SuperB-DCH LNF SuperB Workshop – Dec 09 S ervizio E lettronico L aboratori F rascati G. Felici DCH Readout and Control System A (very) preliminary study.

Slides:



Advertisements
Similar presentations
KLOE II Inner Tracker - FEE Status Antonio Ranieri RD51 Collaboration Meeting Paris October 2008 INFN-Bari S ervizio E lettronico L aboratori F rascati.
Advertisements

On the development of the final optical multiplexer board prototype for the TileCal experiment V. González Dep. of Electronic Engineering University of.
6 Mar 2002Readout electronics1 Back to the drawing board Paul Dauncey Imperial College Outline: Real system New VFE chip A simple system Some questions.
Local Trigger Control Unit prototype
Ultrafast 16-channel ADC for NICA-MPD Forward Detectors A.V. Shchipunov Join Institute for Nuclear Research Dubna, Russia
Front-end electronics for Time Projection Chamber I.Konorov Outlook:  TPC requirements  TPC readout options  Options for TPC FE chips  Prototype TPC.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
Large Area, High Speed Photo-detectors Readout Jean-Francois Genat + On behalf and with the help of Herve Grabas +, Samuel Meehan +, Eric Oberla +, Fukun.
Development of novel R/O electronics for LAr detectors Max Hess Controller ADC Data Reduction Ethernet 10/100Mbit Host Detector typical block.
BESIII - ZDD S ervizio E lettronico L aboratori F rascati 1 FEE Block Diagram PM ≈ 3.5 mt (coax cable) X MHz Amplifier 1 of 16 channels ON-DETECTOR.
U niversity of S cience and T echnology of C hina Design for Distributed Scheme of WCDA Readout Electronics CAO Zhe University of Science and Technology.
BESIII Electronics and On-Line BESIII Workshop in Beijing IHEP Zhao Jing-wei Sheng Hua-yi He Kang-ling October 13, 2001 Brief Measurement Tasks Technical.
1 S. E. Tzamarias Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Readout Electronics DAQ & Calibration.
Second generation Front-end chip for H-Cal SiPM readout : SPIROC DESY Hamburg – le 13 février 2007 M. Bouchel, F. Dulucq, J. Fleury, C. de La Taille, G.
U N C L A S S I F I E D FVTX Detector Readout Concept S. Butsyk For LANL P-25 group.
Leo Greiner IPHC meeting HFT PIXEL DAQ Prototype Testing.
M. Lo Vetere 1,2, S. Minutoli 1, E. Robutti 1 1 I.N.F.N Genova, via Dodecaneso, GENOVA (Italy); 2 University of GENOVA (Italy) The TOTEM T1.
K.C.RAVINDRAN,GRAPES-3 EXPERIMENT,OOTY 1 Development of fast electronics for the GRAPES-3 experiment at Ooty K.C. RAVINDRAN On Behalf of GRAPES-3 Collaboration.
A Readout Electronics for MAPMT Matteo Turisini – E. Cisbani Italian National Institute of Health – INFN Rome 1 JLab/CLAS12 RICH Meeting - 16/Nov/2011.
September 8-14, th Workshop on Electronics for LHC1 Channel Control ASIC for the CMS Hadron Calorimeter Front End Readout Module Ray Yarema, Alan.
Leo Greiner IPHC DAQ Readout for the PIXEL detector for the Heavy Flavor Tracker upgrade at STAR.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
27 th September 2007AIDA design meeting. 27 th September 2007AIDA design meeting.
11th March 2008AIDA FEE Report1 AIDA Front end electronics Report February 2008.
HBD FEM Overall block diagram Individual building blocks Outlook ¼ detector build.
Muon Electronics Upgrade Present architecture Remarks Present scenario Alternative scenario 1 The Muon Group.
Leo Greiner PIXEL Hardware meeting HFT PIXEL detector LVDS Data Path Testing.
NUMI Off Axis NUMI Off Axis Workshop Workshop Argonne Meeting Electronics for RPCs Gary Drake, Charlie Nelson Apr. 25, 2003 p. 1.
DAQ/Trigger System proposal for the Angra Neutrino Detector Herman Lima Jr (18 May 2006) Centro Brasileiro de Pesquisas Físicas.
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
