rana Mitra. Problem 1 The site of this senior project is a pond of approximately three acres. I desire to remove one.
Water Quality in Stormwater Retention Ponds on UWB Campus Rick Vos.
Review of Interventions ____________ CanZinco Ltd.
ANTIDEGRADATION and THE BENEFITS OF PUMP LOGS FOR BATCH DISCHARGES Given by: Dan Murray, Terrell Hendren and Josh Frazier.
1 Towns and reservoirs for aluminum dilution factor studies Settling velocity reservoir 2.
A3 Item W20a Coastal Commission February 2013 Hearing.
United nations /MAP/ TS 18-19/12/2003 Distribution of N-NO 3 [river Loire (1971 to 1997)]
Reservoir Findings and Sediment Sampling  The ACM is only along the berm  Small amounts of tires and debris were found in or on the floor  Two rounds.
Water Quality Monitoring on Larkin Creek St. Francis County, AR JL Bouldin RA Warby Arkansas State University.
Harrison Pond water level March to November 2009 The POND group took readings of the water level on the metre stick each week.
D D PC B Loose Roof End of Water x x x x Suction hose 6 posts x x Posts set Refuge chamber Sump with pump Door opened Door closed Water over knee deep.
E d ( ) L u ( ) c = a + b b tot = b f + b b IOP- Inherent optical property eg. absorption (a), scattering (b), attenuation (c) AOP- Apparent optical property.
Reed Contracting Concrete Plant (ALG active) November 8, 2012 Madison County Karl M. Ryan, inspector 1.
Picture taken by SVID employee on 9/27/2011. Truck belonging to DeRuyter Brothers, land applying liquid manure to a harvested corn field.
Town of Davie Utilities Department Renuka M. Bajnath John McGeary.
FIELD INVESTIGATION OF IN SITU LIME NEUTRALIZATION OF ACIDIC SEDIMENT
Water Supply (Fire Fighter II)
Unit 5: Solutions ppm and ppb.
Influent Contamination
Wastewater Characteristic Post Anaerobic Treatment
دعوه للتعرف علي موارد مصر و زياره اماكنها و التعرف علي
Permitting Requirements for Lagoons
Hanmer Springs Water Supply
Unit 5: Solutions ppm and ppb.
TEMPORARY STOPPING. TEMPORARY STOPPING BATTERY RAMCAR.
Well Testing Well Performance Tests Flow Profiles Packer Tests
Industrial( Bundang Power Plant) TDS : 170ppm
5.2% CH4 3 PPM CO 20.8% % CH4 3 PPM CO 20.8% 02.
5.2% CH4 3 PPM CO 20.8% % CH4 3 PPM CO 20.8% 02.
12 BRATTICE CLOTHS.
OVERCAST WALL DOOR OPEN
C.2.10 Sample Questions.
C.2.8 Sample Questions.
C.2.8 Sample Questions.
How to Use the Passive Treatment Sock
4 Step Simple Diagram Sample text Sample text Sample text Sample text
Blood glucose levels in chicken embryos.
Table 5. Water quality A3 well during pumping test
Sample Proofs 1. S>-M A 2. -S>-M A -M GOAL.
Brewery Wastewater Characterization
Presentation transcript:

Meredyth Mine AL Winston County Inspected on By Ryan Baty

Mining currently underway upgradient of pond 11.

Outfall at pond 11 not discharging. Pump and hose set up to pump from here to 12, then to 13.

Pond 12 was not discharging at the time of inspection. Water was being pumped out of pond 12, into pond 13.

Pumped water from 12 coming into pond 13.

Outfall at pond 13 was discharging at the time of inspection. Sample was taken for TSS and pH.

Pond 14 was not discharging at the time of inspection.

Pond 15 was not discharging at the time of inspection.

Pond 16 was not discharging at the time of inspection.