KLM Trigger Status Barrel KLM RPC Front-End Brandon Kunkler, Gerard Visser Belle II Trigger and Data Acquistion Workshop January 17, 2012.
Proposal for LST-based IFR barrel upgrade Roberto Calabrese Ferrara University Workshop on IFR replacement, SLAC, 11/14/2002.
HBD/TPC Electronics Status Works done to for a)Prototype detector readout b)Understand packing density and heat loading issues c)Address the overall system.
TPC electronics Status, Plans, Needs Marcus Larwill April
HBD/TPC Electronics Status Works done to for a)Prototype detector readout b)Understand packing density and heat loading issues c)Address the overall system.
1 19 th January 2009 M. Mager - L. Musa Charge Readout Chip Development & System Level Considerations.
Pisa - Apr. 28th, The Trigger System Marco Grassi INFN - Pisa.
Annecy, Carleton/CRPP, Colorado, Colorado State, LBNL, Maryland, McGill, MIT, Montreal, INFN Padova, INFN Pisa, Princeton, INFN Rome, UC San Diego, UC.
CBM-TOF-FEE Jochen Frühauf, GSI Picosecond-TDC-Meeting.
CLAS12 Central Detector Meeting, Saclay, 3 Dec MVT Read-Out Architecture & MVT / SVT Integration Issues Irakli MANDJAVIDZE.
Juin 1st 2010 Christophe Beigbeder PID meeting1 PID meeting Electronics Integration.
Drift Chamber Review Jefferson Lab 6-8 March 2007 CLAS12 Drift Chamber Electronics R. Chris Cuevas Group Leader -- Fast Electronics Jefferson Lab Physics.
SuperB-DCH Servizio Elettronico Laboratori Frascati DCH FEE TDR contents discussion SuperB CERN EDT Meeting – November 11 1 G. Felici.
SuperB DAQ U. Marconi Padova 23/01/09. Bunch crossing: 450 MHz L1 Output rate: 150 kHz L1 Triggering Detectors: EC, DC The Level 1 trigger has the task.
Vladimir Zhulanov for BelleII ECL group Budker INP, Novosibirsk INSTR2014, Novosibirsk 2014/02/28 1.
Overview of TPC Front-end electronics I.Konorov Outline:  TPC prototype development  Readout scheme of the final TPC detector and further developments.
October 12th 2005 ICALEPCS 2005D.Charlet The SPECS field bus  Global description  Module description Master Slave Mezzanine  Implementation  Link development.
SuperB-DCH Servizio Elettronico Laboratori Frascati DCH FEE LNF GM December 2011 LNF SuperB Workshop – December 11 1 G. Felici.
November 16th 2011 Christophe Beigbeder 1 ETD meeting PID Integration.
SuperB-DCH S ervizio E lettronico L aboratori F rascati 1LNF-SuperB Workshop – September 2010G. Felici DCH FEE STATUS Some ideas for Level 1 Triggered.
MADEIRA Valencia report V. Stankova, C. Lacasta, V. Linhart Ljubljana meeting February 2009.
Some thoughs about trigger/DAQ … Dominique Breton (C.Beigbeder, G.Dubois-Felsmann, S.Luitz) SuperB meeting – La Biodola – June 2008.
DAQ ACQUISITION FOR THE dE/dX DETECTOR
DCH FEE STATUS Level 1 Triggered Data Flow FEE Implementation &
ETD PID meeting We had many presentations dedicated to the PM test .
Kenneth Johns University of Arizona
PID meeting SNATS to SCATS New front end design
Calorimeter Mu2e Development electronics Front-end Review
ETD/Online Report D. Breton, U. Marconi, S. Luitz
DCH FEE 28 chs DCH prototype FEE &
Front-end electronic system for large area photomultipliers readout
VELO readout On detector electronics Off detector electronics to DAQ
SVT detector electronics
Front-end Electronics for the LHCb Preshower Rémi CORNAT, Gérard BOHNER, Olivier DESCHAMPS, Jacques LECOQ, Pascal PERRET LPC Clermont-Ferrand.
PID meeting Mechanical implementation Electronics architecture
TOF read-out for high resolution timing
SVT detector electronics
Electronics, Trigger and DAQ for SuperB: summary of the workshop.
TELL1 A common data acquisition board for LHCb
for BESIII MDC electronics Huayi Sheng
Presentation transcript:

SuperB-DCH LNF SuperB Workshop – Dec 09 S ervizio E lettronico L aboratori F rascati G. Felici DCH Readout and Control System A (very) preliminary study G. Felici

SuperB-DCH LNF SuperB Workshop – Dec 09 S ervizio E lettronico L aboratori F rascati G. Felici 1.The DCH readout BABAR experience (a short review of the upgraded readout system) 2.OL – Super-B DCH vs BABAR DCH 3.Super-B DCH FEE possible scenarios 4.Power dissipation, radiation environment and material budget 5.Conclusions Outline

SuperB-DCH LNF SuperB Workshop – Dec 09 S ervizio E lettronico L aboratori F rascati G. Felici BABAR FEE – DC DC numbers  Cylindrical (≈ 1.6 m external diameter, ≈ 2.75 m length)  Hex-cells (≈ 1.2 cm (radial dir) x 1.7 cm (azimuthal dir)  10 superlayers (4 layer each) – 4 axial – 6 stereo  7104 cells  He:Isobutane (80%/20%) gas mixture - 22 i.p./cm per mip - 44 electrons (total ionization)  Average charge per electron ≈ 8 fC (20% collected in first 10 ns) DC numbers  Cylindrical (≈ 1.6 m external diameter, ≈ 2.75 m length)  Hex-cells (≈ 1.2 cm (radial dir) x 1.7 cm (azimuthal dir)  10 superlayers (4 layer each) – 4 axial – 6 stereo  7104 cells  He:Isobutane (80%/20%) gas mixture - 22 i.p./cm per mip - 44 electrons (total ionization)  Average charge per electron ≈ 8 fC (20% collected in first 10 ns)

SuperB-DCH LNF SuperB Workshop – Dec 09 S ervizio E lettronico L aboratori F rascati G. Felici BABAR FEE – Block Diagram Requirements  Tracking (charged-particle momentum and event reconstruction)  dE/dx (particle identification)  Trigger (multi-charged-particle trigger for the BABAR detector) Requirements  Tracking (charged-particle momentum and event reconstruction)  dE/dx (particle identification)  Trigger (multi-charged-particle trigger for the BABAR detector) DATA  Gbits/sec OL TRIGGER  Gbits/sec OL ECS  Managed by DATA I/O modules (CAN standard) COMMANDS (sync, L1_accept, read_event, cal_Strobe  Managed by DATA I/O modules (1 Gbits/sec OL from ROM) DATA  Gbits/sec OL TRIGGER  Gbits/sec OL ECS  Managed by DATA I/O modules (CAN standard) COMMANDS (sync, L1_accept, read_event, cal_Strobe  Managed by DATA I/O modules (1 Gbits/sec OL from ROM)

SuperB-DCH LNF SuperB Workshop – Dec 09 S ervizio E lettronico L aboratori F rascati G. Felici BABAR FEE – Analog to Digital Board (ADB) High-bandwidth transimpedance amplifier (input impedance adjusted to terminate the sense wire transmission line impedance) + Discriminator 6 bits MHz BUFFER hold data 12.9 μs (192 sample clock cycle) 8 complete channels (amplitude + timing) BUFFER hold data 12.9 μs (192 sample clock cycle) 8 complete channels (amplitude + timing) RO BUFFER (4 events) 2.2 μs (32 samples) 8 complete channels (amplitude + timing) RO BUFFER (4 events) 2.2 μs (32 samples) 8 complete channels (amplitude + timing)

SuperB-DCH LNF SuperB Workshop – Dec 09 S ervizio E lettronico L aboratori F rascati G. Felici BABAR FEE – ReadOut Interface Board  ELEFANT continuously buffers data for 12 µsec (L1A latency)  On L1A ELEFANT moves data to event buffer 32 samples/ch x 8 channels  Event buffers are drained via an 8b 15 MHz bus  256 bytes / ADB  17 µsec + up to 17 µsec overhead  Number of channels/ADB = 45/48/60 (outer/middle/inner assemblies)  ELEFANT continuously buffers data for 12 µsec (L1A latency)  On L1A ELEFANT moves data to event buffer 32 samples/ch x 8 channels  Event buffers are drained via an 8b 15 MHz bus  256 bytes / ADB  17 µsec + up to 17 µsec overhead  Number of channels/ADB = 45/48/60 (outer/middle/inner assemblies) 48 chs  48 x 32 Bytes ≈ 100 µsec ≈ 10 kHz (Real BW < 10 kHz because overhead) 48 chs  48 x 32 Bytes ≈ 100 µsec ≈ 10 kHz (Real BW < 10 kHz because overhead)

SuperB-DCH LNF SuperB Workshop – Dec 09 S ervizio E lettronico L aboratori F rascati G. Felici BABAR FEE – ReadOut Interface Board  Decode commands from Fast Control and perform appropriate operation L1 Accept Event Read Sync & Calibration... Subsystem specific commands ELEFANT IC configuration & calibration ….  Decode commands from Fast Control and perform appropriate operation L1 Accept Event Read Sync & Calibration... Subsystem specific commands ELEFANT IC configuration & calibration …. READOUT PROCEDURE 1. Readout ELEFANT chip into local FIFOs 2. After a fixed delay the master data controller starts FIFO data readout 3. Data are sent out on a 2-bit 30 MHz connection to the Data I/O READOUT PROCEDURE 1. Readout ELEFANT chip into local FIFOs 2. After a fixed delay the master data controller starts FIFO data readout 3. Data are sent out on a 2-bit 30 MHz connection to the Data I/O Feature EXtraction Data Reduction: 32 Bytes  8 Bytes  2 Bytes status word  2 Bytes charge  List of 2 Bytes TDC hits (over threshold signals Feature EXtraction Data Reduction: 32 Bytes  8 Bytes  2 Bytes status word  2 Bytes charge  List of 2 Bytes TDC hits (over threshold signals NO Zero Suppression 48 chs  48x8 Bytes (average)  Mbits/sec ≈ 50 µsec ≈ 20 kHz (Real BW < 20 kHz because overhead) NO Zero Suppression 48 chs  48x8 Bytes (average)  Mbits/sec ≈ 50 µsec ≈ 20 kHz (Real BW < 20 kHz because overhead)

SuperB-DCH LNF SuperB Workshop – Dec 09 S ervizio E lettronico L aboratori F rascati G. Felici BABAR FEE – Data Input/Output Module (DIOM) 116 DATA INPUT/OUTPUT MODULE 1. Decode the READ EVENT and propagates it to FEAs 2. ELEFANT chips are readout into local FIFOs 3. After ≈ 20 μs (fixed delay) a GRANT signal is issued for each FEA 4. The FEA begins the synchronous data transfer from internal FIFOs to the G-link DATA INPUT/OUTPUT MODULE 1. Decode the READ EVENT and propagates it to FEAs 2. ELEFANT chips are readout into local FIFOs 3. After ≈ 20 μs (fixed delay) a GRANT signal is issued for each FEA 4. The FEA begins the synchronous data transfer from internal FIFOs to the G-link NO Zero Suppression 16 x 60 Mbits/sec  960 Mbits/sec  manages ROIB DAQ rate (≈ 20 kHz) NO Zero Suppression 16 x 60 Mbits/sec  960 Mbits/sec  manages ROIB DAQ rate (≈ 20 kHz) 4 Modules

SuperB-DCH LNF SuperB Workshop – Dec 09 S ervizio E lettronico L aboratori F rascati G. Felici BABAR FEE – DC Trigger Mbits/sec  12.8 µsec ≈ 78 kHz Chain  Trigger interface require hit information from every channel at a trigger rate of 3.7 MHz  The ELEFANT presents on 8 output pins the status of readout buffer at a sample rate of MHz Presence of TDC data in the sampling period or over-threshold signal from ADC  A dedicated FPGA in ADB board provide down sample of ELEFANT trigger data output (by stretching and multiplexing) to 3.7 MHz and serialized on the ROIB on a 59.5 MHz line.  16 data channels are sent out on each 59.5 MHz trigger link to the Trigger Input/Output Module (TIOM).  The TIOM multiplexes 20 links on a fiber that is sent to the trigger system Chain  Trigger interface require hit information from every channel at a trigger rate of 3.7 MHz  The ELEFANT presents on 8 output pins the status of readout buffer at a sample rate of MHz Presence of TDC data in the sampling period or over-threshold signal from ADC  A dedicated FPGA in ADB board provide down sample of ELEFANT trigger data output (by stretching and multiplexing) to 3.7 MHz and serialized on the ROIB on a 59.5 MHz line.  16 data channels are sent out on each 59.5 MHz trigger link to the Trigger Input/Output Module (TIOM).  The TIOM multiplexes 20 links on a fiber that is sent to the trigger system 3.75 Mbits/sec  38 µsec ≈ 26 kHz Mbits/sec ≈ 1.74 Gbits/sec

SuperB-DCH LNF SuperB Workshop – Dec 09 S ervizio E lettronico L aboratori F rascati G. Felici OL - SuperB DCH vs BABAR DCH Super-B DAQ/Trigger numbers  150 kHz L1 (average) trigger rate  ≈ cells  ≈ 20% occupancy (1 μs time window)  DAQ ≈ 8 bytes/ch (average)  Trigger ≈ 1 7 MHz Super-B DAQ/Trigger numbers  150 kHz L1 (average) trigger rate  ≈ cells  ≈ 20% occupancy (1 μs time window)  DAQ ≈ 8 bytes/ch (average)  Trigger ≈ 1 7 MHz BaBar DAQ/Trigger numbers  2.5 kHz L1 (average) trigger  7104 cells  ≈ 10% occupancy  DAQ ≈ 8 bytes/ch (average)  Trigger ≈ MHz BaBar DAQ/Trigger numbers  2.5 kHz L1 (average) trigger  7104 cells  ≈ 10% occupancy  DAQ ≈ 8 bytes/ch (average)  Trigger ≈ MHz OL Estimation according to the BABAR experience BABAR DAQ/Trigger OL (1.2 Gbits/sec) DATA  4 OL (layout requirement) ≈ 8 X L1 trigger rate requirement) TRIGGER  24 OL ECS  Managed by DATA I/O modules (CAN standard) BABAR DAQ/Trigger OL (1.2 Gbits/sec) DATA  4 OL (layout requirement) ≈ 8 X L1 trigger rate requirement) TRIGGER  24 OL ECS  Managed by DATA I/O modules (CAN standard) Super-B DAQ/Trigger OL (2 Gbits/sec) DATA  30 OL (including a x3 safety factor) TRIGGER  35 OL (increase of sampling frequency & channels) ECS  8 OL (layout driven) Super-B DAQ/Trigger OL (2 Gbits/sec) DATA  30 OL (including a x3 safety factor) TRIGGER  35 OL (increase of sampling frequency & channels) ECS  8 OL (layout driven) DAQ  150×10 3 (L1 rate)×10 4 (N. of cells)×0.2(occupancy )×8(N. of bytes/ev)×8(1 byte = 8 bits)  19.2 Gbits/sec (average) TRIGGER  10 4 (N. of cells)×7x10 6  70 Gbits/sec OL Estimation according to the BW

SuperB-DCH LNF SuperB Workshop – Dec 09 S ervizio E lettronico L aboratori F rascati G. Felici FEE architecture – Scenario1 SCENARIO 1 ONLY HV distribution and preamplifier boards located on the end-plate Pros : minimization of the material added to the end-plate reduction of the power dissipation on the end plate (no cooling required or low airflow) minimization of the radiation environment issue possibility of using commercial available devices for data conversion Full system reliability Cons : 10k cables required to extract signals (either micro-coax or twisted) SCENARIO 1 ONLY HV distribution and preamplifier boards located on the end-plate Pros : minimization of the material added to the end-plate reduction of the power dissipation on the end plate (no cooling required or low airflow) minimization of the radiation environment issue possibility of using commercial available devices for data conversion Full system reliability Cons : 10k cables required to extract signals (either micro-coax or twisted) 18 mm 12 coax-cables + 2 PS 1.2 mm Material Budget HV distribution board and Preamplifier input signals routing 0.5 mm FR4 70 μm copper (not homogeneous) smd components and connectors (not homogeneous) Preamplifier boards 0.5 mm FR4 70 μm copper (not homogeneous) smd components and connectors (not homogeneous) Cables (coaxial) Shield : 150 μm copper Material Budget HV distribution board and Preamplifier input signals routing 0.5 mm FR4 70 μm copper (not homogeneous) smd components and connectors (not homogeneous) Preamplifier boards 0.5 mm FR4 70 μm copper (not homogeneous) smd components and connectors (not homogeneous) Cables (coaxial) Shield : 150 μm copper Min: 1 mm FR4 Max: 1 mm FR μm copper + 3 mm ceramics Min: 1 mm FR4 Max: 1 mm FR μm copper + 3 mm ceramics

SuperB-DCH LNF SuperB Workshop – Dec 09 S ervizio E lettronico L aboratori F rascati G. Felici FEE components – Scenario2 SCENARIO 2 Full FEE chain located on the end-plate Pros : reduction of the number of connections between DCH and DAQ Cons : two layers of boards plus shielding must be placed on the end-plate with not negligible increase of the material added to the end-plate (shielding is required as digital logic is continuously working for data conversion and serialization) power dissipation is increased and cooling is required to limit power dissipation dedicated radiation tolerant devices (ASIC) are required and ASIC design is a time consuming and expensive task. Power supply cables must delivery more current  bigger sections are required Reliability of the full system SCENARIO 2 Full FEE chain located on the end-plate Pros : reduction of the number of connections between DCH and DAQ Cons : two layers of boards plus shielding must be placed on the end-plate with not negligible increase of the material added to the end-plate (shielding is required as digital logic is continuously working for data conversion and serialization) power dissipation is increased and cooling is required to limit power dissipation dedicated radiation tolerant devices (ASIC) are required and ASIC design is a time consuming and expensive task. Power supply cables must delivery more current  bigger sections are required Reliability of the full system Material Budget HV distribution board and Preamplifier input signals routing 0.5 mm FR4 70 μm copper (not homogeneous) smd components and connectors (not homogeneous) Preamplifier boards 0.5 mm FR4 70 μm copper (not homogeneous) smd components and connectors (not homogeneous) ReadOut Board Multi-Layer PCB (8 layers) 1.6 mm FR4 280 μm copper (not homogeneous) Concentrators (Data I/O module) Multi-Layer PCB (8 layers) 1.4 mm FR4 280 μm copper (not homogeneous) Shield to avoid interference from ReadOut Boards and Concentrators ( ≈ 300 μm copper) Cooling ??? (the thickest part in BABAR) Material Budget HV distribution board and Preamplifier input signals routing 0.5 mm FR4 70 μm copper (not homogeneous) smd components and connectors (not homogeneous) Preamplifier boards 0.5 mm FR4 70 μm copper (not homogeneous) smd components and connectors (not homogeneous) ReadOut Board Multi-Layer PCB (8 layers) 1.6 mm FR4 280 μm copper (not homogeneous) Concentrators (Data I/O module) Multi-Layer PCB (8 layers) 1.4 mm FR4 280 μm copper (not homogeneous) Shield to avoid interference from ReadOut Boards and Concentrators ( ≈ 300 μm copper) Cooling ??? (the thickest part in BABAR) Min: 2.6 mm FR μm copper Max: 2.6 mm FR μm copper + 3 mm ceramics + cooling Min: 2.6 mm FR μm copper Max: 2.6 mm FR μm copper + 3 mm ceramics + cooling

SuperB-DCH LNF SuperB Workshop – Dec 09 S ervizio E lettronico L aboratori F rascati G. Felici DCH FEE Power Dissipation & Radiation Environment DCH Power Dissipation ≈ 1.7 kW Radiation Environment  Spartan 3 XC3S1500  SEU (neutrons) ≈ 2kHz/cm2 estimated rate  FPGA must be reconfigured Radiation Environment  Spartan 3 XC3S1500  SEU (neutrons) ≈ 2kHz/cm2 estimated rate  FPGA must be reconfigured 2/days Nobody cares Material Budget BABAR Super-B (Estimate) On Detector FEE - Scenario1 On Detector FEE - Scenario2  Pd < 300 W * (including some shaping/amplification)  No cooling required (or low air flush)  Radiation Environment : low sensitivity (no FPGA)  Material budget: low  Pd < 300 W * (including some shaping/amplification)  No cooling required (or low air flush)  Radiation Environment : low sensitivity (no FPGA)  Material budget: low  Pd ≈ 1.5/2 kW  Cooling required  Radiation Environment : large use of FPGA  SEU problems  Material budget: high  Pd ≈ 1.5/2 kW  Cooling required  Radiation Environment : large use of FPGA  SEU problems  Material budget: high * In KLOE (12k channels) was 100W

SuperB-DCH LNF SuperB Workshop – Dec 09 S ervizio E lettronico L aboratori F rascati G. Felici 1.BABAR used 4 – 1 Gibits/sec OL for DAQ and 24 – 1.2 Gbits/sec for L1 rate = 2.5kHz 2.Our estimate based on a L1 trigger rate of 150 kHz and 10k DCH is about Gbits/sec OL for DAQ and about Gbits/sec OL for trigger 3.ECS number of links is mainly driven by layout considerations. 4 OL should be enough 4.Power dissipation, radiation environment and material budget are real issues if the full FEE chain will be located on the DCH end-plates Conclusions